Progress
Quantity
1257
Category
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701
Bid Type
Two Packet Bid
Indian Army announces a tender for Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3), Bathroom or Toilet Mirror (V3) (Q4), Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3), Towel Ring (Q3), Towel Rail (Q3), PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3), XLPE Cable for Working Voltage up to and Including 1. 1 KV Marked To IS 7098 (Part 1) (Q2), LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2), LED Batten Light (LED Tube Light) (V2) (Q2), Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2), LED Bulkhead Light (Q3) in SIRSA, HARYANA. Quantity: 1257. Submission Deadline: 31-07-2026 14: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) , Bathroom or Toilet Mirror (V3) (Q4) , Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) , Towel Ring (Q3) , Towel Rail (Q3) , PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3) , XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) , LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2) , LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) , LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) , LED Batten Light (LED Tube Light) (V2) (Q2) , Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2) , LED Bulkhead Light (Q3)
Advisory Bank
State Bank of India
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Sirsa
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Sirsa | Sirsa | - | - | 2 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Generic Requirement | Type (Based on Shape of Tank) | Cylindrical Vertical Tank with Lid |
| Generic Requirement | Layer of Tank | Double Layered |
| Dimensions | Minimum Net Capacity (In Liter) | 500 Liter |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS