TenderDekho Logo
Active GEM

Bharat Petroleum Corporation Ltd shaft motors & seals procurement Mumbai Maharashtra 2026 ISO/IS 550 compliant details

Bid Publish Date

09-Oct-2026, 3:16 pm

Bid End Date

23-Oct-2026, 2:00 pm

Progress

Issue09-Oct-2026, 3:16 pm
AwardPending

Key Highlights

  • • OEM Authorization Letter mandatory for bid submission
  • • ATC document and related declarations required (Holiday listing, Land border declaration)
  • • Option clause permits up to 25% quantity increase/decrease at contracted rates
  • • 23 items with PN references across shaft, bushings, sleeves, seals, gaskets, and related motor components

Tender Overview

Bharat Petroleum Corporation Ltd in Mumbai, Maharashtra invites bids for a broad scope of mechanical components for motor assemblies, including shaft coupling SU MOTORS PN 5895, mechanical seals outer/inner SU MOTORS, O ring grommet SU MOTORS, set of keys PN 5895A, and related PN series such as 5896, 5856, 7056, 7060, 7059, 7090, 7062A. The tender catalog lists 23 items with various PN references, signaling a comprehensive supply of shaft and bearing components. No published item quantities or estimated contract value are provided. A key differentiator is the requirement for OEM authorisation and ATC documents, with a mandatory option clause allowing up to 25% quantity increase at contracted rates. BPCL emphasizes compliance with their delivery rule framework and ATC submissions. This tender targets component-level supply for motor assemblies in Mumbai, aligning with BPCL's mechanical equipment refurbishment and spares provisioning.

  • Organization: Bharat Petroleum Corporation Ltd
  • Location: Mumbai, Maharashtra
  • Category: SHAFT/MOTOR SPARES including PN references across multiple sub-categories
  • Key differentiator: OEM Authorization Letter and extensive ATC/documentation requirements
  • Scope: 23 items spanning shafts, bushings, gaskets, sleeves, seals, nuts, O-rings, and keys
  • Delivery/quantities: 25% option clause; exact quantities not disclosed

Technical Specifications & Requirements

  • Product scope includes a broad set of mechanical spares for SU MOTORS:shaft coupling, mechanical seals (outer/inner), O ring grommet, set of keys, lower/upper/intermediate shafts, bushings (PN 5860, 7060, 7060A/B), sleeves (PN 7059, 7059B), gasket (PN 7090), nut for impeller (PN 7057), seal oil (7062A, 7084, 7094, 7094A), and shaft sleeves/pn 7059.
  • PN references indicate cross-category spares for motor assemblies; no performance metrics or ISO/IS standards are published.
  • Documentation requirements include OEM Authorization Letter, and ATC-related documents (ATC file referenced); no explicit technical deviation sheets or commercial deviations specified as required.
  • The tender design implies procurement of multiple SKUs with potential bulk or multi-line ordering aligned to 25% option clause.
  • Additional notes: BPCL reserves rights on quantity and delivery schedule per option clause; no explicit IS/BS/ISO standard cited in the data.

Terms, Conditions & Eligibility

  • EMD/ security: Not disclosed in the data provided.
  • Delivery terms: Delivery period rules exist but exact timelines are not specified; option clause enables up to 25% quantity variation at contracted rates.
  • Payment terms: Not specified in the available information.
  • Documents to submit:
    • OEM Authorization Letter
    • Nil commercial deviation sheet
    • Nil technical deviation sheet
    • ATC document
    • Holiday listing declaration
    • Land border declaration
  • Eligibility: OEM authorization and ATC documentation appear essential; no explicit turnover or experience thresholds stated in the data.
  • Penalties/warranty: Not detailed in the data provided. BPCL’s terms emphasize option mechanics and ATC compliance.

Key Specifications

  • Product scope: shaft coupling, mechanical seals (outer/inner), O ring grommet, keys, shafts (lower/upper/intermediate), bushings, sleeves, gaskets, nuts, and seal oils

  • PN references: 5895, 5895A, 5896, 5856, 5856A, 5856B, 7060, 7060A, 7060B, 7059, 7059B, 7056, 7057, 7090, 7094, 7094A, 7062A, 7084

  • Qty/Value: Not disclosed; 23 items total in BOQ

  • Standards: Not specified in tender data

  • Certifications: OEM authorisation required; ATC documentation

Terms & Conditions

  • Quantity variance up to 25% at contract values

  • OEM authorization and ATC documentation mandatory

  • Delivery timelines governed by BPCL terms; exact dates not provided

Important Clauses

Payment Terms

Not specified in the data; bidders should await BPCL standard payment terms within contract

Delivery Schedule

Delivery period aligned with original order; extension rules apply when option clause is exercised, calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in the data; BPCL terms may include penalties per standard procurement policy

Bidder Eligibility

  • Must furnish OEM Authorization Letter for supply of motor spares

  • Submit ATC-related declarations and documents

  • Compliance with BPCL option-clause delivery framework; readiness to accept 25% quantity variation

Advertisement

Tender Data

Bid Details

Quantity

50

Category

31.56.11.008.5 - SHAFT COUPLING SU MOTORS PN 5895

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

31.56.11.008.5 - SHAFT COUPLING SU MOTORS PN 5895 , 31.56.12.001.5 - MECHANICAL SEAL OUTER SU MOTORS , 31.56.12.002.5 - MECHANICAL SEAL INNER SU MOTORS , 31.56.12.005.5 - O RING GROMMET SU MOTORS , 31.56.11.009.5 - SET OF KEYS PN 5895A , 31.56.08.807.5 - SHAFT SINGLE SU MOTORS PN 5256 , 31.56.11.010.5 - SET OF SPLIT RING SU MOTORS PN 5896 , 31.20.87.010.5 - LOWER SHAFT PN 5856 SU MOTORS , 31.56.11.002.5 - INTERMEDIATE SHAFT SU MOTORS PN 5856A , 31.56.11.003.5 - UPPER SHAFT SU MOTORS PN 5856B , 31.56.11.007.5 - BUSH PN 5860 SU MOTORS , 31.56.06.095.5 - BUSH IN CASING SU MOTORS PN 7060 , 31.56.06.096.5 - BUSH SU MOTORS PN 7060 A , 31.56.06.097.5 - BUSH SU MOTORS PN 7060 B , 31.56.06.750.5 - SLEEVE SHAFT SU MOTORS PN 7059 , 31.56.06.751.5 - SLEEVE BEARING SU MOTORS PN 7059 B , 31.56.06.753.5 - LOWER SHAFT P N 7056 SU MOTORS , 31.56.06.754.5 - UPPER SHAFT P N 7056B SU MOTORS , 31.56.06.755.5 - SHAFT SLEEVE P N 7059 SU MOTORS , 31.56.06.241.5 - GASKET FOR CASING SU MOTORS PN 7090 , 31.56.06.476.5 - NUT FOR IMPELLER SU MOTORS PN 7057 , 31.56.06.726.5 - SHAFT SINGLE SU MOTORS PN 7056 , 31.56.06.745.5 - SEAL OIL SU MOTORS 7062A 7084 7094 7094A

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

28

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400071

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Yash Kanhaiyalal Chaudhari400071,BHARAT PETROLEUM CORPN LTD MUMBAI REFINERY , MAHUL , CHEMBURMumbai SuburbanMaharashtra400071428-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10005544.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 23 Items Sign in for GEM prices

#10

31.56.11.008.5 - SHAFT COUPLING SU MOTORS PN 5895

As per tender 1000462555

4 pc Delivery: 28 days
#20

31.56.12.001.5 - MECHANICAL SEAL OUTER SU MOTORS

As per tender 1000462555

1 st Delivery: 28 days
#30

31.56.12.002.5 - MECHANICAL SEAL INNER SU MOTORS

As per tender 1000462555

1 st Delivery: 28 days
#40

31.56.12.005.5 - O RING GROMMET SU MOTORS

As per tender 1000462555

2 st Delivery: 28 days
#50

31.56.11.009.5 - SET OF KEYS PN 5895A

As per tender 1000462555

2 st Delivery: 28 days
#60

31.56.08.807.5 - SHAFT SINGLE SU MOTORS PN 5256

As per tender 1000462555

1 pc Delivery: 28 days
#70

31.56.11.010.5 - SET OF SPLIT RING SU MOTORS PN 5896

As per tender 1000462555

2 st Delivery: 28 days
#80

31.20.87.010.5 - LOWER SHAFT PN 5856 SU MOTORS

As per tender 1000462555

1 pc Delivery: 28 days
#90

31.56.11.002.5 - INTERMEDIATE SHAFT SU MOTORS PN 5856A

As per tender 1000462555

1 pc Delivery: 28 days
#100

31.56.11.003.5 - UPPER SHAFT SU MOTORS PN 5856B

As per tender 1000462555

1 pc Delivery: 28 days
#110

31.56.11.007.5 - BUSH PN 5860 SU MOTORS

As per tender 1000462555

6 pc Delivery: 28 days
#120

31.56.06.095.5 - BUSH IN CASING SU MOTORS PN 7060

As per tender 1000462555

2 pc Delivery: 28 days
#130

31.56.06.096.5 - BUSH SU MOTORS PN 7060 A

As per tender 1000462555

2 pc Delivery: 28 days
#140

31.56.06.097.5 - BUSH SU MOTORS PN 7060 B

As per tender 1000462555

8 pc Delivery: 28 days
#150

31.56.06.750.5 - SLEEVE SHAFT SU MOTORS PN 7059

As per tender 1000462555

1 pc Delivery: 28 days
#160

31.56.06.751.5 - SLEEVE BEARING SU MOTORS PN 7059 B

As per tender 1000462555

6 pc Delivery: 28 days
#170

31.56.06.753.5 - LOWER SHAFT P N 7056 SU MOTORS

As per tender 1000462555

1 pc Delivery: 28 days
#180

31.56.06.754.5 - UPPER SHAFT P N 7056B SU MOTORS

As per tender 1000462555

1 pc Delivery: 28 days
#190

31.56.06.755.5 - SHAFT SLEEVE P N 7059 SU MOTORS

As per tender 1000462555

1 pc Delivery: 28 days
#200

31.56.06.241.5 - GASKET FOR CASING SU MOTORS PN 7090

As per tender 1000462555

2 pc Delivery: 28 days
#210

31.56.06.476.5 - NUT FOR IMPELLER SU MOTORS PN 7057

As per tender 1000462555

1 pc Delivery: 28 days
#220

31.56.06.726.5 - SHAFT SINGLE SU MOTORS PN 7056

As per tender 1000462555

1 pc Delivery: 28 days
#230

31.56.06.745.5 - SEAL OIL SU MOTORS 7062A 7084 7094 7094A

As per tender 1000462555

2 st Delivery: 28 days
Advertisement

Categories 42

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Letter

2

Nil commercial deviation sheet

3

Nil technical deviation sheet

4

ATC document

5

Holiday listing declaration

6

Land border declaration

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for BPCL shaft motor spares tender in Mumbai 2026?

Bidders must submit an OEM Authorization Letter along with ATC documents, holiday listing, and land border declarations. The tender allows up to 25% quantity variation at contracted rates; ensure readiness to supply PN references 5895, 5896, 7059, 7094, and related items. Include Nil deviation sheets for commercial and technical bids.

What documents are required for BPCL Mumbai motor parts tender 2026?

Submit OEM Authorization Letter, ATC document, holiday listing declaration, land border declaration, plus Nil commercial and Nil technical deviation sheets. Ensure GST/PAN and progressive financials are prepared if requested in BPCL guidelines, even though not explicitly listed here.

What items are included in the BPCL 2026 shaft motor spare parts tender?

The scope includes shaft coupling, mechanical seals (outer/inner), O ring grommet, set of keys, shaft sections (lower/upper/intermediate), bushings, gaskets, nuts for impeller, and sleeve bearings for SU MOTORS with PN references such as 5895, 5895A, 7060, 7059, 7090, 7094, among others.

What are the delivery terms for BPCL motor spares in Mumbai?

Delivery terms are governed by BPCL option clause permitting up to 25% quantity variation at contracted rates. The timing follows the original delivery period with extensions calculated as (increased quantity/original quantity) × original period, minimum 30 days.

What are the key eligibility criteria for BPCL tender bidders in Mumbai?

Key criteria include OEM authorization for motor spares and submission of ATC and border declarations. While turnover and years of experience are not specified in the data, bidders should align with BPCL procurement norms and provide complete documentation as listed.

What is required to demonstrate compliance for BPCL spares PN series procurement?

Demonstrate OEM authorization for PN series components (5895, 5896, 7059, 7094, etc.) and provide ATC compliance documents. Nil deviation sheets should accompany both commercial and technical bids, ensuring alignment with BPCL’s supplier evaluation framework.

How to prepare for BPCL Mumbai 2026 shaft motor parts submission?

Prepare OEM authorization, ATC files, and border declarations; compile 23-item PN-based spares list with exact part numbers. Attach Nil commercial/technical deviation sheets and holiday listing. Expect verification against OEM and ATC requirements, with delivery terms based on BPCL's option clause.

What standards or certifications are specified for BPCL spares tender?

No explicit standards (IS/ISO) are published in the tender data. The critical certification is OEM authorization; ensure all PN-based components meet manufacturer specifications and BPCL ATC requirements.

Advertisement