TenderDekho Logo
Closed GEM

Tender Notice for ANPR 4MP,8 CHANNEL NVR,6 TB HDD,43 INCH LED DISPLAY,4 PORT POE SWITH,POE METAL RACK,MEDIA CONVERTOR in NEW DELHI, DELHI

Bid Publish Date

28-Aug-2026, 2:31 pm

Bid End Date

07-Sep-2026, 3:00 pm

EMD

₹20,000

Location

NEW DELHI , DELHI

Progress

Issue28-Aug-2026, 2:31 pm
AwardPending

Indian Army has released a public tender for ANPR 4MP, 8 CHANNEL NVR, 6 TB HDD, 43 INCH LED DISPLAY, 4 PORT POE SWITH, POE METAL RACK, MEDIA CONVERTOR, 6 U NETWORKING RACK, CAT 6 WIRE, 12 CORE OFC, POWER CABLE 2 CORE X 65 SQMM, PVC CONDUIT PIPE, MEISCELLANEOUS ELECTRIC FITTING CONNECTORS ETC, INSTALLATION AND COMMISSIONING OF THE CCTV CAMERAS AND ITS NEW SIFTING ROOM in NEW DELHI, DELHI. Quantity: 1731. Submission Deadline: 07-09-2026 15: 00: 00. Download documents and apply online.

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1731

Category

ANPR 4MP

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

2

Past Performance

40 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

ANPR 4MP , 8 CHANNEL NVR , 6 TB HDD , 43 INCH LED DISPLAY , 4 PORT POE SWITH , POE METAL RACK , MEDIA CONVERTOR , 6 U NETWORKING RACK , CAT 6 WIRE , 12 CORE OFC , POWER CABLE 2 CORE X 65 SQMM , PVC CONDUIT PIPE , MEISCELLANEOUS ELECTRIC FITTING CONNECTORS ETC , INSTALLATION AND COMMISSIONING OF THE CCTV CAMERAS AND ITS NEW SIFTING ROOM

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

NEW DELHI

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NEW DELHINEW DELHI--245-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9648718.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

ANPR 4MP

ANPR 4MP

2 nos Delivery: 45 days
#2

8 CHANNEL NVR

8 CHANNEL NVR

1 nos Delivery: 45 days
#3

6 TB HDD

6 TB HDD

2 nos Delivery: 45 days
#4

43 INCH LED DISPLAY

43 INCH LED DISPLAY

1 nos Delivery: 45 days
#5

4 PORT POE SWITH

4 PORT POE SWITH

2 nos Delivery: 45 days
#6

POE METAL RACK

POE METAL RACK

2 nos Delivery: 45 days
#7

MEDIA CONVERTOR

MEDIA CONVERTOR

4 pair Delivery: 45 days
#8

6 U NETWORKING RACK

6 U NETWORKING RACK

1 nos Delivery: 45 days
#9

CAT 6 WIRE

CAT 6 WIRE

1 box Delivery: 45 days
#10

12 CORE OFC

12 CORE OFC

1,200 mtr Delivery: 45 days
#11

POWER CABLE 2 CORE X 65 SQMM

POWER CABLE 2 CORE X 65 SQMM

500 mtr Delivery: 45 days
#12

PVC CONDUIT PIPE

PVC CONDUIT PIPE

13 bundle Delivery: 45 days
#13

MEISCELLANEOUS ELECTRIC FITTING CONNECTORS ETC

MEISCELLANEOUS ELECTRIC FITTING CONNECTORS ETC

1 as per requirement Delivery: 45 days
#14

INSTALLATION AND COMMISSIONING OF THE CCTV CAMERAS AND ITS NEW SIFTING ROOM

INSTALLATION AND COMMISSIONING OF THE CCTV CAMERAS AND ITS NEW SIFTING ROOM

1 job Delivery: 45 days

Categories 29

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer