TenderDekho Logo
Active GEM

Invitation to Bid - Spring charging Motor for 220 Kv,Motor 230V AC DC TYPE C-22,Spring charging motor for 66kV,Torsion in SIKAR, RAJASTHAN

Bid Publish Date

28-Sep-2026, 3:52 pm

Bid End Date

19-Oct-2026, 4:00 pm

EMD

₹33,722

Progress

Issue28-Sep-2026, 3:52 pm
AwardPending

Dedicated Freight Corridor Corporation Of India Limited invites bids for Spring charging Motor for 220 Kv, Motor 230V AC DC TYPE C-22, Spring charging motor for 66kV, Torsion Spring Right for 66kV, Torsion Spring Left for 66kV, Surface space heater for 66kV, Thermostate for 66kV, Silica Gel Breather 250 gram, Silica Gel Breather 500 gram, Split type arching horn, One set of Gasket, 630A MOTORIZED CHANGEOVER SWITCH, 63A 2POLE 2WAY MOTORIZED CHANGE OVER SWITCH, Solid Copper Busbar, Lighting Arrester disconnector, Stainless Steel Bolt M12x100, Stainless Steel Bolt M12x150, Silica Gel blue 4 to 6 mm, 25 kV Drop Out fuse, Hot air gun, Hydrometer, Long barreal 70 sqmm Copper Lug, Tie rod insulator Operating rod insulator in SIKAR, RAJASTHAN. Quantity: 1179. Submission Deadline: 19-10-2026 16: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

1179

Category

Solid Copper Busbar

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Spring charging Motor for 220 Kv , Motor 230V AC DC TYPE C-22 , Spring charging motor for 66kV , Torsion Spring Right for 66kV , Torsion Spring Left for 66kV , Surface space heater for 66kV , Thermostate for 66kV , Silica Gel Breather 250 gram , Silica Gel Breather 500 gram , Split type arching horn , One set of Gasket , 630A MOTORIZED CHANGEOVER SWITCH , 63A 2POLE 2WAY MOTORIZED CHANGE OVER SWITCH , Solid Copper Busbar , Lighting Arrester disconnector , Stainless Steel Bolt M12x100 , Stainless Steel Bolt M12x150 , Silica Gel blue 4 to 6 mm , 25 kV Drop Out fuse , Hot air gun , Hydrometer , Long barreal 70 sqmm Copper Lug , Tie rod insulator Operating rod insulator

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

14

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Sikar

Delivery Pincodes

332715

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sachchidanand Patel332715,New Shrimadhopur Station Dedicated Freight Corridor Corporation of India Ltd. Near to Malakali VillageSikarRajasthan332715345-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9927063.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Railways Public Sector Undertakings

Office Name

Office Of Cgm Jaipur

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 23 Items Sign in for GEM prices

#1

Spring charging Motor for 220 Kv

Spring charging Motor for 220 kV , 2000A Crompton greaves Make Triple Pole SF6 Circuit Breaker

3 nos Delivery: 45 days
#2

Motor 230V AC DC TYPE C-22

Motor 230V AC DC TYPE C22 for 132kV, 1600A Crompton greaves Make Triple Pole SF6 Circuit Breaker

1 nos Delivery: 45 days
#3

Spring charging motor for 66kV

Spring charging motor for 66kV, 2000A Crompton greaves Make Double Pole SF-6 Circuit Breaker

5 nos Delivery: 45 days
#4

Torsion Spring Right for 66kV

Torsion Spring Right for 66kV, 2000A Crompton greaves Make Double Pole SF-6 Circuit Breaker

20 nos Delivery: 45 days
#5

Torsion Spring Left for 66kV

Torsion Spring Left for 66kV, 2000A Crompton greaves Make Double Pole SF-6 Circuit Breaker

20 nos Delivery: 45 days
#6

Surface space heater for 66kV

Surface space heater for 66kV, 2000A Crompton greaves Make Double Pole SF-6 Circuit Breaker

10 nos Delivery: 45 days
#7

Thermostate for 66kV

Thermostate for 66kV, 2000A Crompton greaves Make Double Pole SF-6 Circuit Breaker

10 nos Delivery: 45 days
#8

Silica Gel Breather 250 gram

Silica Gel Breather 250 gram for 27.5 kV 240V , 100kVA & 10kVA LT Supply Transformer

50 nos Delivery: 45 days
#9

Silica Gel Breather 500 gram

Silica Gel Breather 500 gram for 27.5 kV 240V , 100kVA & 10kVA LT Supply Transformer

50 nos Delivery: 45 days
#10

Split type arching horn

Split type arching horn set for 27.5 kV 240V , 100kVA & 10kVA LT Supply Transformer

30 set Delivery: 45 days
#11

One set of Gasket

One set of Gasket for 27.5 kV 240V , 100kVA & 10kVA LT Supply Transformer

10 set Delivery: 45 days
#12

630A MOTORIZED CHANGEOVER SWITCH

630A MOTORIZED CHANGEOVER SWITCH WITH ATS CONTROLER for ACDB Panel at TSS

1 set Delivery: 45 days
#13

63A 2POLE 2WAY MOTORIZED CHANGE OVER SWITCH

63A 2POLE 2WAY MOTORIZED CHANGE OVER SWITCH WITH ATS CONTROLLER ACDB panel at SP SSP ATS PP

4 nos Delivery: 45 days
#14

Solid Copper Busbar

18mm Dia Solid Copper Busbar used in OHE Isolators

100 mtr Delivery: 45 days
#15

Lighting Arrester disconnector

42 kV Lighting Arrester disconnector

80 nos Delivery: 45 days
#16

Stainless Steel Bolt M12x100

Stainless Steel Bolt M12x100 with Plain Washer and Nut

200 nos Delivery: 45 days
#17

Stainless Steel Bolt M12x150

Stainless Steel Bolt M12x150 with Plain Washer and Nut

200 nos Delivery: 45 days
#18

Silica Gel blue 4 to 6 mm

Silica Gel blue 4 to 6 mm cristal for transformer breather

100 kg Delivery: 45 days
#19

25 kV Drop Out fuse

25 kV Drop Out fuse assembly used in OHE

20 nos Delivery: 45 days
#20

Hot air gun

Coil type hot air gun

5 nos Delivery: 45 days
#21

Hydrometer

Hydrometer sautable for 2V, 400 AH battery bank

50 nos Delivery: 45 days
#22

Long barreal 70 sqmm Copper Lug

Long barreal 70 sqmm Copper Lug for used in discharge rod

200 nos Delivery: 45 days
#23

Tie rod insulator Operating rod insulator

Tie rod insulator/Operating rod insulator for 25 kV Isolators

10 nos Delivery: 45 days

Categories 45

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement