TenderDekho Logo
Closed GEM

Government Tender Published for SITC of Pressure Monitoring System for Cleanroom Differential Pressure Transmitters,SITC of Pressur in NAGPUR, MAHARASHTRA

Bid Publish Date

10-Aug-2026, 5:20 pm

Bid End Date

31-Aug-2026, 6:00 pm

EMD

₹2,42,360

Progress

Issue10-Aug-2026, 5:20 pm
AwardPending

All India Institute Of Medical Sciences (aiims) announces a tender for SITC of Pressure Monitoring System for Cleanroom Differential Pressure Transmitters, SITC of Pressur in NAGPUR, MAHARASHTRA. Quantity: 3213. Submission Deadline: 31-08-2026 18: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

3213

Category

SITC of Air Handling Unit 2500 CFM Double Skin Chilled Water Type

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Advisory Bank

Bank Of Baroda

ePBG Percentage

3%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

150

Delivery Locations

1

Delivery Cities

Nagpur

Delivery Pincodes

441108

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Nikhil Bhagwatiprasad Pandey441108,All India Institute of Medical Sciences, Nagpur, Plot No. 2, Sector - 20, MIHAN, Nagpur, Pin: 441108NagpurMaharashtra4411084150-

Authority Records

MINISTRY OF HEALTH AND FAMILY WELFAREHEALTH AND FAMILY WELFARE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9714479.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 78 Items Sign in for GEM prices

#1

SITC of Pressure Monitoring System for Cleanroom Differential Pressure Transmitters

As per Scope of work

4 nos Delivery: 150 days
#2

SITC of Pressure Relief Dampers GI Spring Loaded Airtight

As per Scope of work

4 nos Delivery: 150 days
#3

Dismantling and Blinding of GI Air Duct and MS Chilled Water Pipeline

As per Scope of work

1 job Delivery: 150 days
#4

SITC of Air Handling Unit 2500 CFM Double Skin Chilled Water Type

As per Scope of work

1 no Delivery: 150 days
#5

SITC of Evaporative Cooling Plant Air Washer 2500 CFM

As per Scope of work

1 no Delivery: 150 days
#6

SITC of Double Skin Horizontal Floor Mounted Exhaust Air Ventilation Units 4000 CFM

As per Scope of work

2 nos Delivery: 150 days
#7

SITC of VFD Drive for AHU Air Washer Exhaust System with Control Panel

As per Scope of work

4 nos Delivery: 150 days
#8

Supply and Installation of Factory Fabricated 1 mm GSS Sheet Metal Rectangular Ducting

As per Scope of work

300 sqm Delivery: 150 days
#9

Supply and Fixing of 25 mm Thick Closed Cell Nitrile Rubber Insulation on Ducts

As per Scope of work

150 sqm Delivery: 150 days
#10

SITC of Powder Coated Extruded Aluminium Supply Air Grills with Volume Control Dampers

As per Scope of work

8 sqm Delivery: 150 days
#11

SITC of Powder Coated Extruded Aluminium Return Air Grills with Louvers and Volume Control Dampers

As per Scope of work

8 sqm Delivery: 150 days
#12

SITC of GI Volume Control Duct Damper with Neoprene Rubber Gaskets

As per Scope of work

8 sqm Delivery: 150 days
#13

SITC of Variable Air Volume VAV Unit SS316 Body Motorized Actuator

As per Scope of work

3 nos Delivery: 150 days
#14

Supply and Installation of Manually Operated Butterfly Valves 40 mm Dia

As per Scope of work

2 nos Delivery: 150 days
#15

SITC of 40 mm Dia Chilled Water Piping with Insulation and Aluminium Cladding

As per Scope of work

36 meter Delivery: 150 days
#16

SITC of 32 mm Dia Chilled Water Piping with Insulation and Cladding

As per Scope of work

6 meter Delivery: 150 days
#17

SITC of 6 Kg ABC Type Fire Extinguisher with Wall Mounting Brackets

As per Scope of work

2 nos Delivery: 150 days
#18

SITC of 4.5 Kg CO2 Fire Extinguisher with Wall Mounting Brackets

As per Scope of work

2 nos Delivery: 150 days
#19

Supply and Laying of 2C x 1.5 Sqmm FRLS Armoured Cable

As per Scope of work

50 rmt Delivery: 150 days
#20

Dismantling and Reinstallation of Sprinkler Pipeline and Smoke Detectors

As per Scope of work

1 job Delivery: 150 days
#21

SITC of 15 mm Medical Grade Copper Pipe

As per Scope of work

100 rmt Delivery: 150 days
#22

SITC of 22 mm Medical Grade Copper Pipe

As per Scope of work

50 rmt Delivery: 150 days
#23

SITC of 4 Gas Valve Box O2 Medical Air Vacuum Recessed Type

As per Scope of work

1 no Delivery: 150 days
#24

SITC of LCD Type Medical Gas Alarm System 4 Gas

As per Scope of work

1 no Delivery: 150 days
#25

SITC of Single Arm Anaesthesia Pendant Ceiling Mounted

As per Scope of work

1 no Delivery: 150 days
#26

SITC of Single Dome OT LED Surgical Light Ceiling Mounted

As per Scope of work

1 no Delivery: 150 days
#27

SITC of Dual Panel LED Type X Ray View Box Operating List Board

As per Scope of work

1 no Delivery: 150 days
#28

SITC of Operating Room Instrument Cabinet SS 304

As per Scope of work

2 nos Delivery: 150 days
#29

Demolishing Brick Work Manually or by Mechanical Means

As per Scope of work

4 cum Delivery: 150 days
#30

Dismantling Doors Windows and Clerestory Windows including Chowkhats

As per Scope of work

8 each Delivery: 150 days
#31

Taking Out Door Window Shutters Area up to 3 Sqm

As per Scope of work

3 sqm Delivery: 150 days
#32

Dismantling Tile Work in Floors Roofs 10 mm to 25 mm Thick

As per Scope of work

3 sqm Delivery: 150 days
#33

Disposal of Building Rubbish Malba beyond 50 m Lead

As per Scope of work

6 cum Delivery: 150 days
#34

Providing RCC Cement Concrete 1 2 4 Mix

As per Scope of work

2 cum Delivery: 150 days
#35

Precast Cast in Situ RCC Work for Bands String Courses Bed Plates

As per Scope of work

1 cum Delivery: 150 days
#36

Steel Reinforcement for RCC Work Fe 500D or Higher TMT Bars

As per Scope of work

110 kg Delivery: 150 days
#37

Brick Work in Superstructure above Plinth to Floor V in Cement Mortar 1 6

As per Scope of work

13 cum Delivery: 150 days
#38

Half Brick Masonry in Cement Mortar 1 4

As per Scope of work

7 sqm Delivery: 150 days
#39

15 mm Cement Plaster on Rough Side of Single Half Brick Wall in CM 1 6

As per Scope of work

65 sqm Delivery: 150 days
#40

Acrylic Distemper Ready Mixed 2 or More Coats over Priming Coat

As per Scope of work

120 sqm Delivery: 150 days
#41

White Cement Based Putty Average 1 mm Thickness over Plastered Surface

As per Scope of work

65 sqm Delivery: 150 days
#42

Wall Panel System 50 mm Cleanroom Compliant Double Skin PPGI PUF

As per Scope of work

65 sqm Delivery: 150 days
#43

Ceiling Panel System 50 mm Cleanroom Compliant

As per Scope of work

28 sqm Delivery: 150 days
#44

Corner Coving for Cleanroom Aluminium Extruded Medical Grade Powder Coated

As per Scope of work

55 rmt Delivery: 150 days
#45

SITC of Hermetically Sealed Swing Door 2100 x 1500 mm SS 304

As per Scope of work

1 no Delivery: 150 days
#46

SITC of Automatic Hermetically Sealed Sliding Door 2100 x 1500 1800 mm

As per Scope of work

2 no Delivery: 150 days
#47

SITC of Automatic Hermetically Sealed Sliding Door as per AERB Norms

As per Scope of work

1 no Delivery: 150 days
#48

PVC Flooring Finish with Self Levelling 2 mm Antistatic Conductive Seamless Roll

As per Scope of work

28 sqm Delivery: 150 days
#49

Removal and Refixing of Mineral Fibre False Ceiling Tiles 595 x 595 mm

As per Scope of work

70 sqm Delivery: 150 days
#50

False Ceiling with GI Framework and 12.5 mm Thick Moisture Resistant Gypsum Board

As per Scope of work

45 sqm Delivery: 150 days
#51

Steel Work in Built Up Tubular Trusses Hot Finished Seamless Tubes

As per Scope of work

200 kg Delivery: 150 days
#52

Painting with Synthetic Enamel Paint One or More Coats

As per Scope of work

400 sqm Delivery: 150 days
#53

ACP Work 3 mm ACP Sheet for Covering of Exhaust Ducting

As per Scope of work

70 sqm Delivery: 150 days
#54

SITC of 1 Bay Floor Model Surgical Scrub Station Sensor and Foot Pedal Operated

As per Scope of work

1 no Delivery: 150 days
#55

Refixing of Dismantled Door to AHU Room

As per Scope of work

1 job Delivery: 150 days
#56

Providing and Fixing of 250 A 36 kA FP MCCB with Thermomagnetic Release

As per Scope of work

2 nos Delivery: 150 days
#57

End Termination for 3.5 x 240 Sqmm Aluminium Cable with Brass Compression Gland

As per Scope of work

6 nos Delivery: 150 days
#58

SITC of MCCB Drawout Enclosure Panel Complete with All Accessories

As per Scope of work

2 nos Delivery: 150 days
#59

SITC of 240 Sqmm 4 Core Aluminium Armoured Power Cable

As per Scope of work

160 metres Delivery: 150 days
#60

SITC of 250 A Bus Bar Box Complete with Accessories

As per Scope of work

1 no Delivery: 150 days
#61

SITC of Bed Head Panels Horizontal Wall Mounted Extruded Aluminium

As per Scope of work

4 nos Delivery: 150 days
#62

Supplying and Fixing of 8 Way Double Door TPN MCB Distribution Board

As per Scope of work

2 nos Delivery: 150 days
#63

Supplying and Fixing of Cable End Box Loose Wire Box for 8 Way Double Door TPN MCB DB

As per Scope of work

2 nos Delivery: 150 days
#64

Supplying and Fixing of 100 A Four Pole Isolator

As per Scope of work

2 nos Delivery: 150 days
#65

Supplying and Fixing of 63 A Double Pole RCCB 30 mA

As per Scope of work

6 nos Delivery: 150 days
#66

Supplying and Fixing of Single Pole MCB 5 A to 32 A C Curve 10 kA

As per Scope of work

36 nos Delivery: 150 days
#67

Supplying and Fixing of Single Pole Blanking Plate

As per Scope of work

10 nos Delivery: 150 days
#68

Supply Installation Testing and Commissioning of Compatible Battery Bank for Existing 25 kVA Online UPS

As per Scope of work

1 no Delivery: 150 days
#69

Wiring for Light Fan Exhaust Fan Call Bell Points Group C with 1.5 Sqmm FRLS Copper Cable in Steel Conduit

As per Scope of work

25 points Delivery: 150 days
#70

Circuit Sub Main Wiring 2 x 2.5 Sqmm plus 1 x 2.5 Sqmm Earth Wire in Steel Conduit

As per Scope of work

80 metres Delivery: 150 days
#71

Circuit Sub Main Wiring 2 x 4 Sqmm plus 1 x 4 Sqmm Earth Wire in Steel Conduit

As per Scope of work

200 metres Delivery: 150 days
#72

Circuit Sub Main Wiring 2 x 6 Sqmm plus 1 x 6 Sqmm Earth Wire in Steel Conduit

As per Scope of work

300 metres Delivery: 150 days
#73

Circuit Sub Main Wiring 4 x 10 Sqmm plus 2 x 6 Sqmm Earth Wire in Steel Conduit

As per Scope of work

150 metres Delivery: 150 days
#74

Circuit Sub Main Wiring 4 x 16 Sqmm plus 2 x 6 Sqmm Earth Wire in Steel Conduit

As per Scope of work

20 metres Delivery: 150 days
#75

Group Controlled Looped Wiring for Light Fan Points Group C

As per Scope of work

15 points Delivery: 150 days
#76

SITC of LED Panel Light 2 x 2 ft 36 Watt

As per Scope of work

30 nos Delivery: 150 days
#77

Supplying and Fixing of 5 6 A Modular Socket Outlets with Switches

As per Scope of work

20 nos Delivery: 150 days
#78

Supplying and Fixing of 15 16 A Modular Socket Outlets with Switches

As per Scope of work

15 nos Delivery: 150 days

Categories 187

COPPER WIRE BLOCK WORK AIR WASHER WATER DISTRIBUTION APFC PANEL AHU BARITONE HORNS BUILDING CONSTRUCTION PAINTING COPPER COIL DISTRIBUTION BOARD INTERIOR COPPER CABLE COOLING FAN UPS BUTTERFLY VALVES EARTH WIRE ALUM POWER CABLE CABBING EQUIPMENTS WALL CONSTRUCTION PERISTALTIC PUMPS ARNO STARTING CONTACTOR DUCT SUPPLY AIR COOLED ENGINE DESERT COOLER ELECTRICAL PRODUCTS SENSOR BUS CABLE SWITCH YARD WIRING ASSEMBLY DISTRIBUTION?BOX CHROMATOGRAPHY REFRIGERATORS SWITCHING APPARATUS DUCTS THEODOLITES CANVASES AND FILMS AND BOARDS INTRUDER ALARM FUME EXTRACTION HARDWARE AND FASTENERS LED LIGHT PANEL GEYSER FUME EXHAUST SYSTEM AIR FLOW RELAY DISTEMPER SAFETY AND SECURITY EQUIPMENT PVC FLOORING DISCRETE COMPONENTS INSTRUMENTATION ELECTRICAL WIRE XLPE CABLE PIPING CIRCUIT PROTECTION DEVICE SEALS TELECOM EQUIPMENT FALSE CELING MCCB MEDICAL GAS SYSTEM ASH BRICK CENTRIFUGE BUCKETS ELECTRICAL SUBSTATION FIRE EXTINGUISHERS MUSICAL INSTRUMENT PARTS AND ACCESSORIES AIR DUCT CLADDING WATER PIPE LINE COPPER SHEET EARTH LEAKAGE RELAY RUBBER AND ELASTOMERS SOLAR CHARGER BED WATER SUPPLY PANEL VARIABLE FREQUENCY DRIVE ACTUATOR SOCKET POWER PRESSURE INDICATORS SOLAR CHARGING CB BOX ACP PAINT SUPPLY PRESSURE TRANSMITTERS WINDOW DISTRIBUTION AND CONDITIONING NEGATIVE PRESSURE AIR EXHAUSTER HORTON SPHERE SOLAR BLINKER HIGH TENSION PANEL LED LUMINARIES ATM COPPER PIPE COILED CABLE EMG MACHINE SWITCH GEAR RCC BLOCK CEMENT CONTROL PANEL DOORS FITMENT LFH CABLE BRICK WORK PVC CABLE GLUCOMETER AIR BLOWER LABORATORY PRESSES PNEUMATIC VALVES LED LIGHT MOUNTING HARDWARE PRESSURE GAUGE SMOKE DETECTORS CIVIL WORK VALVES RCC WORK POWER WIRE TECHNICAL SERVICES ANIMAL LABORATORY EQUIPMENT BELL CONTROLLER OPERATION THEATRE EQUIPMENT MASONARY WORK EXTENSOMETERS BOX VALVE WATER LEVEL RECORDER AXLE COUNTER SANITARY FITTING WATER SUPPLY MATERIAL ENAMELING PAINTS AND ACCESSORIES WIRE NON FERROUS PIPE PINCH VALVES FUME HOODS WELLHEAD EQUIPMENT MODULAR OPERATION THEATER DISTRIBUTION PANEL STEEL GATE ENT SET SOLENOID VALVES EXHAUST SYSTEM LFH WIRE SLIDER VALVES PAINTS AND PRIMERS TUBES AND PIPES HEATING EQUIPMENT SPARES BARE CABLE CABINET GAS BURNERS RADIAL FIN FILTERS DUCTING TRANSITION METALS CABLE BUILDING AUTOMATION PLC PANEL PROPULSION SYSTEM DUCT WORK ELECTRICAL CABLE BATTERY VALVE PARTS AND ACCESSORIES RECIPROCATING PUMPS ESCRAP GYPSUM BOARD GASKETS BRICK INSULATED CABLE MEDICAL GAS LOW TENSION PANEL OPERATION THEATRE LIGHT KITCHEN EQUIPMENT PEB AIR SHOWER CABLE SUPPLY PAINTS ALUMINUM FAN METAL PRODUCTS BAR BURGLAR ALARM AIR HANDLING UNIT CONSTRUCTION MINERAL VENTILATION DAMPERS TMT VENETIAN BLIND LABORATORY ENCLOSURES AND ACCESSORIES MONITORING SYSTEM PAINTING MATERIAL