Bid Publish Date
28-Sep-2026, 2:06 pm
Bid End Date
12-Oct-2026, 2:00 pm
EMD
₹20,000
Value
₹11,51,678
Location
Progress
Irel (india) Limited has released a public tender for Pultruded FRP P-FRP Structural Framework complete with Columns, Beams, Bracings and Supports for Cooling Tower, PP RING FillS complete for Cooling Tower, PVC Multipass Drift Eliminators, FRP Casing Sheets complete with FRP Corner Profiles and Fastening Accessories, Aluminium Fan Assembly complete with Hub, Direct Drive Assembly complete with Mounting Arrangement, FRP Fan Stack or Fan Cylinder, PVC plus FRP Hot Water Distribution System complete with Header Pipes and Distribution Network, Polypropylene PP Spray Nozzles, Fixing clamps and supporting arrangements in GANJAM, ODISHA. Quantity: 20. Submission Deadline: 12-10-2026 14: 00: 00. Download documents and apply online.
Quantity
20
Category
Pultruded FRP P-FRP Structural Framework complete with Columns, Beams, Bracings and Supports for Cooling Tower
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
Warranty Period
1 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Pultruded FRP P-FRP Structural Framework complete with Columns, Beams, Bracings and Supports for Cooling Tower , PP RING FillS complete for Cooling Tower , PVC Multipass Drift Eliminators , FRP Casing Sheets complete with FRP Corner Profiles and Fastening Accessories , Aluminium Fan Assembly complete with Hub , Direct Drive Assembly complete with Mounting Arrangement , FRP Fan Stack or Fan Cylinder , PVC plus FRP Hot Water Distribution System complete with Header Pipes and Distribution Network , Polypropylene PP Spray Nozzles , Fixing clamps and supporting arrangements
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
17
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Ganjam
Delivery Pincodes
761045
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ashutosh Pandey | 761045,IREL(India) Limited PO MATIKHALO,CHATRAPUR Ganjam District. | Ganjam | Odisha | 761045 | 2 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Pultruded FRP P-FRP Structural Framework complete with Columns, Beams, Bracings and Supports for Cooling Tower
Pultruded FRP (P-FRP) Structural Framework complete with Columns, Beams, Bracings and Supports for Cooling Tower
PP RING FillS complete for Cooling Tower
PP RING FillS complete for Cooling Tower
PVC Multipass Drift Eliminators
PVC Multipass Drift Eliminators
FRP Casing Sheets complete with FRP Corner Profiles and Fastening Accessories
FRP Casing Sheets complete with FRP Corner Profiles and Fastening Accessories
Aluminium Fan Assembly complete with Hub
Aluminium Fan Assembly complete with Hub
Direct Drive Assembly complete with Mounting Arrangement
Direct Drive Assembly complete with Mounting Arrangement
FRP Fan Stack or Fan Cylinder
FRP Fan Stack / Fan Cylinder
PVC plus FRP Hot Water Distribution System complete with Header Pipes and Distribution Network
PVC + FRP Hot Water Distribution System complete with Header Pipes and Distribution Network
Polypropylene PP Spray Nozzles
Polypropylene (PP) Spray Nozzles
Fixing clamps and supporting arrangements
Fixing clamps and supporting arrangements
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Pultruded FRP P-FRP Structural Framework complete with Columns, Beams, Bracings and Supports for Cooling Tower | Pultruded FRP (P-FRP) Structural Framework complete with Columns, Beams, Bracings and Supports for Cooling Tower | 2 | set | [email protected] | 90 | |
| 2 | PP RING FillS complete for Cooling Tower | PP RING FillS complete for Cooling Tower | 2 | set | [email protected] | 90 | |
| 3 | PVC Multipass Drift Eliminators | PVC Multipass Drift Eliminators | 2 | set | [email protected] | 90 | |
| 4 | FRP Casing Sheets complete with FRP Corner Profiles and Fastening Accessories | FRP Casing Sheets complete with FRP Corner Profiles and Fastening Accessories | 2 | set | [email protected] | 90 | |
| 5 | Aluminium Fan Assembly complete with Hub | Aluminium Fan Assembly complete with Hub | 2 | set | [email protected] | 90 | |
| 6 | Direct Drive Assembly complete with Mounting Arrangement | Direct Drive Assembly complete with Mounting Arrangement | 2 | set | [email protected] | 90 | |
| 7 | FRP Fan Stack or Fan Cylinder | FRP Fan Stack / Fan Cylinder | 2 | set | [email protected] | 90 | |
| 8 | PVC plus FRP Hot Water Distribution System complete with Header Pipes and Distribution Network | PVC + FRP Hot Water Distribution System complete with Header Pipes and Distribution Network | 2 | set | [email protected] | 90 | |
| 9 | Polypropylene PP Spray Nozzles | Polypropylene (PP) Spray Nozzles | 2 | set | [email protected] | 90 | |
| 10 | Fixing clamps and supporting arrangements | Fixing clamps and supporting arrangements | 2 | set | [email protected] | 90 |
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer