TenderDekho Logo
Active GEM

Indian Army Polo Simulator with Fence Ball Delivery Tender Uttarakhand 2026 - 3-Year Warranty, 25% Quantity Option, AMC 1%/yr

Bid Publish Date

31-Oct-2026, 5:56 pm

Bid End Date

10-Nov-2026, 6:00 pm

Progress

Issue31-Oct-2026, 5:56 pm
AwardPending

Key Highlights

  • • Vendor must confirm a registered Indian office for imported polo simulator OEM after-sales support
  • • AMC option: 4 years at an annual rate not exceeding 1% of contract price, with performance security implications
  • • 3-year warranty from final acceptance; OEM warranty certificates required at delivery
  • • Quantity variation allowed up to 25% during contract and currency extension periods

Tender Overview

The Indian Army (Department Of Military Affairs) invites bids for a Polo simulator with fence ball delivery, to be supplied and commissioned at Uttarakhand (244711). The contract scope includes supply, installation, testing, commissioning, and operator training, with statutory clearances if required. A key differentiator is the option clause allowing up to 25% quantity variation at contracted rates, and a delivery period linked to original timelines plus a minimum 30-day cushion. The winner must provide OEM-backed after-sales support for India, and an AMC post-warranty period. The tender emphasizes on-site warranty, 3-year product warranty, and a structured 4-year AMC at a cap of 1% of contract price annually. Unique terms include performance security adjustments tied to AMC acceptance and forfeiture risks if AMC is not pursued. Location and purpose reflect a defense-scale polo training solution with installation at the consignee location.

  • Organization: Indian Army (Department Of Military Affairs)
  • Product/Service: Polo simulator with fence ball delivery (supply, installation, testing, commissioning, operator training)
  • Location: Uttarakhand, 244711
  • Estimated Value/EMD: Not disclosed; scope includes warranty, AMC, and installation
  • Delivery/Scope: On-site installation, training, any required statutory clearances, and long-term maintenance options
  • Key Differentiator: 25% quantity option, post-warranty AMC at 1% annually

Technical Specifications & Requirements

  • Scope of Supply: Supply, Installation, Testing, Commissioning of polo simulator with fence ball delivery; operator training; statutory clearances (if any)
  • OEM/Support: Imported products require an Indian-registered OEM/authorized seller with after-sales service in India
  • Warranty: 3-year warranty from final acceptance; OEM certificates required at delivery; breakdown rectification during warranty
  • AMC: 4-year AMC post-warranty at rate not more than 1% of contract price per annum; AMC acceptance triggers performance security adjustments; 2% AMC performance security valid through AMC period plus 2 months
  • Delivery Terms: Option to extend delivery period via calculated extension formula; minimum 30 days extension if needed
  • ATC/ATC Document: Upload of OEM/ATC confirmation and undertaking to provide AMC
  • Delivery Location: Consignee location in Uttarakhand; installation and testing included

Terms, Conditions & Eligibility

  • EMD/Bid Security: Not disclosed in data; bidders must satisfy standard EMD/guarantee terms per ATC
  • Delivery Timeline: Delivery period as per original order with option adjustments; extended timeframe governed by the option clause
  • Warranty & AMC: 3-year product warranty; optional 4-year AMC at <=1% annual contract price; performance security adjustments linked to AMC acceptance
  • Pricing Scope: Bid price includes supply, installation, testing, commissioning, and operator training; all statutory clearances if applicable
  • OEM/Service: Imported items require registered Indian office for after-sales; submit proof
  • Documentation: Technical compliance certificates, OEM authorizations, warranty certificates, and AMC undertakings to be submitted with bid
  • Penalties/Contracts: Performance security return linked to AMC compliance; extension clauses subject to contract terms

Key Specifications

  • Product: Polo simulator with fence ball delivery

  • Warranty: 3 years from final acceptance

  • AMC: 4 years at <= 1% of contract price per annum

  • Delivery: On-site installation at consignee location in Uttarakhand

  • Option Clause: Up to 25% quantity variation during and after contract

Terms & Conditions

  • Option for 25% quantity variation at contracted rates

  • 3-year warranty with 4-year AMC at 1% annual rate

  • OEM-backed after-sales support in India with required certifications

Important Clauses

Payment Terms

Payment terms tied to delivery milestones and AMC acceptance; performance security adjustments post-warranty

Delivery Schedule

Delivery period follows original timeline with potential extension via option clause; minimum 30 days extended time when applicable

Penalties/Liquidated Damages

Penalties applicable for late delivery or non-compliance; performance security tied to AMC acceptance

Bidder Eligibility

  • Must have prior experience in supplying defense-grade simulators or similar training equipment

  • Must demonstrate GST registration and financial stability

  • Must provide OEM authorization and Indian after-sales service capability

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

4 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Polo simulator with fence ball delivery

Advisory Bank

State Bank of India

ePBG Percentage

0.5%

ePBG Duration (Months)

38

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

UDHAM SINGH NAGAR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-UDHAM SINGH NAGARUDHAM SINGH NAGAR--130-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10013587.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar polo simulator projects

4

Financial statements or turnover documentation

5

EMD/Security deposit submission proof

6

Technical bid documents and OEM authorizations

7

OEM/Authorised seller confirmation for after-sales service in India

8

Warranty certificates from OEM

9

AMC undertaking and performance security arrangements

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for the polo simulator tender in Uttarakhand 2026?

Bidders must submit GST, PAN, financials, experience certificates, OEM authorizations, and EMD as per ATC. Provide technical compliance and warranty certificates, ensure Indian OEM support for imported items, and include AMC undertaking. The bid covers supply, installation, testing, commissioning, operator training, and statutory clearances if required. Ensure option clause compliance for quantity variation up to 25%.

What documents are required for the polo simulator procurement bid 2026?

Required documents include GST registration, PAN card, experience certificates for similar projects, financial statements, EMD proof, technical bid, OEM authorization, and proof of Indian after-sales service for imported items. Also include OEM warranty certificates and an AMC undertaking with performance security details to be uploaded.

What are the warranty and AMC requirements for this defense tender?

The product carries a 3-year warranty from final acceptance. An optional 4-year AMC is available at a rate not exceeding 1% of contract price per year. Performance security may be adjusted upon AMC acceptance; AMC payments occur annually after service delivery. Warranty certificates must accompany delivery.

What is the quantity variation provision for this polo simulator contract?

The purchaser may increase or decrease the quantity up to 25% of the bid quantity at contracted rates. During currency, the same option may extend quantities up to 25% with time adjustments based on the original delivery period, subject to a minimum of 30 days.

What is required for OEM support if the product is imported?

Imported items must have an OEM or authorized seller with a registered office in India to provide after-sales service. Submit a certificate of registration and confirm Indian after-sales support as part of the bid, along with OEM warranty certificates.

When is the delivery period and how are extensions calculated?

Delivery starts from the last date of the original delivery order. If extended, the additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. The purchaser may extend up to the original delivery period during option exercise.

What are the key terms for payment and penalties in this tender?

Payment terms align with delivery milestones and AMC acceptance. A performance security system applies, with potential forfeiture if AMC is not pursued. Late delivery or non-compliance may trigger penalties as per the contract; ensure submission of all required documents to avoid non-payment.

What certifications or standards are required for compliance?

Bidders must provide OEM warranties and ensure Indian after-sales support. While IS/ISD standards are not specified in data, ensure compliance with standard defense procurement documentation, and attach any applicable warranty, OEM authorization, and service-certification documents to strengthen the bid.

Advertisement