Bid Publish Date
01-Dec-2025, 7:37 pm
Bid End Date
30-Dec-2025, 11:00 am
Location
Progress
Quantity
438
Category
Deploying teams for scheme and wiring checking for 765kV Kurnool substation AIS as per POWERGRID scope of work
Bid Type
Two Packet Bid
The opportunity is with Power Grid Corporation Of India Limited for deploying teams to perform scheme and wiring checks and for preparing drawings for 765kV Nellore Pooling Station AIS, 765kV Srikakulam GIS, and 765kV Kurnool AIS, all under POWERGRID scope of work, expected in Nellore, Andhra Pradesh. The package combines field deployment for three substations with drawing/engineering deliverables. The scope emphasizes on-site scheme verification and creation of installation drawings, aligning with POWERGRID project standards. A notable provision allows a quantity variation of up to 25 percent during contract execution, at contracted rates, with delivery timelines anchored to the original/extended orders. This ATC-driven procurement requires bidders to submit multiple technical and commercial documents, including safety, MII, and QR compliance, as part of a comprehensive bid package.
Deployment of teams for 765kV Nellore Pooling Station AIS, 765kV Srikakulam GIS, 765kV Kurnool AIS
Preparation of drawings for each substation as per POWERGRID scope
On-site scheme and wiring checks with engineering drawings deliverables
Total BOQ contains 6 items (no explicit quantities provided in data)
25% quantity variance allowed with contract-based adjustment
EMD submission in hard and soft copies required
Comprehensive ITB, QR, Scope of Work and ATC compliance mandatory
Not specified in available data; refer to ITB/ATC for schedule.
Delivery period linked to original order; option clause extends delivery period proportionally.
Not specified; consult ITB/ATC for LD terms.
Compliance with POWERGRID QR and Scope of Work
Submission of EMD (hard & soft), PAN, GST, and incorporation documents
Acceptance of ATC terms including Safety Pact and MII undertaking
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Deploying teams for scheme and wiring checking for 765kV Nellore Pooling Station AIS as per POWERGRID scope of work , Preparation of drawings for 765kV Nellore Pooling Station as per POWERGRID scope of work , Deploying teams for scheme and wiring checking for 765kV Srikakulam substation GIS as per POWERGRID scope of work , Preparation of drawings for 765kV Srikakulam substation as per POWERGRID scope of work , Deploying teams for scheme and wiring checking for 765kV Kurnool substation AIS as per POWERGRID scope of work , Preparation of drawings for 765kV Kurnool Substation as per POWERGRID scope of work
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Deploying teams for scheme and wiring checking for 765kV Nellore Pooling Station AIS as per POWERGRID scope of work
Deploying teams for scheme and wiring checking for 765kV Nellore Pooling Station AIS as per POWERGRID scope of work
Preparation of drawings for 765kV Nellore Pooling Station as per POWERGRID scope of work
Preparation of drawings for 765kV Nellore Pooling Station as per POWERGRID scope of work
Deploying teams for scheme and wiring checking for 765kV Srikakulam substation GIS as per POWERGRID scope of work
Deploying teams for scheme and wiring checking for 765kV Srikakulam substation GIS as per POWERGRID scope of work
Preparation of drawings for 765kV Srikakulam substation as per POWERGRID scope of work
Preparation of drawings for 765kV Srikakulam substation as per POWERGRID scope of work
Deploying teams for scheme and wiring checking for 765kV Kurnool substation AIS as per POWERGRID scope of work
Deploying teams for scheme and wiring checking for 765kV Kurnool substation AIS as per POWERGRID scope of work
Preparation of drawings for 765kV Kurnool Substation as per POWERGRID scope of work
Preparation of drawings for 765kV Kurnool Substation as per POWERGRID scope of work
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Deploying teams for scheme and wiring checking for 765kV Nellore Pooling Station AIS as per POWERGRID scope of work | Deploying teams for scheme and wiring checking for 765kV Nellore Pooling Station AIS as per POWERGRID scope of work | 142 | team days | consigneenellore2 | 120 | |
| 2 | Preparation of drawings for 765kV Nellore Pooling Station as per POWERGRID scope of work | Preparation of drawings for 765kV Nellore Pooling Station as per POWERGRID scope of work | 10 | nos | consigneenellore2 | 120 | |
| 3 | Deploying teams for scheme and wiring checking for 765kV Srikakulam substation GIS as per POWERGRID scope of work | Deploying teams for scheme and wiring checking for 765kV Srikakulam substation GIS as per POWERGRID scope of work | 100 | team days | 60002791 | 120 | |
| 4 | Preparation of drawings for 765kV Srikakulam substation as per POWERGRID scope of work | Preparation of drawings for 765kV Srikakulam substation as per POWERGRID scope of work | 10 | nos | 60002791 | 120 | |
| 5 | Deploying teams for scheme and wiring checking for 765kV Kurnool substation AIS as per POWERGRID scope of work | Deploying teams for scheme and wiring checking for 765kV Kurnool substation AIS as per POWERGRID scope of work | 166 | team days | consigneekurnool1 | 120 | |
| 6 | Preparation of drawings for 765kV Kurnool Substation as per POWERGRID scope of work | Preparation of drawings for 765kV Kurnool Substation as per POWERGRID scope of work | 10 | nos | consigneekurnool1 | 120 |
Acceptance of Terms (Scope of Work, ATC & SCC)
UDYAM Certificate (if applicable for MSEs)
Documents for Qualifying Requirements (QR) as Annexure-QR
Bidding Forms including MII undertaking and safety pact
EMD (hard copy and soft copy)
Copy of PAN Card
GST registration
Partnership Deed/Affidavit for Proprietorship/Company MOA & AoA
OEM authorizations (where applicable)
All other technical documents as per bid requirements
Extended Deadline
30-Dec-2025, 11:00 am
Opening Date
30-Dec-2025, 11:30 am
Extended Deadline
23-Dec-2025, 11:00 am
Opening Date
23-Dec-2025, 11:30 am
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | SYNERGYELECTRICAL CONTRACTING PRIVATE LIMITED Under PMA | - | 15-12-2025 18:39:49 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SYNERGYELECTRICAL CONTRACTING PRIVATE LIMITED(MSE,MII)( MSE Social Category:OBC ) Under PMA | Item Categories : Deploying teams for scheme and wiring checking for 765kV Nellore Pooling Station AIS as per POWERGR |
Please sign in or create an account to view contract details and download result documents.
Key insights about ANDHRA PRADESH tender market
Bidders must submit ITB, QR, Scope of Work, and bidding forms with EMD in both hard and soft copies. Include UDYAM (if applicable), PAN, GST, incorporation documents, and safety pact. Ensure compliance with POWERGRID ATC and submit OEM authorizations where required.
Mandatory documents include Acceptance of Terms, QR compliance documents, Scope of Work, MII undertaking, Safety Pact, EMD copies, PAN, GST, and company incorporation/MoA. Provide hard and soft copies and ensure all forms are signed on official letterhead.
Delivery terms allow up to 25% quantity variation with phased delivery. The final delivery period is calculated as per the option clause, starting from the last date of the original delivery order, with a minimum 30 days extension rule.
The project covers the Nellore Pooling Station AIS, Srikakulam substation GIS, and Kurnool AIS 765kV facilities, each requiring scheme/wiring checks and drawings under POWERGRID scope.
Deploying teams for scheme and wiring checks for the Srikakulam GIS, plus preparation of corresponding 765kV substation drawings, all in accordance with POWERGRID scope of work and associated ATC documents.
Eligibility requires QR compliance, acceptance of ITB/ATC terms, submission of EMD with PAN and GST, incorporation/partnership documents, and relevant OEM authorizations; MSEs may provide UDYAM certificate if applicable.
Prepare EMD in hard and soft copy per ITB guidelines, attach Safety Pact on Rs. 100 stamp paper, and ensure non-judicial stamping for MII undertakings; include PAN and GST certificates with bid submission.
Scope of Work defines deployment and drawing tasks for three 765kV facilities; QR outlines minimum qualifications and technical capabilities required; bidders must meet both to qualify for bid submission.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS