Supply of stores for Toilet Block 6C,Construction Materials for Toilet Block 6C as per store list,P
Indian Army
IMPHAL WEST, MANIPUR
Bid Publish Date
24-Oct-2025, 7:57 pm
Bid End Date
04-Nov-2025, 8:00 pm
Location
Progress
RAQuantity
5
The procurement is led by the Indian Army under the Department Of Military Affairs for construction and allied works in Jammu, Jammu & Kashmir (180001). The scope includes construction of 01 bathroom and 01 toilet, plus associated plumbing, tiling, and electrician work. The package comprises five BOQ items and requires pre-bid drawing submission. A flexible quantity option permits up to 25% increase during contract execution at contracted rates. This contract targets timely delivery with contractor readiness for site works and compliance checks. Unique emphasis on drawing sample submission during pre-bid stage differentiates eligible bidders.
Scope includes: 01 bathroom construction, 01 toilet construction, plumbing, tiling, and electrician work
BoQ consists of 5 items with no explicit quantities disclosed
Pre-bid drawing sample submission required for technical acceptance
Option clause allows up to 25% quantity variation at contracted rates
Delivery period adjustments use formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Site location: Jammu, Jammu & Kashmir; project execution within specified locale
Option to modify quantity by up to 25% during and after contract award with maintained rates
Pre-bid submission of bathroom construction drawings is mandatory for technical clearance
Mandatory document uploads; missing certificates can lead to bid rejection
Payment terms not explicitly disclosed; standard government terms likely apply per contract.
Delivery period starts after original/delivery order; extended time calculated by the option clause formula with a minimum of 30 days.
Not specified in available data; standard LD clauses may apply per ATC and bid documents.
Must submit all certificates and documents as per bid terms and ATC
Must provide bathroom construction drawing samples at pre-bid meeting
Must comply with 25% quantity variation clause and advance delivery terms
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
IMPHAL WEST, MANIPUR
Indian Army
RAJAURI, JAMMU & KASHMIR
Indian Army
SURENDRA NAGAR, GUJARAT
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Construction of 01 x Bathroom | Construction of 01 x Bathroom | 1 | nos | [email protected] | 120 |
| 2 | Construction of 01 x Toilet | Construction of 01 x Toilet | 1 | nos | [email protected] | 120 |
| 3 | Plumbing work for Bathroom and Toilet | Plumbing work for Bathroom and Toilet | 1 | nos | [email protected] | 120 |
| 4 | Tilling work for Bathrrom and Toilet | Tilling work for Bathrrom and Toilet | 1 | nos | [email protected] | 120 |
| 5 | Electrician Wrok | Electrician Wrok | 1 | nos | [email protected] | 120 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar construction/plumbing projects
Financial statements (last 2-3 years as applicable)
EMD documentation as per bid terms
Technical bid documents showing method/approach
OEM authorization certificates (if applicable)
Start
11-Nov-2025, 7:00 pm
End
12-Nov-2025, 7:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | 1 VISION ENGINEERS & CONSULTEK Under PMA | - | 04-11-2025 03:23:48 | Disqualified |
| 2 | BHAWANI SALES CORPORATION Under PMA | - | 31-10-2025 09:15:10 | Qualified |
| 3 | M/S RR ENTERPRISES Under PMA | - | 31-10-2025 09:03:23 | Qualified |
| 4 | R.J. ENTERPRISES Under PMA | - | 31-10-2025 08:43:29 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | R.J. ENTERPRISES(MSE,MII)( MSE Social Category:General ) Under PMA | ₹3,98,200 | Item Categories : Construction of 01 x Bathroom,Construction of 01 x Toilet,Plumbing work for Bathroom and Toilet,Til |
| L2 | M/S RR ENTERPRISES (MSE,MII)( MSE Social Category:General ) Under PMA | ₹4,62,000 | Item Categories : Construction of 01 x Bathroom,Construction of 01 x Toilet,Plumbing work for Bathroom and Toilet,Til |
| L3 | BHAWANI SALES CORPORATION (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹4,89,600 | Item Categories : Construction of 01 x Bathroom,Construction of 01 x Toilet,Plumbing work for Bathroom and Toilet,Til |
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit all required documents (GST, PAN, experience certificates, financials, EMD) and upload technical bid with method/approach. Pre-bid drawing samples for bathroom construction are mandatory; ensure compliance with ATC terms and 25% quantity option clauses to secure eligibility.
Required documents include GST registration, PAN card, experience certificates of similar projects, financial statements, EMD documents, technical bid, and OEM authorizations if applicable. All certificates must be uploaded as per bid document and ATC to avoid rejection.
The purchaser reserves the right to increase or decrease quantity up to 25% of bid/contract quantity either at placement or during the currency of the contract, with rates fixed at contracted values.
The scope includes construction of 01 bathroom and 01 toilet, along with plumbing, tiling, and electrician work. Five BOQ items exist, but unit quantities are not disclosed in available data.
Bidders must provide a drawing sample showing construction of the bathroom during the pre-bid meeting; failure to provide leads to rejection at the technical stage.
Delivery periods follow the option clause; additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Extended durations may be approved within the original delivery period.
Documentation must align with bid terms and ATC; certificates may include GST/PAN, experience proofs, and OEM authorizations if applicable. Specific IS or BIS standards are not detailed in available data; ensure all uploaded certificates comply with ATC.
Exact payment terms are not specified in the data provided. Bidders should expect government-standard payment terms in the final contract, typically involving milestones linked to delivery/acceptance and corresponding documentation.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS