Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931,Copper alloy Taps/Stop Valves (V2) Conform
Indian Army
HARIDWAR, UTTARAKHAND
Progress
Quantity
3100
Category
Soap Dish - Case
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) invites bids for an assortment of hardware and sanitary fittings, including Stainless Steel Shelf Rack (Q3), Copper Alloy Taps/Stop Valves conforming to IS 8931 (Q3), Wire Mesh Fabric, Bathroom Shower units, Copper Alloy Gate Valve for Waterworks (IS 778 Q3), Water Fittings - Copper Alloy Float Valves (IS 1703 Q4), Sinks (Q3), Tower Bolts, Towel Rails/Rings, Floor Drain Traps, Soap Dishes, and related items. The procurement location is PORBANDAR, GUJARAT 360545, with an EMD of ₹230,000. Expected scope covers ISI/BIS-marked products, standard-compliant bathroom and plumbing hardware with specified material and dimension tolerances. The bid emphasizes adherence to governing specifications and mandatory test reports on demand, with a focus on quality, packaging, and fit-for-purpose installation in military facilities. A key differentiator is the breadth of ISI-marked items and IS/IS- based tolerances across multiple product families, ensuring uniform government-wide compliance. Unique clauses include option to adjust quantity up to 25% and OEM turnover verification.
Stainless Steel Shelf Rack (Q3) with specified shelf thickness and material
Copper alloy taps/stop valves conforming to IS 8931 (Q3)
Wire mesh fabric per IS 1568 (Q3) and protective coverings
Bathroom water shower specifications including flow, material, and bore size per IS standards
Copper alloy float valves per IS 1703 (Q4) and related water fittings
Sinks conforming to IS 2963/IS 3311 with BIS marking
Tower bolts, towel rails, floor drains, and soap dishes meeting specified IS standards
EMD ₹230,000; goods-only scope; bid submission requires GST, PAN, EFT mandate
Delivery to PORBANDAR, Gujarat; option to increase/decrease quantity up to 25%
IS/ BIS conformity required; on-demand test reports; warranty terms in months/years
Payment terms aligned with supply of goods; no upfront dates specified; EMD must be submitted
Delivery period subject to option clause; schedule based on last date of original order; extended delivery time calculation detailed
LD details not explicit; extension aligns with option clause and minimum 30 days baseline
Three-year average turnover requirement (bidder and OEM)
Not under liquidation or bankruptcy; no court receivership
GSTIN and PAN validity; EFT mandate and cancelled cheque submitted
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
HARIDWAR, UTTARAKHAND
Indian Army
MUMBAI, MAHARASHTRA
Indian Army
FIROZPUR, PUNJAB
Indian Army
KAPURTHALA, PUNJAB
Indian Army
MEERUT, UTTAR PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Configuration | With 4-Shelf (including top shelf) |
| GENERIC | Shape of support structure | Round hollow type |
| GENERIC | Ground clearance (mm) | 25 mm |
| GENERIC | Mode of supply | Knocked Down To Be Assembled At Consignee Site By Consignee Himself |
| MATERIAL & MATERIAL THICKNESS | Shelf material | Stainless Steel Grade 304 galvanized |
| MATERIAL & MATERIAL THICKNESS | Shelf material thickness | 0.6 mm |
| MATERIAL & MATERIAL THICKNESS | Support structure material | Stainless Steel Grade 304 galvanized |
| MATERIAL & MATERIAL THICKNESS | Support structure material thickness | 0.6 mm |
| DIMENSION | Width of shelf rack ± 10 mm | 915 mm |
| DIMENSION | Depth of shelf rack ± 10 mm | 405 mm |
| DIMENSION | Height of shelf rack ± 10 mm | 1220 mm |
| DIMENSION | Height of support structure ± 10 mm | 1245 mm |
| DIMENSION | Size of support structure | 30 mm x 30 mm |
| WARRANTY | Warranty period | 1 - Year |
| CERTIFICATION | Test report to be furnished to buyer on demand | Yes |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Cancelled cheque
EFT Mandate certified by Bank
Audited financial statements or CA certificate showing turnover
OEM authorization (if applicable)
Test Reports from Central Govt/NABL/ILAC accredited lab on demand
Technical bid documents and BIS/ISI conformity certificates
Bidder undertaking of non-liquidation/non-bankruptcy
Key insights about GUJARAT tender market
To bid, ensure GSTIN, PAN, and EFT mandate are ready, submit EMD ₹230,000, and provide BIS/ISI conformity certificates. Include OEM authorization if applicable and test reports on demand. Ensure turnover criteria are met and goods-only scope is clarified in the bid.
Required documents include GST certificate, PAN, cancelled cheque, EFT mandate, turnover evidence (audited or CA certificate), BIS/ISI conformity certificates, OEM authorizations, and test reports for demand. Also include bid-specific undertakings about non-liquidation and financial standing.
Taps/valves must conform to IS 8931 (Q3) and IS 778; sinks must meet IS 2963/IS 3311 with BIS marking; float valves to IS 1703 (Q4). Test reports from NABL/ILAC labs can be demanded to prove conformity.
The EMD is ₹230,000. It acts as a bid security to ensure bidder seriousness; it is typically adjusted against performance or forfeited for non-performance per the tender terms.
The purchaser can adjust quantity by up to 25% during contract placement and extended currency; delivery period scales using a defined formula with a minimum 30 days and start from the last order date.
Organizing entity is the Indian Army under the Department of Military Affairs; delivery location is Porbandar, Gujarat 360545, focusing on ISI-marked bathroom and plumbing fittings.
Sign up now to access all documents
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS