Bid Publish Date
30-Sep-2026, 9:25 am
Bid End Date
15-Oct-2026, 10:00 am
EMD
₹1,00,000
Location
Progress
Indian Army announces a tender for Excavation with Sub-Grade Preparation, Anti-Termite with Weed Control, Sub Base with Rigid Concrete Base, Steel Reinforcement, Multilayer Cushioned Synthetic Surface, Volleyball Net and Posts, Galvanized Steel Referee Chair, Chain Link Fencing, Flood Lighting with Structural Canopy Support Columns, Overhead Canopy Cover Rugged Green Fibre in SOUTH WEST DELHI, DELHI. Quantity: 4994. Submission Deadline: 15-10-2026 10: 00: 00. Last date to apply is approaching fast!
Quantity
4994
Category
Multilayer Cushioned Synthetic Surface
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Excavation with Sub-Grade Preparation , Anti-Termite with Weed Control , Sub Base with Rigid Concrete Base , Steel Reinforcement , Multilayer Cushioned Synthetic Surface , Volleyball Net and Posts , Galvanized Steel Referee Chair , Chain Link Fencing , Flood Lighting with Structural Canopy Support Columns , Overhead Canopy Cover Rugged Green Fibre
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Pre-Bid Date
06-10-2026 12:00:00
Pre-Bid Venue
INSTITUTE OF MILITARY LAW, RAU TULA RAM MARG, SHANKAR VIHAR, NEW DELHI
Max Delivery Days
75
Delivery Locations
1
Delivery Cities
South West delhi
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South West delhi | South West delhi | - | - | 532 | 75 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Excavation with Sub-Grade Preparation
Excavation to a depth of 15inch removing all weeds and grass roots. Creating a slope of 4inch from the centre line towards the lower end ensuring extreme care for a correct slope of 1inch in every 12feet Wetting and compaction by 8 to 10 ton roller to achieve 95percent proctor density
Anti-Termite with Weed Control
Carryout anti termite and de weeding treatment on the total area by making 9inch deep holes spaced 12inch apart injecting the chemicals and spraying the surface
Sub Base with Rigid Concrete Base
Providing and laying a Water Bound Macadam WBM layer followed by a heavy duty highly durable M20 grade cement concrete base 1 to 1 to 5 to 3 The concrete base must be laid exactly 5 inches thick and properly levelled with the mandated slope
Steel Reinforcement
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically treated bars of grade Fe-500 D or more. (Recalculated proportionally for 532 SQM).
Multilayer Cushioned Synthetic Surface
Providing and Laying an ITF oblique FIVB approved 9 layer synthetic acrylic cushion system Includes primer resurfacer heavy rubber cushion layers fine rubber cushion layers texture coat and UV resistant non fading colour finish Playing area to be marked with 5cm wide white lines as per international standards
Volleyball Net and Posts
Standard heavy-duty MS movable posts (2.55m height) with wire tightening mechanisms. Includes official 10x1m net with 10cm square black mesh and fiberglass antennas
Galvanized Steel Referee Chair
Galvanized steel referee chair of 2.4 meter height and 0.8 meter width
Chain Link Fencing
Providing and erecting 15feet height MS Chain link fencing of 2.8mm wire thickness 50x50mm mesh. Supported by 2inch Dia vertical MS Pipes erected 10feet center to center and 1inch horizontal pipes fitted at 2 places. Painted with Zinc rich PU Primer and two coats of enamel paint.
Flood Lighting with Structural Canopy Support Columns
Four heavy duty, load bearing MS steel columns extended to minimum 7 meters oblique 23 ft clearance to support canopy wind oblique weight loads. Integrated LED lighting system designed to explicitly deliver 1500 lux at 1 meter above the playing surface. Includes necessary 15mm 2core wire, insulated boxes, and MCB switches.
Overhead Canopy Cover Rugged Green Fibre
Providing and erecting a highly durable, waterproof, and UV resistant rugged green fibre roof covering the 28m x 19m platform, structurally integrated onto the lighting columns Item 9.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Excavation with Sub-Grade Preparation | Excavation to a depth of 15inch removing all weeds and grass roots. Creating a slope of 4inch from the centre line towards the lower end ensuring extreme care for a correct slope of 1inch in every 12feet Wetting and compaction by 8 to 10 ton roller to achieve 95percent proctor density | 532 | sqm | pawandeep_838 | 75 | |
| 2 | Anti-Termite with Weed Control | Carryout anti termite and de weeding treatment on the total area by making 9inch deep holes spaced 12inch apart injecting the chemicals and spraying the surface | 532 | sqm | pawandeep_838 | 75 | |
| 3 | Sub Base with Rigid Concrete Base | Providing and laying a Water Bound Macadam WBM layer followed by a heavy duty highly durable M20 grade cement concrete base 1 to 1 to 5 to 3 The concrete base must be laid exactly 5 inches thick and properly levelled with the mandated slope | 68 | cum | pawandeep_838 | 75 | |
| 4 | Steel Reinforcement | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically treated bars of grade Fe-500 D or more. (Recalculated proportionally for 532 SQM). | 2,364 | kg | pawandeep_838 | 75 | |
| 5 | Multilayer Cushioned Synthetic Surface | Providing and Laying an ITF oblique FIVB approved 9 layer synthetic acrylic cushion system Includes primer resurfacer heavy rubber cushion layers fine rubber cushion layers texture coat and UV resistant non fading colour finish Playing area to be marked with 5cm wide white lines as per international standards | 532 | sqm | pawandeep_838 | 75 | |
| 6 | Volleyball Net and Posts | Standard heavy-duty MS movable posts (2.55m height) with wire tightening mechanisms. Includes official 10x1m net with 10cm square black mesh and fiberglass antennas | 1 | set | pawandeep_838 | 75 | |
| 7 | Galvanized Steel Referee Chair | Galvanized steel referee chair of 2.4 meter height and 0.8 meter width | 2 | nos | pawandeep_838 | 75 | |
| 8 | Chain Link Fencing | Providing and erecting 15feet height MS Chain link fencing of 2.8mm wire thickness 50x50mm mesh. Supported by 2inch Dia vertical MS Pipes erected 10feet center to center and 1inch horizontal pipes fitted at 2 places. Painted with Zinc rich PU Primer and two coats of enamel paint. | 430 | sqm | pawandeep_838 | 75 | |
| 9 | Flood Lighting with Structural Canopy Support Columns | Four heavy duty, load bearing MS steel columns extended to minimum 7 meters oblique 23 ft clearance to support canopy wind oblique weight loads. Integrated LED lighting system designed to explicitly deliver 1500 lux at 1 meter above the playing surface. Includes necessary 15mm 2core wire, insulated boxes, and MCB switches. | 1 | court | pawandeep_838 | 75 | |
| 10 | Overhead Canopy Cover Rugged Green Fibre | Providing and erecting a highly durable, waterproof, and UV resistant rugged green fibre roof covering the 28m x 19m platform, structurally integrated onto the lighting columns Item 9. | 532 | sqm | pawandeep_838 | 75 |