TenderDekho Logo
Active GEM

Hindustan Petroleum Corporation Ltd STS TR Supply Visakhapatnam 6.6kV 650KVA Capacity - Commissioning Supervision 2026

Bid Publish Date

27-Jun-2026, 5:05 pm

Bid End Date

22-Jul-2026, 5:00 pm

Generate Docs

Progress

Issue27-Jun-2026, 5:05 pm
Corrigendum15-Jul-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

4

Category

SPLY of 3ph, 6.6kV, 650KVA, STS TR

Bid Type

Two Packet Bid

Categories 5

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids for the supply of 3ph, 6.6kV, 650KVA STS transformer with supervision charges for commissioning at Visakhapatnam, Andhra Pradesh. The tender scope mentions a flexible quantity option of up to 25% increase and corresponding delivery extensions at contracted rates. The BOQ shows no listed items, indicating a potential equipment and services package with commissioning supervision rather than a pure goods-only contract. The absence of stated estimated value and start/end dates requires bidders to seek clarification on scope boundaries, delivery milestones, and after-sales support requirements. A key differentiator is the option clause enabling quantity variation and extended delivery timelines, which can affect pricing and delivery planning.

Technical Specifications & Requirements

  • The procurement category centers on a 6.6kV, 650KVA substation transformer configuration (STS) with on-site supervision for commissioning by the supplier.
  • No explicit technical specifications or IS/IEC standards are published in the tender data set; bidders must infer performance criteria from typical 6.6kV/650KVA STS installations and provide detailed technical proposals with installation methodology, testing, and commissioning procedures.
  • The clause regarding supervision charges implies embedded services for commissioning, site acceptance testing, and handover documentation. Bidders should prepare a comprehensive service plan, safety plan, and commissioning schedule compatible with site conditions in Visakhapatnam.
  • The absence of BOQ items suggests a combined goods-and-services contract; bidders should present itemized pricing for transformer supply, accessories, installation, and commissioning support.
  • No EMD amount is disclosed; bidders must verify financial guarantees and payment milestones during clarification.

Terms, Conditions & Eligibility

  • Quantity may be increased up to 25% of bid quantity at contract award and during currency at contracted rates.
  • Delivery period is measured from the last date of the original delivery order; extended-time calculations apply with a minimum of 30 days.
  • If the original delivery period is under 30 days, the extension equals the original period; extended duration can be capped to the original period.
  • Bidders must comply with the option clause and ensure scheduling alignment with HPCL Visakhapatnam requirements.
  • EMD details are not disclosed in the tender; bidders should seek confirmation of bid security and acceptable forms.
  • The ATC document exists but specific terms are not published here; bidders should review for additional compliance requirements.

Key Specifications

  • Product/service names: 3ph, 6.6kV, 650KVA STS transformer with commissioning supervision

  • Quantities: not disclosed; quantity option up to 25%

  • Estimated value: not disclosed

  • Experience requirements: not explicitly specified; provide similar project experience

  • Quality/standards: not specified; bidders to propose standard-compliant installation and testing

  • Delivery: post original delivery order date; minimum extension 30 days

  • Warranty/AMC: not specified

  • OEM/Brand requirements: not specified; obtain OEM authorization if needed

Terms & Conditions

  • Quantity adjustment up to 25% at contract; delivery extension rules apply

  • Delivery timeline begins after last date of original delivery order

  • EMD requirements and ATC terms require clarification from HPCL

Important Clauses

Option Clause

Purchaser may increase/decrease quantity up to 25% at contracted rates; delivery period extended proportionally with a minimum of 30 days.

Delivery Schedule

Delivery period starts from the last date of the original delivery order; extended time calculation: (Increased quantity ÷ Original quantity) × Original delivery period.

Payment Terms

Not specified in data; bidders should obtain terms from the final ATC document and contract.

Bidder Eligibility

  • Experience in supply and commissioning of 6.6kV/650KVA STS transformers

  • Financial capacity to support equipment procurement and commissioning

  • Compliance with site safety and HV installation guidelines and OEM authorizations

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SPLY of 3ph, 6.6kV, 650KVA, STS TR , Supervision charges for commissioning

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9528825.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar transformer supply and commissioning

4

Financial statements or turnover evidence

5

EMD/Security deposit documentation (to be clarified)

6

Technical bid documents outlining transformer specifications and commissioning plan

7

OEM authorizations or vendor approvals for STS transformers

8

Any site-specific safety and compliance certificates

Corrigendum Updates

2 Updates
#1

Update

15-Jul-2026

Extended Deadline

22-Jul-2026, 5:00 pm

Opening Date

22-Jul-2026, 5:30 pm

#2

Update

08-Jul-2026

Extended Deadline

15-Jul-2026, 5:00 pm

Opening Date

15-Jul-2026, 5:30 pm

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for the 6.6kV STS transformer tender in Visakhapatnam 2026?

Bidders should confirm scope with HPCL, submit GST, PAN, experience certificates, financials, OEM authorizations, and technical bid. Provide a detailed commissioning plan, safety procedures, and pricing for transformer supply, installation, and commissioning supervision. Ensure the ATC terms are reviewed for any additional compliance.

What are the eligibility criteria for HPCL Visakhapatnam transformer procurement 2026?

Eligibility includes demonstrated experience in similar transformer supply/commissioning, valid GST and PAN, financial stability evidence, and OEM authorization if required. Bidders must adhere to HPCL option clause for quantity adjustments and provide a robust commissioning plan.

What documents are required for submission for this tender in Visakhapatnam?

Submit GST certificate, PAN, experience certificates for similar projects, financial statements, EMD documentation, technical bid detailing STS transformer specs, OEM authorizations, and commissioning plan. Review ATC for any additional site-specific forms.

What are the technical specifications for the 650KVA STS transformer tender 2026?

Technical data indicate a 3ph, 6.6kV, 650KVA STS transformer with commissioning supervision. Specific IS/IEC standards are not listed; bidders must propose compliant installation, testing procedures, and acceptance criteria aligned with HV standards and site conditions.

What is the EMD amount for this HPCL procurement in Visakhapatnam?

The tender data does not disclose the EMD amount. Bidders should obtain the exact EMD value and acceptable forms from the final tender ATC or contract documents before submission.

When is the delivery timeline for the HPCL transformer project in Visakhapatnam?

Delivery period starts from the last date of the original delivery order, with a minimum extension of 30 days if the option clause is exercised. The exact original delivery period is not specified and should be confirmed in clarification.

How will quantity changes affect the HPCL 6.6kV transformer contract?

The purchaser may increase/decrease quantity up to 25% at contracted rates. Extended delivery time is calculated proportionally; ensure pricing includes potential variations and schedule buffers for on-site commissioning.

What are the payment terms for HPCL Visakhapatnam transformer supply?

Payment terms are not specified in the provided data. Bidders should reference the ATC document for milestone-based payments, items covered under supervision charges, and any advance or milestone payments tied to commissioning.