TenderDekho Logo
Closed GEM

Government Tender Published for voltage stabilizer 5 KVA,Copper piping,Copper piping,Copper piping,Powder-coated MS outdoor unit,15 in RAIPUR, CHHATTISGARH

Bid Publish Date

29-Jul-2026, 6:11 pm

Bid End Date

21-Aug-2026, 8:00 pm

EMD

₹10,000

Generate Docs

Progress

Issue29-Jul-2026, 6:11 pm
Technical21-08-2026 15:05:10
Financial
AwardCompleted

N/a has released a public tender for voltage stabilizer 5 KVA, Copper piping, Powder-coated MS outdoor unit, 15 mm PVC flexible drain pipe, 2. 0 Ton Split Inverter AC 5 Star, PVC Insulated Unsheathed Cable with Flexible Conductor ISI Marked To IS 694 (Q2) in RAIPUR, CHHATTISGARH. Quantity: 783. Submission Deadline: 21-08-2026 20: 00: 00. Download documents and apply online.

Authority & Contact

Organization

N/a

Office Name

E-in-c, Pwd, Nirman Bhawan Raipur

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
GOPAL SALES   Under PMA
-21-08-2026 15:05:10
2
RANISATI UDYOG   Under PMA
-21-08-2026 17:19:48
3
SWARA ENTERPRISES   Under PMA
-21-08-2026 15:56:36

Financial Results

Rank Seller Price Item
L1
GOPAL SALES   Under PMA
Item Categories : voltage stabilizer 5 KVA,Copper piping,Copper piping,Copper piping,Powder-coated MS outdoor unit,15
L2
SWARA ENTERPRISES   Under PMA
Item Categories : voltage stabilizer 5 KVA,Copper piping,Copper piping,Copper piping,Powder-coated MS outdoor unit,15
L3
RANISATI UDYOG( MSE Social Category:General )    Under PMA
Item Categories : voltage stabilizer 5 KVA,Copper piping,Copper piping,Copper piping,Powder-coated MS outdoor unit,15

Tender Data

Bid Details

Quantity

783

Category

voltage stabilizer 5 KVA

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

voltage stabilizer 5 KVA , Copper piping , Powder-coated MS outdoor unit , 15 mm PVC flexible drain pipe , 2.0 Ton Split Inverter AC 5 Star , PVC Insulated Unsheathed Cable with Flexible Conductor ISI Marked To IS 694 (Q2)

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Raipur

Delivery Pincodes

492002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Narayan Singh Paikra492002,O/o Engineer in Chief, Public Works Department North Block, Sector-19, Nirman Bhawan, Naya RaipurRaipurChhattisgarh4920021615-

Authority Records

PUBLIC WORKS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9622700.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

voltage stabilizer 5 KVA

voltage stabilizer 5 KVA

16 pieces Delivery: 15 days
#2

Copper piping

Copper piping

200 pieces Delivery: 15 days
#3

Copper piping

Copper piping

125 metre Delivery: 15 days
#4

Copper piping

Copper piping

100 metre Delivery: 15 days
#5

Powder-coated MS outdoor unit

Powder-coated MS outdoor unit

16 pieces Delivery: 15 days
#6

15 mm PVC flexible drain pipe

15 mm PVC flexible drain pipe

300 metre Delivery: 15 days
#7

2.0 Ton Split Inverter AC 5 Star

2.0 Ton Split Inverter AC 5 Star

16 pieces Delivery: 15 days

Categories 22

Corrigendum Updates

1 Update
#1

Update

14-Aug-2026

Extended Deadline

17-Aug-2026, 1:30 pm

Opening Date

17-Aug-2026, 2:00 pm

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
CONSTRUCTION Cable category FR-LSH
CONSTRUCTION Number of Core 1
CONSTRUCTION Nominal Area of Conductor (in Sq mm) 1.5
CONSTRUCTION Material of conductor Tinned copper
CONSTRUCTION Type of Insulation Type C (HR)
MARKING Marking on the Cable Printed