Bid Publish Date
13-Aug-2026, 10:01 am
Bid End Date
26-Aug-2026, 12:00 pm
Location
Progress
RAThe procurement opportunity is issued by the Indian Army (Department Of Military Affairs) for wall mounted fans. The BOQ shows no listed quantities, and the estimated value is not disclosed. The contract allows a possible 25% quantity increase and specifies delivery terms linked to the original delivery date. The tender emphasizes mandatory certifications and post-sales support, with a focus on reliable installation and maintenance capabilities. Bidders should prepare for a performance-based supply contract with defined LD penalties. This opportunity requires compliance with supplier qualification standards and robust service infrastructure in India.
Product/service: wall mounted fans
Quantity/BOQ: not disclosed in data
Estimated value: not disclosed
Experience: supplier of electrical fans or comparable equipment
Quality/standards: ISO 9001; post-sales service in India
Delivery: per original delivery order with option for 25% extra
Warranty: 1-year warranty; OEM warranties required
Penalties: LD 0.5% per week up to 10%
Option clause allows 25% quantity variation
ISO 9001 certification mandatory for bidder or OEM
1-year warranty with India-based service support
GST handling by bidder; reimbursement as actuals or as per applicable rate; no fixed GST amount stated
Delivery period starts from the last date of original delivery order; extension rules apply with calculated additional time
0.5% per week late delivery, capped at 10% of contract value
Non-liquidation and not under insolvency or court receivership
ISO 9001 certification for bidder or OEM
Demonstrated installation, commissioning, and after-sales service capability in India
Start
06-Sep-2026, 1:00 pm
End
07-Sep-2026, 1:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
40
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
7
Past Performance
50 %
Warranty Period
1 years
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Wall Mounted Fan
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
CHAMOLI
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | CHAMOLI | CHAMOLI | - | - | 40 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates for wall mounted fans supply or similar electrical equipment
Financial statements or solvency documents
EMD submission proof (as per bid document)
Technical bid documents and compliance certificates
OEM authorization letter (if bidding on OEM products)
ISO 9001 certificate (bidder or OEM)
Key insights about UTTARAKHAND tender market
Bidders must submit ISO 9001 certificates, OEM authorizations if applicable, GST details, and required experience proofs. The tender provides changes up to 25% quantity and imposes LD at 0.5% weekly with a 10% contract cap. Ensure service center details and 1-year warranty documentation accompany the bid.
Submit GST and PAN, ISO 9001 certificate, OEM authorization (if applicable), financial statements, experience certificates for similar fans, installation/maintenance capability proofs, and EMD submission as per the bid document. Also include service center locations in India.
A 1-year warranty applies from final acceptance or after installation. OEM warranty certificates must be provided at delivery. The supplier must maintain after-sales service capability within India and be ready to rectify breakdowns during the warranty period.
Delivery starts from the last date of the original order; if quantity increases, extended delivery uses a calculated time formula with a minimum 30 days. Late delivery incurs 0.5% LD per week, capped at 10% of contract value.
Verify the bidder or OEM holds an active ISO 9001 certificate and provide the certificate number, issuing body, and validity. The tender requires ISO 9001 compliance as a condition for bid acceptance and post-delivery support.
The purchaser may increase or decrease the quantity up to 25% of bid quantity at contract placement and during the currency at contracted rates, with delivery timing adjusted accordingly.
Bidders must demonstrate a well-established service network in India, including installation, commissioning, training, troubleshooting, and maintenance. Provide the location of service centers near consignee destinations in the bid.
Bidder bears GST applicability; reimbursement will be per actuals or the applicable rate, whichever is lower, up to the quotation percentage. Ensure GST details are accurate in the bid submission.