LOGIC CARD,DRUM ASSY,CLEANING BLADE,FUSER ASSY,POWER SUPPLYN CARD,KEY BOARD MOUSE HP,PRINTER CARD,P
Indian Army
GURDASPUR, PUNJAB
Progress
Quantity
10
Category
DRUM ROLLER
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks procurement of a mixed category bundle including DRUM ROLLER, PCR ROLLER, PCR BLADE, ON OFF SWITCH, SLEEVE WIRE, KEY BOARD AND MOUSE. The data shows an overall contract framework with an option clause allowing up to 25% quantity variation at the contracted rates and a delivery timeline model tied to the last delivery order date. The BOQ lists 6 items but details are not disclosed, and the location is not specified, indicating a national-level security equipment procurement managed by the Indian Army. The unique aspect is the explicit option clause governing both initial and extended delivery, impacting scheduling and workforce planning.
Option Clause allows ±25% quantity variation at contracted rates
Delivery period tied to last original order date with minimum 30 days
No explicit EMD amount or payment terms provided in data
Delivery starts from the last date of the original delivery order; extensions follow option clause with minimum 30 days, potentially increasing up to original delivery period.
Purchaser may increase/decrease quantity up to 25% during contract execution at contracted rates.
Due to lack of detailed specs, bidders must align with OEM compatibility and army-established standards to ensure interoperability.
Experience in supplying hardware components or spares for military/equipment procurement
Ability to meet OEM authorization requirements for DRUM ROLLER, PCR components, and peripheral devices
Financial capacity to handle contract risk and potential quantity fluctuations
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
GURDASPUR, PUNJAB
Indian Army
Indian Army
BATHINDA, PUNJAB
Indian Army
PUNE, MAHARASHTRA
Indian Army
ALWAR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | DRUM ROLLER | IT | 1 | pease | shiv_kumar140 | 15 |
| 2 | PCR ROLLER | IT | 1 | pease | shiv_kumar140 | 15 |
| 3 | PCR BLADE | IT | 1 | pease | shiv_kumar140 | 15 |
| 4 | ON OFF SWITCH | IT | 1 | pease | shiv_kumar140 | 15 |
| 5 | SLEEVE WIRE | IT | 1 | pease | shiv_kumar140 | 15 |
| 6 | KEY BOARD AND MOUSE | IT | 5 | pease | shiv_kumar140 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar equipment procurement
Financial statements showing turnover and stability
EMD/Security deposit documents as applicable
Technical bid/technical compliance certificates
OEM authorizations or confirmations for equipment brands
Key insights about RAJASTHAN tender market
Bidders should confirm OEM availability, submit standard bid documents (GST, PAN, experience certificates), and align with the Army’s option clause allowing ±25% quantity variation. Include technical compliance certificates and OEM authorizations where applicable, and prepare for delivery terms based on the last delivery order date with a minimum 30-day extension.
Submit GST certificate, PAN card, experience certificates for similar equipment, financial statements, EMD documents, technical bid, and OEM authorizations. Include any manufacturer literature showing compatibility with DRUM ROLLER, PCR components, and peripherals like keyboards and mice.
Delivery begins from the last date of the original delivery order. If quantity increases, extensions follow the calculated time formula and must minimum equal 30 days. The purchaser may extend duration to the original delivery period, ensuring orderly rollout of spares and components.
The tender data shows a 6-item BOQ with unspecified quantities. Bidders should confirm quantity ranges during bid submission and prepare for possible ±25% adjustments under the option clause, with pricing at contracted rates.
No standards are listed in the data. Bidders should seek OEM certifications and ensure compatibility with Indian Army equipment, plus provide standard technical compliance certificates and, if applicable, ISO or BIS conformity as per live tender documents.
The organization may increase or decrease contract quantity by up to 25% at existing contracted rates during order placement and during the contract period. Delivery timelines adjust proportionally using the specified formula, with a minimum of 30 days added to delivery time.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS