TenderDekho Logo
Closed GEM

Indian Army 3D Coordinate Measuring Machine Tender Sonitpur Assam 2025

Bid Publish Date

18-Dec-2025, 7:04 pm

Bid End Date

22-Dec-2025, 10:00 am

Progress

Issue18-Dec-2025, 7:04 pm
Technical19-12-2025 19:26:54
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 3

Tender Overview

The Indian Army, Department Of Military Affairs, seeks a 3D Coordinate Measuring Machine (Q3) for procurement in Sonitpur, Assam. The tender has no listed BOQ items and no explicit estimated value or EMD. Key contract flexibilities include a 25% quantity uplift/downshift option at the time of order placement and during contract currency, with extension calculations based on (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Bidders must adhere to end-user and non-disclosure requirements and provide vendor code creation documents. The ATC emphasizes OEM involvement, pre-bid samples, and post-award performance documentation, with emphasis on quality fabrication and manufacturer status for pre-fab shelters related work. This tender appears focused on specialized metrology gear with stringent confidentiality clauses and supplier authentication.

The opportunity targets suppliers of high-precision measurement equipment capable of meeting government procurement standards, offering delivery against contract quantities under flexible extension terms, and providing certification-ready documentation. The location, organization, and product category are clearly defined (Indian Army, 3D Coordinate Measuring Machine, Sonitpur, Assam), with unique clauses on sample quality, OEM authorization, and NDA compliance shaping the bid approach.

Technical Specifications & Requirements

  • Product category: 3D Coordinate Measuring Machine (Q3)
  • Delivery/quantity flexibility: up to 25% variation at order; additional extension time calculated as Difference formula, min 30 days
  • Key ATC/documents: End User Certificate in buyer format; Non-Disclosure Declaration on bidder letter head; OEM authorization certificate; Performance/completion certificates from previous users for similar goods; Bidder must be a manufacturer of pre-fab shelter and related documents
  • Pre-bid expectations: Only makes per pre-bid meeting samples; quality assurance in fabrication; EFT mandate; PAN and GSTIN copies; cancelled cheque
  • Submission specifics: Vendor code creation documents required; bid must include the listed NDA and non-disclosure clauses
  • Additional notes: No explicit BOQ items; no start/end dates published; no explicit estimated value or EMD disclosed.

Terms, Conditions & Eligibility

  • EMD/financials: Not disclosed in the available data; bidders should verify the exact amount in terms and conditions
  • Delivery timeline: Delivery period tied to original delivery order; extended period rules apply per option clause
  • Payment terms: Not specified in the excerpt; verify with official tender documents
  • Documents to submit: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate; End User Certificate; Non-Disclosure Declaration; OEM authorization; Performance certificates; Manufacturer status for pre-fab shelter work
  • Eligibility criteria: Manufacturer of pre-fab shelter; OEM authorization; prior performance certificates; adherence to NDA
  • Special clauses: End User Certificate in Buyer format; sample-based makes approval; confidentiality and legal action for norms breach
  • Penalties/LD: Not specified in data; check final tender terms for penalties or performance bonds

Key Specifications

  • 3D Coordinate Measuring Machine (Q3)

  • 25% quantity variation

  • Delivery extension rules with min 30 days

  • NDA, End User Certificate, OEM authorization

  • Pre-bid sample compliance; high-quality fabrication

Terms & Conditions

  • Quantity variation up to 25%

  • Delivery period adjustments with formula

  • NDA and End User Certificate mandatory

Important Clauses

Delivery Schedule

Delivery period starts from the last date of original delivery order; extension time calculated per Increased quantity formula; minimum 30 days

NDA Requirement

Non-Disclosure Declaration must be on bidder letter head; breach may invoke legal action

OEM Authorization

OEM authorized certificate required; bidder must be manufacturer of pre-fab shelter

Bidder Eligibility

  • Manufacturer of pre-fab shelters

  • OEM authorization certificate

  • Prior performance certificates for similar goods

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

3D Coordinate Measuring Machine (Q3)

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-8729870.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque

4

EFT Mandate

5

End User Certificate

6

Non-Disclosure Declaration

7

OEM authorization certificate

8

Performance certificates from previous users

9

Manufacturer proof for pre-fab shelter work

Technical Results

S.No Seller Item Date Status
1
COMPUTECH INDIA   Under PMA
Make : NA Model : Trimos A6-400019-12-2025 19:26:54
2
S & N DISTRIBUTORS   Under PMA
Make : NA Model : Trimos A6-400019-12-2025 19:26:59
3
SRP ENTERPRISE   Under PMA
Make : NA Model : Trimos A6-400019-12-2025 19:29:46

Financial Results

Rank Seller Price Item
L1
SRP ENTERPRISE(MII)   Under PMA
Item Categories : 3D Coordinate Measuring Machine
L2
COMPUTECH INDIA (MII)   Under PMA
Item Categories : 3D Coordinate Measuring Machine
L3
S & N DISTRIBUTORS (MII)   Under PMA
Item Categories : 3D Coordinate Measuring Machine

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for the 3D coordinate measuring machine tender in Sonitpur Assam?

Bidders must provide PAN, GSTIN, cancelled cheque, EFT mandate, End User Certificate, NDA, and OEM authorization. Include performance certificates from previous users and evidence of manufacturing capability for pre-fab shelters. Ensure sample quality from pre-bid meeting and comply with 25% quantity variation terms.

What documents are required for Indian Army metrology equipment bids in Assam?

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, End User Certificate, NDA, OEM authorization, and performance certificates from prior users. Manufacturer proof for pre-fab shelters must be supplied along with relevant fabrication documents.

What are the delivery time rules for quantity changes in this tender?

Delivery can be adjusted for up to 25% quantity changes. The extended delivery period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a guaranteed minimum of 30 days for any extension.

What NDA and End User Certificate format is required for this Army bid?

Submit a Non-Disclosure Declaration on the bidder’s letter head and an End User Certificate in the buyer’s standard format to protect contract details and confirm end use as specified by the Indian Army.

Which standards or brands are mandated for the 3D CMM tender in Assam?

The available data does not specify particular standards or brands. Verify in the official tender documents for ISI/ISO requirements, or OEM-approved models and any metrology standards to meet Army procurement expectations.

What are the key eligibility criteria for pre-fab shelter manufacturers in this bid?

Eligibility requires manufacturer status for pre-fab shelters, OEM authorization, and prior performance certificates for similar goods. Include NDA compliance, End User Certificate, and related fabrication documentation with the bid.

When is delivery expected after the original order in this Army tender?

Delivery period begins from the last date of the original order. If the option clause is exercised, the extension follows the 25% quantity rule with the calculated period and a minimum 30-day extension.

How to handle quantity variation terms in this Army tender?

The purchaser may adjust quantity by up to 25% at placement and during the contract at contracted rates. Bidder must acknowledge and prepare logistics to scale delivery accordingly.