Bid Publish Date
20-Aug-2026, 5:55 pm
Bid End Date
03-Sep-2026, 10:00 am
Location
Progress
Public procurement opportunity for Indian Air Force Muffle Furnace (Q3) in BAREILLY, UTTAR PRADESH. Quantity: 1 issued by. Submission Deadline: 03-09-2026 10: 00: 00. View full details and respond.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Muffle Furnace (Q3)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Bareilly
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bareilly | Bareilly | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Specification | Temperature range °C | 900-1400, 100-975 |
| Specification | Continuous operating temp °C | 800-1300 |
| Specification | Temperature Accuracy | +/- 1°C (+/- 1.8°F) |
| Specification | Heating element | Kanthal wire |
| Specification | Temperature Controller | PID Controller |
| Specification | Thermocouple | K Type |
| Specification | Phase | Single, Triple |
| Certification | Calibration certificate from NABL approved Lab | Yes |
| Construction | Volume | 5.0 |
| Construction | Display | LCD |
| Construction | Chamber MOC | Ceramic High Density Fibre Board, Silicon Carbide for energy efficient and better uniformity |
| Construction | Insulation | Ceramic fiber blanket, Ultra High Purity Alumina Low Thermal Mass Insulation |
| Construction | Safety Device Fitted | Yes |