TenderDekho Logo
Active GEM

South Western Railway Hydraulic Puller Tender 5T & 10T Stainless Steel in Rajasthan 2026 Voltz Similar

Bid Publish Date

21-Sep-2026, 12:40 pm

Bid End Date

03-Oct-2026, 10:00 am

Generate Docs

Progress

Issue21-Sep-2026, 12:40 pm
Corrigendum21-Sep-2026
AwardPending

Key Highlights

  • • Voltz or Similar make requirement for 5T and 10T stainless steel hydraulic pullers
  • • Jaw configuration: three jaws; exact models referenced as VZ-VHP-5T / VZ-VHP-10T
  • • 12-month warranty with 5-day service/rectification SLA
  • • Penalty regime: 0.5% per week delay, up to 10% of contract value; potential PBG forfeiture

Tender Overview

Organization: South Western Railway (Indian Railways) seeks supply of Stainless Steel Hydraulic Pullers in two capacities: 5 tonne and 10 tonne with three jaws similar to Voltz VZ-VHP-5T / VZ-VHP-10T. Quantity: 1 each. Warranty: 12 months from supply. The scope specifies goods supply only. No BOQ items or location details provided. Key differentiator includes Voltz or Similar make requirement and stainless steel construction. This tender targets suppliers capable of immediate post-award service readiness and compliant with the rail procurement process, including after-sales support commitments and warranty adherence. Unique clause emphasizes service center presence in bidder’s state or establishment within 30 days of award, with dedicated service support lines.

Technical Specifications & Requirements

  • Product name and category: Stainless Steel Hydraulic Puller with 5T and 10T capacities; 3 Jaw configuration.
  • Make target: Voltz or Similar (VZ-VHP-5T / VZ-VHP-10T references mentioned in ATC).
  • Quantity: 1 No. for 5T, 1 No. for 10T.
  • Warranty period: 12 months from date of supply.
  • Construction material: Stainless steel construction as defined in item description.
  • Delivery/installation context: Goods supply; on-site or carry-in warranty terms depend on service arrangement.
  • Service/support: Requires dedicated/toll-free service contact; post-delivery servicing commitments within defined timelines.
  • Standards/compatibility: No explicit standards listed; ensure compatibility with rail assembly standards and safety guidelines.

Terms, Conditions & Eligibility

  • Turnover criteria: Minimum average annual turnover in last 3 years as per bid document; must provide audited balance sheets or CA/CMA certificate.
  • Service center: Functional service center in the bidder’s state; if absent, must establish within 30 days of award; evidence required before payment release.
  • Warranty servicing: Rectification within 5 days; penalties 0.5% of unit price per week of delay, max cumulative 10% of contract value; after which alternative sourcing may be used with PBG at risk and cost to bidder.
  • ATC notes: Dedicated toll-free service line required; invoices as per GeM portal.
  • Payment terms: Not explicitly stated; payments linked to service/penalty framework and performance security.
  • Documentation/EMD: EMD requirements not specified here; must align with buyer terms and general tender norms.

Key Specifications

  • Stainless steel hydraulic puller with 5T capacity

  • Stainless steel hydraulic puller with 10T capacity

  • Jaw configuration: three jaws, compatible with Voltz VZ-VHP-5T / VZ-VHP-10T

  • Warranty: 12 months from supply date

  • Construction material: Stainless steel

  • Brand requirement: Voltz or Similar

Terms & Conditions

  • EMD: Not specified in provided data; verify with tender docs

  • Delivery: 30 days service center establishment post-award; payment after evidence of service center

  • Penalty: 0.5% per week delay, capped at 10% of contract value; possible PBG forfeiture

Important Clauses

Payment Terms

Payment linked to timely service/rectification; penalties may be recovered from PBG; no fixed upfront terms specified in data

Delivery Schedule

Service center establishment within 30 days of award; on-time supply of goods as per rail procurement norms

Penalties/Liquidated Damages

0.5% unit price per week delay; maximum 10% of total contract value; post-penalty, alternative sourcing at bidder cost

Bidder Eligibility

  • Minimum average annual turnover as per bid document for last 3 years

  • Functional Service Centre in bidder's state or capable of establishment within 30 days

  • Ability to supply stainless steel hydraulic pullers with 5T and 10T capacity (Voltz or Similar)

Advertisement

Tender Data

Bid Details

Quantity

2

Category

Hydraulic Puller

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

12 months

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Hydraulic Puller (Q3)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Dharwad

Delivery Pincodes

580020

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vinod S Kumbar580020,O/o Senior Materials Manager, Mechanical Stores Depot South Western Railway, Gadag Road, Hubli 580 020DharwadKarnataka580020145-

Authority Records

MINISTRY OF RAILWAYSSOUTH WESTERN RAILWAY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-9917319.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Indian Railways

Office Name

South Western Railway

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

21-Sep-2026

Extended Deadline

03-Oct-2026, 4:30 am

Opening Date

04-Oct-2026, 4:30 am

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements or CA/CMA turnover certificate for last 3 years

4

Experience certificates for similar hydraulic puller supply (if available)

5

OEM authorization or evidence of Voltz or Similar make capability

6

Evidence of Functional Service Centre or plan to establish within 30 days

7

Technical compliance and warranty commitment documents

8

Any prior service support contracts or maintenance agreements

Frequently Asked Questions

How to bid for hydraulic pullers tender in South Western Railway?

Bidders must demonstrate turnover consistency, provide GST and PAN, supply Voltz or similar 5T/10T stainless steel hydraulic pullers with three jaws, and show a plan for a functional service center in their state within 30 days of award; include warranty commitments and service line details.

What documents are required for the hydraulic puller bid in Rajasthan?

Submit GST certificate, PAN, 3-year turnover statements or CA/CMA certificate, OEM authorization, past project experiences for similar pullers, and evidence of a dedicated service center; provide warranty statements and technical compliance notes.

What are the technical specifications for the pullers in this tender?

Two models: 5T and 10T stainless steel hydraulic pullers with three jaws; make: Voltz or Similar; 12-month warranty; construction material stainless steel; no explicit IS standard listed in the data; ensure compatibility with rail assembly.

What is the warranty and after-sales requirement for the pullers?

Warranty period is 12 months from supply; service/rectification must be completed within 5 days; penalties 0.5% of unit price per week; maximum 10% of contract value; PBG may be used to recover penalties.

How will penalties affect the PBG and payment terms?

Penalties accumulated up to 10% of contract value can trigger PBG forfeiture; afterward, the buyer may arrange service from alternate sources at the cost of the seller; payment terms align with service performance and penalty adjustments.

Is there a requirement to establish a service center before submission?

No; a functional service center must be established within 30 days of award; payment release is contingent on documentary evidence of the center's operation and ongoing service capability.