Bid Publish Date
21-Apr-2026, 7:28 pm
Bid End Date
09-May-2026, 8:00 pm
Location
Progress
Organization: Tubewell Division, under the Irrigation And Water Resources Department, Uttar Pradesh. Procuring earthing plates in the construction category for delivery at LUCKNOW, UTTAR PRADESH 226001. Tender scope lists essential product attributes (material, length, width, thickness) with no BOQ quantity published. No explicit estimated value or EMD disclosed. Tender terms include an option clause permitting up to 25% quantity variation and extended delivery timelines at contracted rates. Unique aspect is the focus on basic earthing plate fabrication/specification within a government irrigation framework, with standard procurement safeguards.
Earthing Plate (construction): material unspecified
Dimensions: Length, Width, Thickness exact values not disclosed
Delivery: Lucknow, UP 226001; terms allow quantity variation up to 25%
BOQ: No published items; focus on basic plate specification and compliance
ATC terms may require standard certifications and manufacturer qualifications
Option clause permits up to 25% more quantity during order and contract currency
Delivery period adjustments computed as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
EMD and payment terms not explicitly disclosed in available data
Payment terms are not disclosed in the provided data; bidders should verify ATC documents for exact terms and potential advance or milestone payments.
Delivery period may be extended based on option clause; additional time calculation follows specified formula with minimum 30 days.
Not specified in current data; bidders should refer to ATC for LD/penalty details if applicable.
Experience in supplying construction-grade earthing plates or related hardware
Compliance with organizational ATC terms and standard procurement requirements
Financial stability evidenced by recent financial statements
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ELITE GROUP Under PMA | Make : NA Model : AC 2 TON Title : Ac 2 Ton 5 star | 06-05-2026 19:16:23 | |
| 2 | ORCHID SUPPLIERS Under PMA | Make : Unbrand Model : ac 2 ton Title : Ac 2 Ton 5 star | 06-05-2026 19:53:35 | |
| 3 | SMART SOLUTION Under PMA | Make : NA Model : ac 2 ton Title : Ac 2 Ton 5 star | 07-05-2026 08:25:29 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ELITE GROUP Under PMA | Item Categories : Ac 2 Ton 5 star,Earthing Plate | |
| L2 | ORCHID SUPPLIERS Under PMA | Item Categories : Ac 2 Ton 5 star,Earthing Plate | |
| L3 | SMART SOLUTION Under PMA | Item Categories : Ac 2 Ton 5 star,Earthing Plate |
Quantity
11
Category
Earthing Plate
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
2
Past Performance
30 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Ac 2 Ton 5 star , Earthing Plate
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
09-May-2026, 2:30 pm
Opening Date
09-May-2026, 3:00 pm
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar earthing plate/construction projects
Financial statements demonstrating financial stability
EMD/Security deposit documentation (if applicable by buyer)
Technical bid documents demonstrating compliance with earthing plate specifications
OEM authorization or authorized dealer certificates (if applicable)
| Category | Specification | Requirement |
|---|---|---|
| Construction | Material of Earthing Plate | GI |
| Construction | Length of Plate | 1000.0 |
| Construction | Width of Plate | 200.0 |
| Construction | Thickness of Plate | 7.5, 10 Or higher |
Key insights about UTTAR PRADESH tender market
Bidders must submit GST registration, PAN, experience certificates for similar projects, financial statements, EMD documentation, and technical bid documents demonstrating compliance with earthing plate specifications. OEM authorizations may be required; refer to ATC for exact file formats and submission steps.
Register as a bidder with the Irrigation & Water Resources Department. Prepare GST, PAN, and experience certificates, along with financials and technical compliance. Ensure adherence to the option clause allowing up to 25% quantity variation and verify delivery terms in the ATC.
The tender specifies material, length, width and thickness of the earthing plate, all under construction category. Exact material composition, plate dimensions, and any IS or BIS certification are not disclosed here; bidders must consult the ATC document for full technical details.
EMD amount is not disclosed in the available data. Bidders should check the ATC terms for the exact EMD calculation, acceptable payment method (online/DD), and submission deadline to ensure compliance.
Delivery terms allow up to 25% quantity variation at contract award and during the currency, with a delivery period calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Extended delivery periods may apply per the option clause.
The tender references standardization requirements but does not list explicit standards in the provided data. Bidders should review the ATC for IS/BIS/ISO certifications, material compliance, and testing requirements to ensure ISI or equivalent approvals are met.
Specific submission deadlines are not provided here. Bidders must consult the official ATC document and the tender portal for the exact bid submission date, time, and online/offline submission instructions.
Eligibility includes demonstrated experience in supplying construction-grade plates, financial stability via recent statements, and compliance with GST/PAN requirements. OEM authorizations and technical certifications may be required per the ATC; ensure prior project experience aligns with government procurement standards.