Bid Publish Date
04-Aug-2026, 10:25 am
Bid End Date
17-Aug-2026, 11:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Uttar Pradesh Cooperative Sugar Factories Federation Limited invites bids for a Continuous Centrifugal Machine UC 1500 Uttam Make to support sugar processing operations in Uttar Pradesh. The scope centers on the supply of a single or multiple centrifugals as per project demand, with the unique component being the shaft Drg No 499/26 dated 30-07-2026. No BOQ quantity is disclosed, and no estimated value or EMD is provided in the available data. The tender emphasizes ATC terms that allow quantity variation up to 25% and a delivery timeline linked to the last delivery order. This procurement focuses on equipment compatibility with Uttam centrifugal technology and UP sugar factory needs.
Quantity may be increased or decreased by up to 25% at contract placement
Delivery period extends from the last date of the original order with a minimum 30-day extension
Bidder must comply with ATC terms and be able to supply Uttam Make UC 1500 centrifugal equipment
Payment terms are not explicitly stated in the ATC; bidders should anticipate standard government procurement terms and confirm at bid submission
Delivery starts from the last date of the original delivery order; option-based quantity changes require calculating extension hours using the formula and a minimum 30 days
No LD details provided; bidders should seek clarification during bid process and prepare for standard LD terms if specified later
Experience in supplying centrifugal machinery for sugar processing plants
Ability to meet Uttam Make UC 1500 specifications
Compliance with UP procurement processes and ATC terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of New Shaft Drg No 499/26 dated 30-07-2026 Continuous Centrifugal Machine UC 1500 Uttam Make
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
20
Delivery Locations
1
Delivery Cities
Saharanpur
Delivery Pincodes
247232
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Karan Singh | 247232,THE KISAN COOPERATIVE SUGAR FACTORY LTD SARSAWA (SAHARANPUR) GST- 09AAAJT1019Q1ZO | Saharanpur | Uttar Pradesh | 247232 | 1 | 20 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar centrifugal machinery supply
Financial statements for the last 2-3 years
EMD/Security deposit documents as applicable
Technical bid documents and compliance certificates
OEM authorization /authorized dealership certificate for Uttam make centrifugal machines
Extended Deadline
17-Aug-2026, 11:00 am
Opening Date
17-Aug-2026, 11:30 am
Key insights about UTTAR PRADESH tender market
Bidders should prepare GST, PAN, financials, and experience certificates; obtain OEM authorization for Uttam Make UC 1500; submit Technical bid with compliance to ATC terms; ensure capability to manage +/-25% quantity adjustments and deliver per the extended timeline from the last delivery order date.
Required documents include GST certificate, PAN card, up-to-date experience certificates for centrifugal equipment supply, financial statements, EMD documents, OEM authorization for Uttam Make UC 1500, and technical compliance certificates to prove equipment capabilities.
Delivery terms permit a +/-25% quantity change; delivery starts after the original order date; extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
The data does not specify ISI/ISO standards; bidders should verify during bid submission and secure Uttam Make certification and any local UP procurement compliance documents, ensuring equipment compatibility with sugar plant requirements.
Payment terms are not explicitly stated in the ATC; bidders should anticipate standard government practice (milestones linked to delivery or performance) and confirm terms during bid submission.
The Shaft Drg No 499/26 dated 30-07-2026 serves as a unique design reference for the UC 1500 Uttam centrifugal machine; bidders must ensure alignment with this drawing in their technical submission and supplier qualification.
Bidders should demonstrate prior experience supplying centrifugal equipment for sugar factories, provide relevant project references, and show ability to meet the Uttam UC 1500 specification and OEM requirements.
Obtain a current OEM authorization letter from Uttam for the UC 1500 centrifuge, include it with the technical bid, and ensure validity through the bid submission date; include manufacturer contact details for verification.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS