TenderDekho Logo
Closed GEM

Open Tender for HP PIPE,SHAFT ASSY STEERING,HOSE FRONT FLEXIBLE,KIT OF AC LINES FOR DUAL AC,PULL CABLE ACCELERATOR, in LALITPUR, UTTAR PRADESH

Bid Publish Date

31-May-2025, 7:25 pm

Bid End Date

21-Jun-2025, 8:00 pm

Progress

Issue31-May-2025, 7:25 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

13

Category

HP PIPE

Bid Type

Single Packet Bid

Categories 18

Indian Army invites bids for HP PIPE, SHAFT ASSY STEERING, HOSE FRONT FLEXIBLE, KIT OF AC LINES FOR DUAL AC, PULL CABLE ACCELERATOR, ASSY CLUTCH MASTER CYLINDER, HOSE HEATER UNITS TO INLET PIPE, FAN BELT ENGINE, REPAIR KIT, MINIATURE RELAY 1NO 1NC MS TYCO AIR CON, VANE PUMP ASSY in LALITPUR, UTTAR PRADESH. Quantity: 13. Submission Deadline: 21-06-2025 20: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

HP PIPE , SHAFT ASSY STEERING , HOSE FRONT FLEXIBLE , KIT OF AC LINES FOR DUAL AC , PULL CABLE ACCELERATOR , ASSY CLUTCH MASTER CYLINDER , HOSE HEATER UNITS TO INLET PIPE , FAN BELT ENGINE , REPAIR KIT , MINIATURE RELAY 1NO 1NC MS TYCO AIR CON , VANE PUMP ASSY

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7913690.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

HP PIPE

HP PIPE

1 pieces Delivery: 15 days
#2

SHAFT ASSY STEERING

SHAFT ASSY STEERING

1 pieces Delivery: 15 days
#3

HOSE FRONT FLEXIBLE

HOSE FRONT FLEXIBLE

1 pieces Delivery: 15 days
#4

KIT OF AC LINES FOR DUAL AC

KIT OF AC LINES FOR DUAL AC

2 pieces Delivery: 15 days
#5

PULL CABLE ACCELERATOR

PULL CABLE ACCELERATOR

1 pieces Delivery: 15 days
#6

ASSY CLUTCH MASTER CYLINDER

ASSY CLUTCH MASTER CYLINDER

1 pieces Delivery: 15 days
#7

HOSE HEATER UNITS TO INLET PIPE

HOSE HEATER UNITS TO INLET PIPE

1 pieces Delivery: 15 days
#8

FAN BELT ENGINE

FAN BELT ENGINE

1 pieces Delivery: 15 days
#9

REPAIR KIT

REPAIR KIT

1 pieces Delivery: 15 days
#10

MINIATURE RELAY 1NO 1NC MS TYCO AIR CON

MINIATURE RELAY 1NO 1NC MS TYCO AIR CON

2 pieces Delivery: 15 days
#11

VANE PUMP ASSY

VANE PUMP ASSY

1 pieces Delivery: 15 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Financial Results

Rank Seller Price Item
L1
HINDUSTAN TRADING CORPORATION(MSE)( MSE Social Category:General )    Under PMA
Item Categories : HP PIPE,SHAFT ASSY STEERING,HOSE FRONT FLEXIBLE,KIT OF AC LINES FOR DUAL AC,PULL CABLE ACCELERATOR,
L2
PRATEEK MOTORS   Under PMA
Item Categories : HP PIPE,SHAFT ASSY STEERING,HOSE FRONT FLEXIBLE,KIT OF AC LINES FOR DUAL AC,PULL CABLE ACCELERATOR,
L3
Gayatri Enterprises   Under PMA
Item Categories : HP PIPE,SHAFT ASSY STEERING,HOSE FRONT FLEXIBLE,KIT OF AC LINES FOR DUAL AC,PULL CABLE ACCELERATOR,

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What are the eligibility requirements for the tender?

The eligibility requirements include being a registered entity with experience in supplying automotive parts to military or government sectors. Bidders must provide proof of previous contracts completed successfully, ensuring a strong capability to meet the tender requirements.

What kind of technical specifications should be adhered to?

Bidders must comply with specified technical specifications which include adhering to industry standards for automotive parts, including materials used, quality benchmarks, and durability tests. Compliance documentation must be submitted alongside bids for evaluation.

What financial documentation is required for submission?

Bidders must include a detailed financial breakdown in their submissions outlining their pricing strategies. This should encompass all pertinent costs, including taxes, ensuring transparency and compliance with financial requirements outlined in the tender.

What submission methods are accepted for the tender?

Submissions must be made electronically through the designated tender portal. Bidders should ensure that all documents are correctly formatted and uploaded before the submission deadline to avoid any disqualification.

Are there any special provisions for MSEs and startups?

Yes, there are specific benefits for Micro, Small, and Medium Enterprises (MSEs), which include preferential treatment in evaluation scoring. Startups may also find relaxed eligibility criteria, promoting innovation and inclusivity in the tendering process. Compliance with 'Make in India' policies is central to these provisions.