Progress
Quantity
15
The tender is issued by the Indian Army under the Department Of Military Affairs for the procurement of multiple automotive and engine components, including Cylinder STD KIT, HOSE PIPE RUBBER, SPARK PLUG, COTTER VALVE, GASKET ASSY CYL HEAD, STARTER MOTOR 12 VOLTS, ASSY CLUTCH MASTER CYL, CLUTCH SLEEVE CYL, WINDING STARTR GENERATOR FIELD, ARMATURE MOTOR, and BRUSH CARRIER ASSY. Location: AMBALA, HARYANA - 133001. Estimated value and exact quantities are not disclosed; the scope is limited to supply of goods only. Key differentiator includes a flexible quantity option (up to 25% more during contract execution) and a structured advance sample approval process. This tender emphasizes concrete sample approvals prior to bulk manufacture and adherence to contract specifications. The BOQ lists 11 items with unspecified quantities, signaling a broad, component-based gear procurement for defence purposes.
Keywords: tender in Ambala, SBI procurement-like structure for armed forces, Ambala government tender, cylinder kit supply, automotive component bid 2026.
Option clause allows +/- 25% quantity variation at contract and during currency
Advance sample approval required: 5 samples within 5 days of award, with modification cycle
Supply scope limited to goods; no installation or service obligations stated
Not specified; bid must include all cost components for supply of goods
Delivery period is defined only after award; additional time may be granted based on option clause formula
Not specified; sample approval delays may adjust delivery timeline without LD
Proven experience with automotive component supply for defense or government bodies
Ability to provide advance samples within 5 days of award
Compliance with GST, PAN, and OEM authorization requirements
Tender Category
Goods
Bid To RA
No
Item Category
CYLINDER STD KIT , HOSE PIPE RUBBER , SPARK PLUG , COTTER VALVE , GASKET ASSY CYL HEAD , STARTER MOTOR 12 VOLTS , ASSY CLUTCH MASTER CYL , CLUTCH SLEEVE CYL , WINDING STARTR GENERATOR FIELD , ARMATURE MOTOR , BRUSH CARRIER ASSY
Pre-Bid Date
24-07-2026 09:00:00
Pre-Bid Venue
ALL VENDORS ARE REQUEST TO ATTEND THIS MEETING FOR PARTICIPATIONIN THIS AS ON DT ABOVE MENTION
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ambala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ambala | Ambala | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
CYLINDER STD KIT
CYLINDER STD KIT
HOSE PIPE RUBBER
HOSE PIPE RUBBER
SPARK PLUG
SPARK PLUG
COTTER VALVE
COTTER VALVE
GASKET ASSY CYL HEAD
GASKET ASSY CYL HEAD
STARTER MOTOR 12 VOLTS
STARTER MOTOR 12 VOLTS
ASSY CLUTCH MASTER CYL
ASSY CLUTCH MASTER CYL
CLUTCH SLEEVE CYL
CLUTCH SLEEVE CYL
WINDING STARTR GENERATOR FIELD
WINDING STARTR GENERATOR FIELD
ARMATURE MOTOR
ARMATURE MOTOR
BRUSH CARRIER ASSY
BRUSH CARRIER ASSY
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | CYLINDER STD KIT | CYLINDER STD KIT | 1 | nos | ramtal@47 | 15 | |
| 2 | HOSE PIPE RUBBER | HOSE PIPE RUBBER | 1 | nos | ramtal@47 | 15 | |
| 3 | SPARK PLUG | SPARK PLUG | 1 | nos | ramtal@47 | 15 | |
| 4 | COTTER VALVE | COTTER VALVE | 1 | nos | ramtal@47 | 15 | |
| 5 | GASKET ASSY CYL HEAD | GASKET ASSY CYL HEAD | 1 | nos | ramtal@47 | 15 | |
| 6 | STARTER MOTOR 12 VOLTS | STARTER MOTOR 12 VOLTS | 1 | nos | ramtal@47 | 15 | |
| 7 | ASSY CLUTCH MASTER CYL | ASSY CLUTCH MASTER CYL | 2 | nos | ramtal@47 | 15 | |
| 8 | CLUTCH SLEEVE CYL | CLUTCH SLEEVE CYL | 2 | nos | ramtal@47 | 15 | |
| 9 | WINDING STARTR GENERATOR FIELD | WINDING STARTR GENERATOR FIELD | 1 | nos | ramtal@47 | 15 | |
| 10 | ARMATURE MOTOR | ARMATURE MOTOR | 2 | nos | ramtal@47 | 15 | |
| 11 | BRUSH CARRIER ASSY | BRUSH CARRIER ASSY | 2 | nos | ramtal@47 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates from similar supply contracts
Financial statements / turnover proof
EMD submission document (if applicable; amount not specified)
Technical bid documents demonstrating product compliance
OEM authorizations or certifications for listed components
Contract copies and invoices for past projects (as proof of experience)
Key insights about HARYANA tender market
Bidders must submit documents including GST, PAN, and experience proofs, plus OEM authorizations. The scope is for supply of goods only, with an advance sample requirement of 5 samples within 5 days of award. The option clause allows ±25% quantity variation, and delivery shifts if approvals are delayed.
Required documents include GST registration, PAN, experience certificates or contract copies with invoices, financial statements, technical bid, EMD documents, and OEM authorizations for listed items. Prepare prior contracts demonstrating similar supply experience to strengthen eligibility.
Delivery is for goods only with an option to increase quantity by up to 25% at contract rates. If additional time is needed, it is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Sample approval delays can extend delivery without LD.
The procurement covers Cylinder STD KIT, Hose Pipe Rubber, Spark Plug, Cotter Valve, Gasket Assembly Cyl Head, Starter Motor 12V, Assy Clutch Master Cyl, Clutch Sleeve Cyl, Winding Starter Generator Field, Armature Motor, and Brush Carrier Assembly.
Successful bidder must submit 5 samples within 5 days of contract award. The buyer will approve or list modifications within 5 days. Delays in approval shift the delivery timeline; major deviations may lead to contract termination.
No explicit standards are listed in the notice. Bidders should rely on OEM authorizations and prior defense-supply experience. Ensure technical bid demonstrates capability to supply the listed automotive components in bulk as per contract terms.
Acceptable proof includes contract copies with invoices and self-certification, or equivalent project documentation. The buyer may consider any one valid proof demonstrating experience in supplying similar automotive components to government clients.
Final delivery dates depend on award date and approval of advance samples. If sample approval is delayed by the buyer, the delivery period will be adjusted accordingly with no liquidated damages for buyer-caused delays.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS