Begusarai District Panchayats High Mast Lighting Tower LED Flood Lighting System Tender 2026 Bihar

Bid Publish Date

14-Aug-2026, 6:52 am

Bid End Date

24-Aug-2026, 9:00 am

Progress

Issue14-Aug-2026, 6:52 am
AwardPending

Key Highlights

  • Brand/OEM requirements if present
  • Technical certifications or standards explicitly required
  • Unique conditions: 25% quantity variation, extended delivery terms
  • Critical eligibility criteria: experience, turnover, certifications

Tender Overview

Organization: Begusarai District Panchayats (Department of Panchayati Raj) seeks a High Mast Lighting Tower for large area with LED Flood Lighting System in Bihar. The project scope references a Q3 category, with no BOQ items listed and an absence of explicit start/end dates. A key buyer clause grants the Purchaser the right to adjust quantity by up to 25% of the bid quantity at award and during the contract, with delivery time recalculated accordingly. The tender emphasizes single or multiple supplier arrangements at contracted rates and extended delivery windows should the option clause be invoked. This procurement targets robust outdoor illumination for large spaces, leveraging LED flood technology to ensure energy efficiency and uniform coverage.

Technical Specifications & Requirements

  • Product category: High Mast Lighting Tower with LED Flood Lighting System for large area.
  • Quantity flexibility: up to 25% quantity variation at contract placement and during contract currency.
  • Delivery timing: calculated from last date of original delivery order; minimum extension baseline is 30 days if additional time is needed; extension mechanics follow the option clause.
  • No technical specifications or exact standards are provided in the tender data.
  • There is an absence of BOQ items and an unclear estimated value or EMD in the available information.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% and adjust delivery timelines accordingly.
  • Delivery period applies from the last date of the original delivery order; extended delivery follows the same proportional formula.
  • All other typical terms (EMD, eligibility criteria, payment terms, warranties) are not specified in the provided data and must be clarified during tender clarification.
  • Bidders should seek confirmation on EMD amount, payment terms, warranty, and service support post-installation.

Key Specifications

  • Product/service names: High Mast Lighting Tower with LED Flood Lighting System

  • Quantities: up to 25% quantity variation permitted

  • EMD/Estimated value: Not specified in data provided

  • Experience requirements: Not specified; bidder should confirm prior exposure to outdoor LED lighting projects

  • Quality/Compliance: No explicit standards mentioned in provided data

Terms & Conditions

  • Quantity fluctuation up to 25% with extended delivery implications

  • Delivery period starts from the last date of original delivery order

  • Clarifications required on EMD, payment terms, and warranty

Important Clauses

Payment Terms

Not specified in the tender data; bidders to seek clarification

Delivery Schedule

Delivery duration aligned to original delivery order; adjustments via option clause with minimum 30 days extension

Penalties/Liquidated Damages

Not specified; bidders should inquire during bid kickoff

Bidder Eligibility

  • Experience in supplying high mast lighting or LED flood lighting systems

  • Financial stability evidenced by turnover documentation

  • Compliance with GST, PAN, and OEM authorization requirements

Authority & Contact

Office Name

Begusarai

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

High Mast Lighting Tower for large area with LED Flood Lighting System (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Begusarai

Delivery Pincodes

848204

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Priya Kumari848204,AT- EJANI PS- CHHAURAHI BLOCK- CHHAURAHI DIST- BEGUSARAIBegusaraiBihar848204115-

Authority Records

PANCHAYATI RAJ DEPARTMENTDISTRICT PANCHAYATS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-9754910.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 5

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar high mast lighting projects

4

Financial statements or turnover proof

5

EMD/Security deposit documentation

6

Technical bid documents and any OEM authorizations

7

Any product compliance certificates or manufacturer specifications

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for Begusarai lighting tender in Bihar 2026?

Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD documents, technical bid, and OEM authorizations. The purchaser permits quantity variation up to 25% and extended delivery as per the option clause. Clarify EMD amount, payment terms, and warranty at pre-bid. Ensure LED flood lighting system specifications meet project needs.

What documents are required for high mast lighting tender in Begusarai?

Required documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD security, technical bid, and OEM authorizations. Ensure submission aligns with tender terms and clarifications, and provide installation and maintenance capability details if asked.

What are the delivery terms for the Begusarai lighting contract?

Delivery starts from the last date of the original delivery order. If quantity increases, delivery time scales using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend the period within contract limits.

What are the EMD requirements for this Bihar lighting tender?

EMD amount is not specified in the provided data. Bidders should obtain clarification during the pre-bid meeting or tender clarification. Prepare standard EMD payment via demand draft or online as per purchasing agency guidelines.

What standards apply to the LED flood lighting system in this bid?

No explicit standards are listed in the data. Bidders should confirm whether ISI, IS 550, or ISO certifications are required during bid clarifications and provide certifications with the technical bid if requested.

What is the scope of quantity variation in this lighting tender?

The purchaser reserves the right to vary quantity up to 25% of bid quantity at contract award and during the currency of the contract. Adjusted delivery time is calculated proportionally, with a minimum extension of 30 days.

How to verify eligibility criteria for Begusarai lighting procurement?

Eligibility requires prior experience in similar projects, valid GST and PAN, financial documents demonstrating stability, and any OEM authorizations. Verify if the bidder has installed LED flood lighting towers and can provide warranty and after-sales support as per tender terms.

When is the bid clarification expected for this Bihar tender?

A clarification window is typically offered before bid submission; bidders should participate in the pre-bid or reach out to the procurement official for explicit dates, EMD guidance, and delivery expectations for the high mast lighting project.