Custom Bid for Services - 200143613 Overhauling of ESP at NTPC Barh Stage-1 & Stage II 660MW Units
Ntpc Limited
NALANDA, BIHAR
Bid Publish Date
04-Jun-2026, 11:54 am
Bid End Date
15-Jun-2026, 11:00 am
EMD
₹50,000
Value
₹30,94,742
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
NTPC Limited invites bids for the Overhauling of TWS of CW pump of stage-II at NTPC SSTPS. Estimated value is ₹3,094,742 with an EMD of ₹50,000. The procurement location is NTPC SSTPS; the scope is maintenance-focused rather than supply of new equipment. There are no BOQ items listed and no explicit technical specifications in the available data. The tender emphasizes adherence to Buyer Added Terms and ATCs, indicating a structured service contract for complex pump maintenance. The unique aspect is the absence of itemized BOQ data, suggesting a fixed-scope intervention defined by internal CN/ATC guidance.
Overhauling service for TWS CW pump stage-II
Estimated contract value: ₹3,094,742
EMD: ₹50,000
Delivery scope governed by ATC/SLA (no public detailed specs)
No BOQ items listed; rely on internal technical attachments
EMD of ₹50,000 required for bid submission
Scope defined via ATC/SLA attachments; review mandatory
No public technical specifications; rely on ATC documents
Payment terms are defined in the Buyer Added ATC/SLA attachments; public data does not specify milestones
Delivery/execution timeline is specified in ATC/SLA; not disclosed in public Tender data
LD/penalty details to be confirmed in SLA; refer to buyer attachments for specifics
Experience in overhauling or maintenance of turbine/water pump systems
Ability to comply with NTPC SSTPS site-specific safety and quality norms
Compliance with GST and financial stability documentation as per ATC
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - 200150473 Overhauling of TWS of CW pump of stage-II at NTPC SSTPS
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
SCOPE_OF_WORK
PAYMENT
BOQ
OTHER
OTHER
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Ntpc Limited
NALANDA, BIHAR
Ntpc Limited
SONBHADRA, UTTAR PRADESH
Ntpc Limited
SONBHADRA, UTTAR PRADESH
Ntpc Limited
SONBHADRA, UTTAR PRADESH
Ntpc Limited
SOLAPUR, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Pan card
Experience certificates for similar pump overhauling projects
Financial statements or turnover proof
EMD deposit receipt or online payment confirmation
Technical bid documents as per ATC
OEM authorizations or service partner certifications (if required by ATC)
Any other documents specified in Buyer Added Terms and SLA attachments
Bidders must submit the EMD of ₹50,000 and comply with Buyer Added Terms. Review the ATC/SLA for technical requirements, site safety norms, and payment milestones. Ensure GST, PAN, and experience certificates are ready; submit technical bid per ATC attachments and OEM authorizations if required.
Required documents include GST certificate, PAN card, experience certificates for pump maintenance, financial statements, EMD receipt, and technical bid per ATC. OEM authorizations may be needed; ensure SLA attachments are acknowledged and signed.
The Earnest Money Deposit is ₹50,000. Submit via online payment or DD as specified in ATC; ensure EMD validity as per tender terms and attach payment proof with the bid.
Public data lacks detailed pump specs; consult the ATC/SLA attachments for exact maintenance scope, required procedures, and testing standards. Expect scope to cover disassembly, inspection, reassembly, and functional testing per NTPC site guidelines.
Specific delivery schedule is defined in the ATC/SLA attachments, not in public tender data. bidders should review the SLA for milestones, site access, and downtime allowances before bidding.
No public standard is listed; ATC/SLA will specify standards or OEM qualifications. Vendors should confirm ISI/ISO requirements if included in attachments and ensure relevant maintenance certifications are in place.
Check experience in similar pump/TWS overhauling projects, submit relevant certificates, and ensure financial stability. Eligibility depends on ATC-defined criteria, site safety compliance, and availability of required OEM authorizations if mandated.
Payment terms are described in the ATC/SLA attachments; typical arrangements include milestone-based payments post-service inspection and acceptance. Verify whether advances are allowed and the timeline for final payment within the SLA.
Ntpc Limited
📍 NALANDA, BIHAR
Ntpc Limited
📍 AURAIYA, UTTAR PRADESH
Ntpc Limited
📍 SONBHADRA, UTTAR PRADESH
Ntpc Limited
📍 Raigarh, CHHATTISGARH
Ntpc Limited
📍 Narsinghpur, MADHYA PRADESH
Sign up now to access all documents
Main Document
OTHER
SCOPE_OF_WORK
PAYMENT
BOQ
OTHER
OTHER
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS