TenderDekho Logo
Closed GEM

Uttar Pradesh Cooperative Sugar Factories Federation Limited CI Diffuser & Pump Components Tender Bagpat UP 2026

Bid Publish Date

08-Aug-2026, 3:45 pm

Bid End Date

20-Aug-2026, 7:00 pm

Progress

Issue08-Aug-2026, 3:45 pm
AwardPending

Tender Overview

The procurement is issued by the Uttar Pradesh Cooperative Sugar Factories Federation Limited for multiple mechanical components including CI diffusers, rubber O rings, shaft protection sleeves, gaskets, impellers, stage sleeves, spacer sleeves, CI balancing discs, CI counter balancing discs, and shafts for feed pumps. Tender is located in Bagpat, Uttar Pradesh (250101) with 11 total item lines referenced in the BOQ, though exact quantities are not disclosed. The buyer has included a 25% quantity adjustment option at contract award and during currency, at contracted rates. Delivery windows hinge on the last date of the original delivery order with minimum 30 days extension, and the option clause may extend delivery up to the original period. This ATC-driven tender seeks suppliers capable of providing a diversified set of pump-related components under a unified procurement exercise.

  • Organization: Uttar Pradesh Cooperative Sugar Factories Federation Limited
  • Location: Bagpat, Uttar Pradesh
  • Category: CI Diffuser, O Ring, Shaft Protection Sleeve, Gasket, Impeller, Stage Sleeve, Spacer Sleeve, CI Balancing Disc, CI Counter Balancing Disc, Shaft for Feed Pump
  • Scope: 11 item lines, no explicit quantity disclosed
  • Key differentiator: Option clause enabling up to 25% quantity variation during and after contract formation
  • ATC/terms: Delivery period rules based on last delivery order date; extended time formula is (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Technical Specifications & Requirements

  • No explicit technical specifications or performance metrics are provided in the tender data
  • Items listed indicate mechanical components associated with feed pumps and related pump housings
  • Proposed categories include: CI diffuser, O rings, shaft sleeves, gaskets, impellers, stage sleeves, spacer sleeves, balancing discs, counter balancing discs, and shafts
  • Absence of standard numbers (e.g., IS, ISO) in the published data; ATC terms imply compliance with contract requirements rather than prescriptive technical specs
  • BOQ shows 11 total items with no N/A quantities disclosed; bidders should assume generic precision metal components and sealing parts quality
  • The ATC document referenced may contain detailed standards and testing regimes not visible in current data

Terms, Conditions & Eligibility

  • EMD: Not disclosed in the public data; bidders should verify through ATC/document view
  • Delivery: Delivery period aligned to the last date of original delivery order; extension formula applies with a minimum 30 days
  • Option clause: Quantity can be increased up to 25% of bid quantity during contract placement and during currency
  • Payment terms: Not specified in the data; verify in ATC and purchase order terms
  • Docs required: GST, PAN, experience certificates, financials, EMD proof, technical compliance docs, OEM authorizations (as per standard tender practice)
  • Warranty/penalties: Not specified; review ATC for penalties or LD clauses
  • Eligibility criteria: References to prior experience in similar pump component supply and financial capability; confirm through bidder qualification section
  • Special clauses: ATC may include additional conditions; bidders must view the uploaded ATC document to ensure full compliance

Key Specifications

    • Product/service names: CI diffusers, rubber o rings, shaft protection sleeves, gaskets, impellers, stage sleeves, spacer sleeves, CI balancing discs, CI counter balancing discs, shafts for feed pump
    • Quantities: 11 total items listed; exact quantities not disclosed in BOQ information
    • Estimated value: Not disclosed; no numeric estimates available in tender data
    • Compliance/certifications: Not specified in data; likely to be detailed in ATC
    • Delivery: 30-day minimum extension rule; delivery timeline tied to last delivery order date

Terms & Conditions

  • Option clause allows up to 25% quantity variation during contract.

  • Delivery period extends from last date of original/due delivery order with minimum 30 days extension.

  • ATC document governs additional terms and supplier eligibility; ensure view and compliance.

Important Clauses

Payment Terms

Payment terms not stated in public data; verify in ATC and purchase order terms.

Delivery Schedule

Delivery begins from the last date of the original delivery order; minimum 30 days extension applies for extended delivery periods.

Penalties/Liquidated Damages

Not specified in available data; confirm LD clauses in ATC and contract.

Bidder Eligibility

  • Experience in supplying pump components or similar mechanical parts

  • Financial stability demonstrated by latest financial statements

  • Compliance with GST and PAN requirements and OEM authorizations (where applicable)

Authority & Contact

Organization

N/a

Office Name

Lucknow

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

32

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

C.I Diffuser , Rubber o Ring , Shaft Protection sleeve , Gasket , Impeller , Stage Sleeve , Spacer Sleeve , C.I Balancing Disc , C.I Counter Balancing Disc , Shaft for Feed Pump

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

365

Delivery Locations

1

Delivery Cities

Baghpat

Delivery Pincodes

250609

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Satya Pal Sharma250609,The Baghpat Co- operative Sugar Mills Ltd.,BAGHPAT-250609,Distt.- Baghpat(UP) GST No. 09AAAAT0568P1ZXBaghpatUttar Pradesh2506093365-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9729874.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

C.I Diffuser

C.I Diffuser for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr

3 nos Delivery: 365 days
#2

Rubber o Ring

Synthetic Rubber O Ring for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr

2 set Delivery: 365 days
#3

Shaft Protection sleeve

Shaft Protection Sleeve (LHS) for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr

3 nos Delivery: 365 days
#4

Shaft Protection sleeve

Shaft Protection Sleeve (RHS) for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr

3 nos Delivery: 365 days
#5

Gasket

Gasket set for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr

3 set Delivery: 365 days
#6

Impeller

Impeller for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr.

3 nos Delivery: 365 days
#7

Stage Sleeve

Stage sleeve for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr.

6 nos Delivery: 365 days
#8

Spacer Sleeve

Spacer sleeve for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr.

2 nos Delivery: 365 days
#9

C.I Balancing Disc

C.I Balancing Disc for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr.

3 nos Delivery: 365 days
#10

C.I Counter Balancing Disc

C.I Counter Balancing Disc for KSB make Feed Pump Size WL/100/4 HWD capacity 80 m3/Hr . RPM 2965, Head 322 mtr.

3 nos Delivery: 365 days
#11

Shaft for Feed Pump

Shaft for KSB Make Feed Pump Size WL 100/4 HWD, Capacity - 80 M3/Hrs, Head - 322 Mtr., RPM - 2965

1 nos Delivery: 365 days

Categories 33

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience certificates for similar pump component supply

4

Financial statements (last 3 years)

5

EMD/Security deposit document (as applicable)

6

Technical bid documents demonstrating compliance with required components

7

OEM authorizations or authorized dealership letters (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for CI diffuser and pump components tender in Bagpat UP 2026?

Bidders should review the ATC for this UP Sugar Federations tender, gather GST, PAN, experience certificates, financials, and EMD proof, and ensure OEM authorizations if required. Ensure delivery terms meet the 30-day minimum extension rule and prepare to handle up to a 25% quantity variation.

What documents are required for Bagpat pump components tender in UP?

Required documents include GST registration, PAN card, three years of financial statements, experience certificates for similar work, EMD proof, technical bid documents, and OEM authorizations or dealership letters. Ensure all documents are current and properly scanned for the online submission.

What is the delivery extension rule for UP sugar federation tender?

Delivery can be extended using the option clause: increased quantity ÷ original quantity × original delivery period, with a minimum extension of 30 days; extension can apply to the contracted or currency period, as per contract terms.

Are there any specific standards for pump components in Bagpat UP tender?

Current public data lacks explicit IS/ISO standards. Review the uploaded ATC for standards, testing, and certification requirements; ensure components meet any stated buyer specifications before bidding.

What are the penalties for late delivery in this UP tender?

Penalties/LD details are not disclosed in the public data; bidders must consult the ATC and contract documents to confirm LD rates, grace periods, and recovery terms.

When does the procurement opportunity close for Bagpat UP components?

The end date is not provided in the public data; bidders should check the official ATC document view and bid submission portal for final submission deadlines and any addenda.

How to ensure OEM authorization is valid for UP pump components tender?

Obtain current OEM authorization letters or authorized dealer agreements, ensure they cover CI diffusers, gaskets, impellers, and pump shafts, and attach these with the technical bid as per ATC guidance.

What is the scope of 25% quantity variation in Bagpat tender?

The purchaser may increase the ordered quantity by up to 25% of the bid quantity at contract award and during contract currency, influencing delivery planning and pricing consistency per contracted rates.