Closed GEM

Housing And Urban Planning Department Uttar Pradesh Air Conditioner Supply & Installation Tender Mathura 2026 ISO 9001

Bid Publish Date

09-May-2026, 1:42 pm

Bid End Date

19-May-2026, 2:00 pm

Progress

Issue09-May-2026, 1:42 pm
AwardPending

Tender Overview

Housing and Urban Planning Department, Uttar Pradesh invites a lump-sum bid for air conditioner supply and installation of 08 units in Mathura, Uttar Pradesh (281001). Consumables are included in the contract price. The scope includes procurement, installation, and ongoing service within a single contract framework. A quantity/duration flex clause allows up to 25% adjustment at bid issue and post-issue stages. References to mandatory declarations and certificates accompany the tender, signaling emphasis on compliance, vendor credibility, and installation capability. The opportunity targets vendors with a proven track record in HVAC turnkey deliveries and post-installation support, leveraging a local government procurement channel to streamline delivery and commissioning.

Technical Specifications & Requirements

  • Product/Service: Supply and installation of 08 air conditioners; consumables included in contract cost.
  • Location: Mathura, Uttar Pradesh 281001; deployment under Housing and Urban Planning Department.
  • Standards/Certifications: ISO 9001 indicated in attached documents; OEM letter and turnover requirements referenced; MSME ZED certificate and CVC pledge attached.
  • Bid conditions: GFR Rule 149 declarations, LD declaration, bid security declaration attached; installation declarations to be submitted; hard copy before technical opening.
  • Vendor context: No BOQ items; emphasis on turnkey execution, installation, and compliance with referenced ATC/terms.
  • Delivery/Installation: 08 units, with consumables included; installation to be completed under single contract terms.

Terms, Conditions & Eligibility

  • EMD/Financials: EMD amount not specified; bid security declarations attached; financial standing evidenced via turnover declarations.
  • Experience: OEM letter and turnover declarations required; MSME ZED certificate suggests preference for small/medium enterprises.
  • Delivery & Payment: Quantity/duration adjustment up to 25%; payment terms not detailed in available data; installation must align to department timelines.
  • Documents: GST registration, PAN, experience certificates, financial statements, technical bid documents, OEM authorizations; ISO 9001 acknowledgment; CVC pledge attached.
  • Penalties/LD: Liquidated damages declaration attached; strict adherence to GFR-related terms; installation declarations required.

Key Specifications

  • Product/service names: 08 air conditioners, supply and installation

  • Quantities: 08 units

  • Estimated value: not disclosed

  • Experience: OEM letter and turnover declarations required

  • Quality/standards: ISO 9001 indicated; IS or BIS not specified

  • Delivery/installation: turnkey installation within contract terms

  • Warranty/AMC: not specified; references to standard declarations

  • OEM/brand: OEM letter required

Terms & Conditions

  • Key Term 1: 25% quantity/duration flex allowed at bid issue and post-issue

  • Key Term 2: ISO 9001 certification and OEM turnover documentation required

  • Key Term 3: GFR 149 declarations and LD/bid security declarations attached

Important Clauses

Payment Terms

No explicit payment schedule provided; bidders should expect lump-sum payment on completion per contract terms; ensure compliance with attached declarations and GST/PAN requirements.

Delivery Schedule

Turnkey supply and installation of 08 air conditioners; deployment within contract period with consumables included; section indicates no BOQ and mandatory installation declarations.

Penalties/Liquidated Damages

LD declaration attached; standard government LD provisions may apply for delays or non-compliance; refer to attached LD and GFR declarations.

Bidder Eligibility

  • Must hold ISO 9001 certification (or equivalent) and provide OEM authorization

  • Demonstrate turnover as evidence of financial capacity per turnover declarations

  • Provide MSME ZED certificate and CVC pledge where applicable

  • Submit installation capability proof for HVAC turnkey projects

  • Submit GST registration and PAN; provide experience certificates for similar deployments

Authority & Contact

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

2 Days

Requirements

Min. Avg. Annual Turnover

5

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Facility Management Services - LumpSum Based - SUPPLY AND INSTALLATION FOR AIR CONDITIONER; SUPPLY AND INSTALLATION FOR AIR CONDITIONER 08 NOS; Consumables to be provided by service provider (inclusive in contract cost)

Authority Records

HOUSING AND URBAN PLANNING DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9301735.pdf

Main Document

Scope Of Work Document

SCOPE_OF_WORK

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates for HVAC turnkey projects

4

Financial statements / turnover evidence

5

EMD documents or bid security declaration

6

Technical bid documents

7

OEM authorization / turnover letter

8

ISO 9001 certificate (if applicable)

9

MSME ZED certificate (attached)

10

CVC pledge certificate

11

Installation declaration

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for air conditioner tender in Mathura UP 2026?

Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD or bid security declaration, technical bid documents, OEM authorization, ISO 9001 proofs, and MSME ZED certificate as attached. Ensure 08 units scope, consumables included, and comply with 25% quantity/duration flex.

What documents are required for HVAC turnkey tender in UP?

Required documents include GST, PAN, experience certificates for HVAC installations, financial statements showing turnover, EMD/bid security declarations, OEM authorization letters, ISO 9001 certification, MSME ZED certificate, and CVC pledge certificate; installation declarations must be submitted before technical opening.

What are the technical specifications for 08 air conditioners in this bid?

Technical scope specifies supply and installation of 08 air conditioners with consumables included in contract price. No BOQ items; installation declarations and OEM turnover evidence are required; ISO 9001 is indicated among attached documents.

When is the 25% quantity/duration flex allowed for this tender UP?

The buyer allows up to 25% variation at the time of contract issue and post-issue; bidders must accept revised quantity or duration as per attached generic clause and GFR declarations.

What are the payment terms for the UP air conditioner contract?

Explicit payment terms are not published; bidders should anticipate lump-sum payment on completion per contract and ensure GST compliance; verify terms during bid opening and in ATC/Liquidated Damages declarations.

What certifications are mandatory for eligibility in this UP tender?

Mandatory certifications include ISO 9001, OEM authorization letters, and turnover proof. Additionally, MSME ZED certificate and CVC pledge may influence eligibility; ensure installation capability and prior HVAC turnkey experience.

What is the bidding location and organization for this HVAC tender UP?

Bidding pertains to the Housing and Urban Planning Department, Uttar Pradesh, Mathura; procurement is for 08 air conditioners with installation; ensure compliance with GFR declarations and the attached terms before submission.

What happens if there are delays in installation for UP HVAC tender?

Liquidated damages are referenced via LD declarations; bidders should plan for timely delivery and installation as per contract; ensure warranties, penalties, and LD terms are clearly understood and aligned with GFR guidelines.