TenderDekho Logo
Active GEM

Procurement Opportunity: SUPPLY AND INSTALLATION OF 40 KVA ONLINE UPS WITH BATTARIES,SUPPLY AND INSTALLATION OF SURFACE SUB in NILGIRIS, TAMIL NADU

Bid Publish Date

16-Oct-2026, 3:32 pm

Bid End Date

26-Oct-2026, 4:00 pm

EMD

₹2,50,000

Location

NILGIRIS , TAMIL NADU

Progress

Issue16-Oct-2026, 3:32 pm
AwardPending

Indian Army has released a public tender for SUPPLY AND INSTALLATION OF 40 KVA ONLINE UPS WITH BATTARIES, SUPPLY AND INSTALLATION OF SURFACE SUB MAIN WIRING ALONGWITH EARTH WIRE, SUPPLY AND INSTALLATION OF VERTICAL LOAD LINE DISTRIBUTION BOARD, SUPPLY AND INSTALLATION OF MCCB 4 POLE 16 KA 415 V 125 A, SUPPLY AND INSTALLATION OF MCB 3 POLE 2 10 KA 415 V 25 TO 63 A, SUPPLY AND INSTALLATION OF LOAD CHANGE OVER SWITCH 4 POLE 3 TO 7 KA 415 V 125A, SUPPLY AND INSTALLATION OF COPPER BONDED STEEL EARTH ROD 3, SUPPLY AND INSTALLATION OF COPPER BONDED STEEL ROUND CONDUCTOR, SUPPLY AND INSTALLATION OF COMMON BUS BAR FOR EARTH CONNECTION in NILGIRIS, TAMIL NADU. Quantity: 822. Submission Deadline: 26-10-2026 16: 00: 00. Download documents and apply online.

Advertisement

Tender Data

Bid Details

Quantity

822

Category

SUPPLY AND INSTALLATION OF 40 KVA ONLINE UPS WITH BATTARIES

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

69

OEM Avg. Turnover

550

Past Performance

50 %

Warranty Period

3 days

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SUPPLY AND INSTALLATION OF 40 KVA ONLINE UPS WITH BATTARIES , SUPPLY AND INSTALLATION OF SURFACE SUB MAIN WIRING ALONGWITH EARTH WIRE , SUPPLY AND INSTALLATION OF VERTICAL LOAD LINE DISTRIBUTION BOARD , SUPPLY AND INSTALLATION OF MCCB 4 POLE 16 KA 415 V 125 A , SUPPLY AND INSTALLATION OF MCB 3 POLE 2 10 KA 415 V 25 TO 63 A , SUPPLY AND INSTALLATION OF LOAD CHANGE OVER SWITCH 4 POLE 3 TO 7 KA 415 V 125A , SUPPLY AND INSTALLATION OF COPPER BONDED STEEL EARTH ROD 3 , SUPPLY AND INSTALLATION OF COPPER BONDED STEEL ROUND CONDUCTOR , SUPPLY AND INSTALLATION OF COMMON BUS BAR FOR EARTH CONNECTION

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

24

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Nilgiris

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NilgirisNilgiris--860-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9990088.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

SUPPLY AND INSTALLATION OF 40 KVA ONLINE UPS WITH BATTARIES

40 KVA Online Double Conversion UPS System complete with IGBT Active Front End Rectifier, DSP controlled inverter, static and maintenance bypass, LCD display, mimic panel, battery bank with MS rack, inter cell connectors, battery/AC cables, glands, lugs, and all associated accessories.

8 nos Delivery: 60 days
#2

SUPPLY AND INSTALLATION OF SURFACE SUB MAIN WIRING ALONGWITH EARTH WIRE

Surface sub main wiring FRLS PVC copper cable 4 by 10 SQMM with earth wire size 2 by 10 SQMM with copper lugs including all accessories as per site requirement

400 rm Delivery: 60 days
#3

SUPPLY AND INSTALLATION OF VERTICAL LOAD LINE DISTRIBUTION BOARD

4 Way VTPN Double Door DB Vertical Loadline, 240V, made of CRCA mild steel with epoxy powder coating/polyester insulation, IP43 and IK09 protection, dust and vermin proof with 200A copper busbar, suitable for MCCB incomer and MCB outgoings including all accessories as per site requirement

8 nos Delivery: 60 days
#4

SUPPLY AND INSTALLATION OF MCCB 4 POLE 16 KA 415 V 125 A

MCCB 4 pole 125 A 415 V 16 KA having Breaking capacity with adjustable overload and adjustable Short circuit setting and thermal magnetic release including all accessories as per site requirement

8 nos Delivery: 60 days
#5

SUPPLY AND INSTALLATION OF MCB 3 POLE 2 10 KA 415 V 25 TO 63 A

MCB TP 25 To 63 AMP 415V 10KA C curve having current carrying capacity in the DB including all accessories as per site requirement

16 nos Delivery: 60 days
#6

SUPPLY AND INSTALLATION OF LOAD CHANGE OVER SWITCH 4 POLE 3 TO 7 KA 415 V 125A

Load change over switch 4 pole I O II 125 A, 415 V 3 to 7 KA in sheet mental enclosure modular including all accessories as per site requirement

8 nos Delivery: 60 days
#7

SUPPLY AND INSTALLATION OF COPPER BONDED STEEL EARTH ROD 3

Copper Bonded Steel Earth Rod of 3 Meter length and 14.2 mm diameter including all accessories and fixing of earth rod as per site requirement

16 nos Delivery: 60 days
#8

SUPPLY AND INSTALLATION OF COPPER BONDED STEEL ROUND CONDUCTOR

Copper Bonded Steel Round Conductor 10 mm size low carbon steel core for flexibility, minimum 250 microns continuous copper bonding providing high conductivity and corrosion resistance without cracking or tearing on bending, including all accessories as per site requirement

350 rm Delivery: 60 days
#9

SUPPLY AND INSTALLATION OF COMMON BUS BAR FOR EARTH CONNECTION

250x50x3 mm common bus bar for earth connection with suitable base clamps & insulators, Including all accessories as per site requirement.

8 nos Delivery: 60 days

Categories 97

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement