TenderDekho Logo
Active GEM

Indian Army GPU SFC System Components Tender 2026 Rajasthan/India - ISI/ISO Standards, OEM Authorization, 25% Quantity Option

Bid Publish Date

13-Oct-2026, 12:51 pm

Bid End Date

26-Oct-2026, 1:00 pm

Progress

Issue13-Oct-2026, 12:51 pm
Corrigendum14-Oct-2026
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for five GPU SFC system components: GPU SFC Main Control Card, GPU SMPS Battery Charger, GPU PCB with Conductor, GPU SFC Mimic Display, and GPU DC Volt & Amp Meter PCB. The BoQ lists 5 items with unspecified quantities, and the estimated value is not disclosed. The procurement targets integration with existing Ground Power Unit (GPU) SFC systems within a military context. A key distinguishing element is the explicit requirement for 25% quantity flexibility during contract execution, with delivery timelines anchored to the original delivery order. This opportunity demands strict adherence to compatibility and traceability with the current GPU SFC architecture.

Technical Specifications & Requirements

  • Products covered: GPU SFC Main Control Card, GPU SMPS Battery Charger, GPU PCB with Conductor, GPU SFC Mimic Display, GPU DC Volt & Amp Meter PCB.
  • Core requirements: items must be compatible with the existing GPU SFC system, matching electrical ratings, control logic, connectors, interfaces, and mounting arrangements.
  • Documentation: provide technical datasheets, catalogs, drawings, and OEM authorization certificates where applicable; items must be new, genuine, and defect-free.
  • Traceability: bidder to supply manufacturer details and part numbers; components must be traceable to the original manufacturer.
  • Compliance: ensure all offered items meet stated compatibility and electrical/functional suitability for GPU SFC operation.

Terms, Conditions & Eligibility

  • Option Clause: purchaser may increase/decrease quantity up to 25% of bid/contract quantity at contract placement and during currency at contracted rates.
  • Delivery: delivery period starts from the last date of the original delivery order; extended time calculations apply with a minimum of 30 days.
  • Compliance: submit technical datasheets, OEM authorizations, and traceability details; refurbished or counterfeit items are not allowed unless explicitly permitted.
  • Eligibility: OEM authorization where applicable; items must be new, genuine, and suitable for GPU SFC systems.
  • Documentation: bidder must provide complete technical documents to establish compliance with BOQ/technical spec; incomplete claims may be rejected.

Key Specifications

    • GPU SFC Main Control Card: compatibility with existing GPU SFC system; electrical ratings and control interfaces must align
    • GPU SMPS Battery Charger: verify charging specifications match GPU SFC requirements
    • GPU PCB with Conductor: must be traceable to manufacturer, include conductor details
    • GPU SFC Mimic Display: must integrate with GPU SFC display logic
    • GPU DC Volt & Amp Meter PCB: must reflect accurate voltage/current measurement within system

Terms & Conditions

  • Option clause allows +/-25% quantity variation at contract and during currency

  • Delivery period computed from last date of original delivery order with minimum 30 days

  • OEM authorization and traceability must be provided for all items

  • Items must be new, genuine, and compatible with existing GPU SFC system

Important Clauses

Delivery Terms

Delivery period starts from the last date of original delivery order; extended time follows the option clause and is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days

OEM Authorization

Bidder to submit valid OEM authorization certificates and ensure traceability to the manufacturer with part numbers

Quality & Compliance

Items must be new, genuine, and free from defects; refurbished or counterfeit components are disallowed unless expressly permitted

Bidder Eligibility

  • Proven experience supplying GPU/航空/defense-grade electronic components

  • Demonstrated capability to provide OEM-authorized products

  • Financial viability evidenced by recent statements and stability

Advertisement

Tender Data

Bid Details

Quantity

12

Category

GPU SFC Main Control Card

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

7

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

GPU SFC Main Control Card , GPU SMPS Battery Charger , GPU PCB with Conductor , GPU SFC Mimic Display , GPU DC volt and Amp Meter PCB

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

TINSUKIA

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-TINSUKIATINSUKIA--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10023891.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

14-Oct-2026
Advertisement

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

GPU SFC Main Control Card

Ground Power Unit

1 pieces Delivery: 10 days
#2

GPU SMPS Battery Charger

Ground Power Unit

2 pieces Delivery: 10 days
#3

GPU PCB with Conductor

Ground Power Unit

4 pieces Delivery: 10 days
#4

GPU SFC Mimic Display

Ground Power Unit

1 pieces Delivery: 10 days
#5

GPU DC volt and Amp Meter PCB

Ground Power Unit

4 pieces Delivery: 10 days

Categories 12

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar GPU SFC component supply

4

Financial statements demonstrating financial stability

5

EMD documentation (amount not specified in data) and payment terms

6

Technical datasheets, product catalogs, and drawings

7

OEM authorization certificates (where applicable)

8

Proof of manufacturer traceability and part numbers

9

Declaration of new, unused, genuine items only

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for GPU SFC components tender in India 2026?

Bidders must meet eligibility criteria, submit GST, PAN, financial statements, and OEM authorizations. Provide complete technical datasheets and OEM traceability for all five items. Ensure compliance with the 25% quantity option and delivery terms starting from the original delivery order date. Include boQ conformity and supporting documentation to verify compatibility with the GPU SFC system.

What documents are required for GPU SFC component procurement in 2026?

Required documents include GST certificate, PAN, experience certificates for similar GPU system components, financial statements, EMD documentation, OEM authorization certificates, technical datasheets, product catalogs, and manufacturer traceability details. Ensure all documents establish compliance with BOQ and system compatibility.

What are the technical compatibility requirements for GPU SFC parts?

Parts must match electrical ratings, control logic, connectors, interfaces, and mounting arrangements of the existing GPU SFC system. Bid must include datasheets, OEM certificates, and drawings proving compatibility, with traceability to the manufacturer and part numbers clearly identified.

When is the delivery deadline for GPU SFC components procurement?

Delivery periods are linked to the last date of the original delivery order; if the option clause is exercised, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What is required for OEM authorization in GPU SFC bids?

Submit valid OEM authorization certificates where applicable, ensure components are traceable to the manufacturer, and provide manufacturer details and part numbers to establish authenticity and authenticity verification for all five items.

What is the scope of the 25% quantity option in this tender?

The purchaser may adjust ordered quantity up to 25% at contract placement and during currency; delivery time extends accordingly based on the extended quantity relative to the original quantity, maintaining contracted rates.

What quality standards must GPU SFC components meet?

All items must be new, genuine, and defect-free; refurbished or counterfeit components are not allowed unless explicitly permitted. No compromises on compatibility with the GPU SFC system or traceability requirements.

Advertisement