GEM

Procurement Opportunity: Automated HPLC System for Separation of complex mixtures in NEW DELHI, DELHI

Posted

28 Oct 2025, 11:02 am

Deadline

18 Nov 2025, 11:00 am

EMD

₹2,00,000

Progress

Issue28 Oct 2025, 11:02 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 5

Indian Council Of Agricultural Research (icar) invites bids for Automated HPLC System for Separation of complex mixtures (Q3) in NEW DELHI, DELHI. Quantity: 1. Submission Deadline: 18-11-2025 11: 00: 00. Submit your proposal before the deadline.

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Standard parameter Instrument calibration standards IEC 17025
Quaternary Gradient Solvent Delivery Unit with Degassing Unit Components of unit Quaternary Low-Pressure Gradient pump& Parallel Double Plunger, Quaternary Low Pressure Gradient pump & Serial Double Plunger
Quaternary Gradient Solvent Delivery Unit with Degassing Unit Number of solvents delivery 4
Quaternary Gradient Solvent Delivery Unit with Degassing Unit Flow rate setting range in ml/min 0.001 to 10
Quaternary Gradient Solvent Delivery Unit with Degassing Unit Flow rate accuracy ± 1 %, ± 1 % or better
UV-Vis Detector UV-Vis Detector provided Yes Or higher
UV-Vis Detector Light source Deuterium lamp, NA if not provided, Tungsten Lamp
UV-Vis Detector Spectrum Band width in nm 4, 8
UV-Vis Detector Wavelength range in nm 190 - 700
UV-Vis Detector Sampling Rate in Hz 80, 90, 100, NA if not provided
UV-Vis Detector The flow cell must be temperature Controlled Yes
UV-Vis Detector Wavelength accuracy in nm ± 1
UV-Vis Detector Wavelength reproducibility in nm ± 0.1
UV-Vis Detector Drift in AU/Hour less than 1 x 10-4
UV-Vis Detector Noise level in AU ± 2.5 x 10-6, ±5 x 10-6
UV-Vis Detector Ability to monitor and quantitative 2 wavelengths simultaneously Yes
UV-Vis Detector Linearity in AU 2.5 or more, NA if not provided
UV-Vis Detector Temperature control provided for Flow cell Yes
UV-Vis Detector Temperature control range for flow cell in Degree Celsius 5 degree above room temp to 50 degree, NA if not provided
UV-Vis Detector flow cell path length in mm 10, NA if not provided
UV-Vis Detector Flow cell volume in ?l 10 - 15, NA if not provided, 16 - 20
Auto Sample Injector with cooler Injection Method Total volume sample injection
Auto Sample Injector with cooler Carry over of sample 0.005% or lower
Auto Sample Injector with cooler Injection precision in RSD less than 0.50 % RSD
Software Operating Windows Win 10 or latest
Photo Diode Array (PDA) Detector Provision of Photo diode array Yes, No Or higher
Photo Diode Array (PDA) Detector PDA detector Wavelength range in nm 190- 800 or better, NA if not provided
Photo Diode Array (PDA) Detector Number of Diodes 512, 1024, NA if not provided
Photo Diode Array (PDA) Detector PDA detector light source Deuterium lamp and Tungsten lamp
Photo Diode Array (PDA) Detector PDA detector Wavelength accuracy in nm ± 1
Photo Diode Array (PDA) Detector Data Rate in Hz 100, NA if not provided, <100
Photo Diode Array (PDA) Detector Noise in AU less than ± 0.6 x 10-5 or lower, NA if not provided, less than ± 1 x 10-5 or lower
Photo Diode Array (PDA) Detector PDA detector Drift in AU/Hour less than 1 x 10-4, NA if not provided, less than 1 x 10-3
Photo Diode Array (PDA) Detector Temperature controlled flow cell in C 5 degree above room temp to 50 degree, NA if not provided
Photo Diode Array (PDA) Detector Flow cell Flow cell, NA if not provided
Warranty & Reports Warranty (Option of comprehensive warranty is available through bidding only, which if opted will supersede normal warranty in the catalogue) 2, 3, 4, 5 Or higher
Warranty & Reports Number of installations in Central /State/PSU Govt Hospitals <3, >3
Warranty & Reports Availability of toll free facility for technical support maintained by OEM or authorized agencies Yes Or higher

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer