TenderDekho Logo
GEM

Open Tender for SITC of 16KVA AVRS at Rawalpir and Dhuvav,Spare control card,Spare Variac,Spare AC step Synchro mot in KACHCHH, GUJARAT

Bid Publish Date

10-Nov-2025, 4:46 pm

Bid End Date

15-Dec-2025, 2:00 pm

EMD

₹18,500

Value

₹9,18,340

Generate Docs

Progress

Issue10-Nov-2025, 4:46 pm
Corrigendum04-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

50

Category

SITC of 16KVA AVRS at Rawalpir and Dhuvav

Bid Type

Two Packet Bid

Categories 43

Directorate General Of Lighthouses And Lightships invites bids for SITC of 16KVA AVRS at Rawalpir and Dhuvav, Spare control card, Spare Variac, Spare AC step Synchro motor, Spare power transformer, Spare SPD, Spare Brush set, 6Sq. mmx4C copper flexible sheathed FRLSH cable, Miscellaneous items in KACHCHH, GUJARAT. Quantity: 50. Submission Deadline: 15-12-2025 14: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SITC of 16KVA AVRS at Rawalpir and Dhuvav , Spare control card , Spare Variac , Spare AC step Synchro motor , Spare power transformer , Spare SPD , Spare Brush set , 6Sq.mmx4C copper flexible sheathed FRLSH cable , Miscellaneous items

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYSDIRECTORATE GENERAL OF LIGHTHOUSES AND LIGHTSHIPS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8569332.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

SITC of 16KVA AVRS at Rawalpir and Dhuvav

Supply, installation, testing and commissioning of Servo Motor Controlled Automatic Voltage Stabilizer, Capacity 16KVA for each phase. 01 set each , 01 set comprises of 03 units, 01 unit for each phasefor Dhuvav RCS and Rawalpir Lighthouse and 01 set ,03 units spare.

3 set Delivery: 45 days
#2

Spare control card

Spare Main Control card with display, 01 set means 03 units, 01 unit for each phase

1 set Delivery: 45 days
#3

Spare Variac

Spare Variac, 01 set means 03 units, 01 unit for each phase

1 set Delivery: 45 days
#4

Spare AC step Synchro motor

Spare AC step Synchro Motor with RC network, 01 set means 03 units, 01 unit for each phase

1 set Delivery: 45 days
#5

Spare power transformer

Spare Power Transformer, Step Down Supply for Control Card, 01 set means 03 units, 01 unit for each phase

1 set Delivery: 45 days
#6

Spare SPD

Spare Surge Protection Device, 01 set means 03 units, 01 unit for each phase

1 set Delivery: 45 days
#7

Spare Brush set

Spare Brush set, 01 set means 03 units, 01 unit for each phase

1 set Delivery: 45 days
#8

6Sq.mmx4C copper flexible sheathed FRLSH cable

Supply and installation of 6Sq.mmx4C copper flexible sheathed FRLSH cable for input, output connection, 20 mtrs for Rawalpir and 20 mtrs for Dhuvav

40 meters Delivery: 45 days
#9

Miscellaneous items

Miscellaneous items required for installation of AVR at Rawalpir and Dhuvav, 6Sq.mmx1C green wire for earthing 20Mtr, 6Sq.mm Round Copper lugs, 8mm PVC sleeve, 20 or 25mm PVC reinforced corrugated pipe, PVC tape, Red , Yellow, Blue,Black,Green, 25mm cotton tape, cable tie 250mm, clamps and SS Screw etc. to complete the work in all respect

1 lumpsum Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

04-Dec-2025

Extended Deadline

15-Dec-2025, 2:00 pm

Opening Date

15-Dec-2025, 2:30 pm

#2

Update

01-Dec-2025

Extended Deadline

04-Dec-2025, 5:00 pm

Opening Date

04-Dec-2025, 5:30 pm