Bid Publish Date
18-Jul-2026, 3:56 pm
Bid End Date
28-Jul-2026, 4:00 pm
Value
₹9,971
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Contract quantity/duration may adjust up to 50% with consent
EMD amount and delivery timelines not disclosed; verify during bidding
No BOQ items present; scope appears consolidated for sand filling and maintenance
Site is 400 KV switchyard at Mathura, UP; sand supply must meet site condition requirements
No explicit payment terms published; bidder should obtain exact terms during bid submission and contract finalization
No fixed delivery window specified; contract may allow up to 50% quantity/duration variation
No LD details published; confirm penalties or performance bonds in final contract
Experience in repair/maintenance or installation work for high-voltage switchyards
Financial stability demonstrated by recent financial statements
Compliance with site safety requirements for substation works
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Supply and filling of Yamuna sand in the different pits as per site condition in 400 KV Switchyard at 400 KV SubstationsS Manth; Substation; Service Provider
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Mathura
Delivery Pincodes
281001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sakir Ali | 281001,ELECTRICITY 400 KV SUB STATION DIVISION MANTH MATHURA | Mathura | Uttar Pradesh | 281001 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar repair/maintenance or installation projects
Financial statements (past 2-3 years)
EMD/Security deposit details (if applicable; amount not specified)
Technical bid documents demonstrating capability for sand filling in switchyard environment
OEM authorization (if applicable for supplied components)
Any site-specific safety certifications or training records
Key insights about UTTAR PRADESH tender market
Bidders should register on the portal, obtain tender access, and submit required documents such as GST, PAN, financials, and experience certificates. The tender indicates a scope for Yamuna sand filling in pits and allows up to 50% variation in quantity/duration. Confirm EMD amount and final payment terms in the bid kit.
Required documents typically include GST certificate, PAN, experience certificates for similar projects, financial statements, and OEM authorizations if supplied components are involved. Ensure site safety certifications and substation access approvals are included, along with any technical bid forms requested by UPPCL.
Technical needs focus on safe handling of Yamuna sand in high-voltage pits and site-conditioned fill specifications. While exact standards are not listed, bidders should prepare for field coordination with switchyard operations, sand_quantity feasibility studies, and compliance with site safety protocols.
The tender data provided does not include explicit submission deadlines. Bidders must check the official portal listing for final dates, and align submission with the 50% variation clause, ensuring all required documents and technical bids are prepared on time.
Payment terms are not explicitly published in the tender data. Bidders should verify during bid submission and contract finalization; typical terms may include progress payments tied to milestones and completion of sand filling in switchyard pits, subject to vendor performance.
Qualification likely includes experience in substation maintenance or related sand filling tasks, financial stability, and safety compliance. While explicit years or turnover aren’t stated, bidders should assemble evidence of relevant HV-substation work experience and safety certifications to strengthen eligibility.
No BOQ items are listed; the procurement appears consolidated for repair/maintenance and sand filling rather than itemized components. Bidders should prepare a comprehensive proposal covering field works, site adaptation, safety compliance, and sand handling under the stated scope.
The tender data does not specify standards. Bidders should anticipate IS/IEC safety practices and substation operation guidelines, along with site-specific safety training and Sand handling protocols. Include certifications and methodology for safe HV environment work.