Procurement Opportunity: Supply of Manpower comprising of Engineering Assistants (Civil) - 06 Nos for a period of 2 years (2025-2027) in SOUTH GOA, GOA
Mormugao Port Authority
SOUTH GOA, GOA
Progress
Quantity
800
The Airports Authority of India invites bids for a security equipment procurement in SOUTH GOA, GOA 403105. The project covers 78 BOQ items with an estimated contract value of ₹67,547,521.00 and an EMD of ₹2,026,426.00. The procurement is governed by buyer-added terms, including an option to increase/decrease quantity up to 25% and delivery timelines linked to the original delivery period with a minimum 30-day extension. The ATC clauses impose penalties for delayed payments and specify post-approval contract extensions. Bidders should note the online EMD payment method via RTGS/Internet Banking to Airports Authority of India.
78 items listed in BOQ; no item-level specs provided
Estimated contract value: ₹67,547,521.00
EMD amount: ₹2,026,426.00
Quantity adjustment: ±25% during bid and contract, subject to delivery constraints
Delivery period mechanics: begins from last date of original delivery order; extended period calculated as (increased quantity ÷ original quantity) × original delivery period with minimum 30 days
Payment terms: online EMD payment via RTGS/IFSC to AAI bank account; reference the bid number in transfer details
Penalties: daily penalties for delayed service remuneration and EPF/ESI deposits; cancellation charges at 10% of order value
ATC obligations: EPF/ESI compliance and online documentation requirements
EMD payment via RTGS/Internet Banking to AAI with bid reference
Quantity may vary ±25%; delivery period linked to original order
ATC penalties include delayed remuneration and 10% cancellation charge
EMD via online RTGS/Internet Banking to Airports Authority of India; include bid number and bidder name; scanned proof of transfer to be uploaded with bid submission
Delivery period starts from the last date of the original delivery order; any extended period follows the specified calculation with a minimum 30 days
Delay in take-home remuneration deposits and EPF/ESI may incur penalties; contract cancellation charges are 10% of the order value
Experience in supplying security equipment or related deployment
Financial stability evidenced by audited statements
GST registration and PAN; compliant with EPF/ESI requirements as applicable
Tender Category
Goods
Bid To RA
No
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Mormugao Port Authority
SOUTH GOA, GOA
N/A
KORBA, CHHATTISGARH
N/A
NORTH AND MIDDLE ANDAMAN, ANDAMAN AND NICOBAR ISLANDS
NTPC Limited
RAIGARH, CHHATTISGARH
N/A
NEW DELHI, DELHI
Tender Results
Loading results...
Manpower for O and M installations For 1st Year
As per specification document , Schedule of Quantity , Item No 1 a at page-224
Manpower for O and M installations For 2ndYear
As per specification document , Schedule of Quantity , Item No 1b at page-224
Rewinding, of 1.5 HP Motor 1st year
As per specification document , Schedule of Quantity , Item No 2a i at page-224
Rewinding, of 3 HP sewage pump 1st year
As per specification document , Schedule of Quantity , Item No 2a ii at page-224
Rewinding, of 3 HP submersible pump 1st year
As per specification document , Schedule of Quantity , Item No 2a iii at page-224
Rewinding, of 5 HP pump motor 1st year
As per specification document , Schedule of Quantity , Item No 2a iv at page-224
Rewinding, of 10 HP pump motor 1st year
As per specification document , Schedule of Quantity , Item No 2a v at page-224
Rewinding, of 12.5 HP pump motor 1st year
As per specification document , Schedule of Quantity , Item No 2a vi at page-224
Rewinding, of 1.5 HP Motor 2nd year
As per specification document , Schedule of Quantity , Item No 2b i at page-224
Rewinding, of 3 HP sewage pump 2nd year
As per specification document , Schedule of Quantity , Item No 2b ii at page-224
Rewinding, of 3 HP pump 2nd year
As per specification document , Schedule of Quantity , Item No 2b iii at page-224
Rewinding, of 5 HP pump motor 2nd year
As per specification document , Schedule of Quantity , Item No 2b iv at page-224
Rewinding, of 10 HP pump motor 2nd year
As per specification document , Schedule of Quantity , Item No 2b v at page-224
Rewinding, of 12.5 HP pump motor 2nd year
As per specification document , Schedule of Quantity , Item No 2b vi at page-224
Repairing 1200 mm ceiling fan For 1st Year
As per specification document , Schedule of Quantity , Item No 3a i at page-224
Repairing 450 mm sweep size, wall mounted type, heavy duty air circulator fan For 1st Year
As per specification document , Schedule of Quantity , Item No 3a ii at page-224
Repairing 400 millimeter sweep size pedestal fan For 1st Year
As per specification document , Schedule of Quantity , Item No 3a iii at page-224
Repairing 400 millimeter sweep size wall mounted fan For 1st Year
As per specification document , Schedule of Quantity , Item No 3a iv at page-224
Repairing 1200 mm ceiling fan For 2nd Year
As per specification document , Schedule of Quantity , Item No 3b i at page-225
Repairing 450 mm sweep size wall mounted type, heavy duty air circulator fan For 2nd Year
As per specification document , Schedule of Quantity , Item No 3b ii at page-225
Repairing 400 millimeter sweep size pedestal fan For 2nd Year
As per specification document , Schedule of Quantity , Item No 3b iii at page-225
Repairing 400 millimeter sweep size wall mounted fan For 2nd Year
As per specification document , Schedule of Quantity , Item No 3b iv at page-225
Servicing of Nutech make, HVLS Fans For 1st Year
As per specification document , Schedule of Quantity , Item No 4a at page-225
Servicing of Nutech make, HVLS Fans For2nd Year
As per specification document , Schedule of Quantity , Item No 4b at page-225
Servicing Testing and checking L and T make ACB of rating 800-1600 A For 1st Year
As per specification document , Schedule of Quantity , Item No 5a at page-225
Servicing Testing and checking L and T make ACB of rating 800-1600 A For 2nd Year
As per specification document , Schedule of Quantity , Item No 5b at page-225
Servicing Testing and checking L and T make ACB of rating 2000 A - 2500A For st Year
As per specification document , Schedule of Quantity , Item No 6a at page-225
Servicing Testing and checking L and T make ACB of rating 2000 A - 2500A For 2nd Year
As per specification document , Schedule of Quantity , Item No 6b at page-225
Servicing Testing and checking L and T make ACB of rating 3200A - 4000A For 1st Year
As per specification document , Schedule of Quantity , Item No 7a at page-225
Servicing Testing and checking L and T make ACB of rating 3200A - 4000A For 2nd Year
As per specification document , Schedule of Quantity , Item No 7b at page-225
Servicing checking and testing of schneider make ACB 1600 A for 1st Year
As per specification document , Schedule of Quantity , Item No 8a i at page-225
Servicing checking and testing of schneider make ACB 3200 A for 1st Year
As per specification document , Schedule of Quantity , Item No 8a ii at page-225
Servicing checking and testing of schneider make ACB 1600 A for 2nd Year
As per specification document , Schedule of Quantity , Item No 8b i at page-225
Servicing checking and testing of schneider make ACB 3200 A for 2nd Year
As per specification document , Schedule of Quantity , Item No 8b ii at page-225
Servicing, checking and testing of GE make ACB 1250A for the 1st year
As per specification document , Schedule of Quantity , Item No 9a i at page-225
Servicing, checking and testing of GE make ACB 1600A for the 1st year
As per specification document , Schedule of Quantity , Item No 9a ii at page-225
Servicing, checking and testing of GE make ACB 1250A for the 2nd year
As per specification document , Schedule of Quantity , Item No 9b i at page-225
Servicing, checking and testing of GE make ACB 1600A for the 2nd year
As per specification document , Schedule of Quantity , Item No 9b ii at page-225
servicing checking and testing of 33KV VCB Make Jyoti for the 1st year
As per specification document , Schedule of Quantity , Item No 10a at page-226
servicing checking and testing of 33KV VCB Make Jyoti for the 2nd year
As per specification document , Schedule of Quantity , Item No 10b at page-226
Testing of relays ABB Model CV2D2J for 1 st year
As per specification document , Schedule of Quantity , Item No 11a at page-226
Testing of relays ABB Model CV2D2J for 2nd year
As per specification document , Schedule of Quantity , Item No 11b at page-226
Testing of relays ABB Model PQ8NCH2J for 1 st year
As per specification document , Schedule of Quantity , Item No 12a at page-226
Testing of relays ABB Mode lPQ8NCH2J for 2nd year
As per specification document , Schedule of Quantity , Item No 12b at page-226
Testing of relays ABB SPAJ140C Siemens 7Sr 1003 for 1 st year
As per specification document , Schedule of Quantity , Item No 13a at page-226
Testing of relays ABB- SPAJ140C Siemens 7Sr 1003 for 2nd year
As per specification document , Schedule of Quantity , Item No 13b at page-226
Testing of relays ABB Model TCS for 1 st year
As per specification document , Schedule of Quantity , Item No 14a at page-226
Testing of relays ABB Model TCS for 2nd year
As per specification document , Schedule of Quantity , Item No 14b at page-226
Testing of relays ABB Model VHXM22B VHXM23B for 1 st year
As per specification document , Schedule of Quantity , Item No 15a at page-226
Testing of relays ABB Model VHXM22B VHXM23Bfor 2nd year
As per specification document , Schedule of Quantity , Item No 15b at page-226
Testing of relays ABB Model REJ601 for 1 st year
As per specification document , Schedule of Quantity , Item No 16a at page-226
Testing of relays ABB Model REJ601 for 2nd year
As per specification document , Schedule of Quantity , Item No 16b at page-226
Testing of relays L and T Model MG30 for 1 st year
As per specification document , Schedule of Quantity , Item No 17a at page-226
Testing of relays L and T Model MG30 for 2nd year
As per specification document , Schedule of Quantity , Item No 17b at page-226
Testing of relays L and T Model MD32G for 1 st year
As per specification document , Schedule of Quantity , Item No 18a at page-226
Testing of relays L and T Model MD32G for 2nd year
As per specification document , Schedule of Quantity , Item No 18b at page-226
Testing of relays ALSTOM Model VAX3 for 1 st year
As per specification document , Schedule of Quantity , Item No 19a at page-226
Testing of relays ALSTOM Model VAX3 for 2nd year
As per specification document , Schedule of Quantity , Item No 19b at page-226
Testing of relays ALSTOM Model- VAJH for 1 st year
As per specification document , Schedule of Quantity , Item No 20a at page-226
Testing of relays ALSTOM Model- VAJH for 2nd year
As per specification document , Schedule of Quantity , Item No 20b at page-226
Testing of relays MASIBUS Model 8208 MIX for 1 st year
As per specification document , Schedule of Quantity , Item No 21a at page-226
Testing of relays MASIBUS Model 8208 MIX for 2nd year
As per specification document , Schedule of Quantity , Item No 21b at page-226
Testing of relays ASHIDA Model ADR241AX for 1 st year
As per specification document , Schedule of Quantity , Item No 22a at page-226
Testing of relays ASHIDA Model ADR241AX for 2nd year
As per specification document , Schedule of Quantity , Item No 22b at page-226
Servicing of 3x 4kw grundfos make hydropneumatic pumps for 1st Year
As per specification document , Schedule of Quantity , Item No 23a at page-226
Servicing of 3x 4kw grundfos make hydropneumatic pumps for 2nd Year
As per specification document , Schedule of Quantity , Item No 23b at page-226
Servicing of 0.55 kW - 5kw grundfos make pumps ffor 1st year
As per specification document , Schedule of Quantity , Item No 24a at page-226
Servicing of 0.55 kW - 5kw grundfos make pumps for 2nd year
As per specification document , Schedule of Quantity , Item No 24b at page-226
Dehydration filteration of transformer oil of 1000 KVA transformer for 1st year
As per specification document , Schedule of Quantity , Item No 25a at page-227
Dehydration filteration of transformer oil of 1000 KVA transformer for 2nd year
As per specification document , Schedule of Quantity , Item No 25b at page-227
The execution of items mentioned in CPWD Delhi schedule of rates E and M 2025
As per specification document , Schedule of Quantity , Item No 26 at page-227
Supply of transformer oil
As per specification document , Schedule of Quantity , Item No 27 at page-227
Supply of silica gel
As per specification document , Schedule of Quantity , Item No 28 at page-227
Supply of Insulation rubber mat 1.1KV
As per specification document , Schedule of Quantity , Item No 29 at page-227
Supply of Discharge Rod
As per specification document , Schedule of Quantity , Item No 30 at page-227
Liaisoning with Central Electricity Authority for renewal of CEA certification
As per specification document , Schedule of Quantity , Item No 31 at page-227
Carrying out stack DG Emission test of 5 nos. 1500KVA DG set for 1st Year
As per specification document , Schedule of Quantity , Item No 32a at page-227
Carrying out stack DG Emission test of 5 nos. 1500KVA DG set for 2nd Year
As per specification document , Schedule of Quantity , Item No 32b at page-227
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Manpower for O and M installations For 1st Year | As per specification document , Schedule of Quantity , Item No 1 a at page-224 | 12 | month | goa@electrical | 730 | |
| 2 | Manpower for O and M installations For 2ndYear | As per specification document , Schedule of Quantity , Item No 1b at page-224 | 12 | month | goa@electrical | 730 | |
| 3 | Rewinding, of 1.5 HP Motor 1st year | As per specification document , Schedule of Quantity , Item No 2a i at page-224 | 1 | job | goa@electrical | 730 | |
| 4 | Rewinding, of 3 HP sewage pump 1st year | As per specification document , Schedule of Quantity , Item No 2a ii at page-224 | 1 | job | goa@electrical | 730 | |
| 5 | Rewinding, of 3 HP submersible pump 1st year | As per specification document , Schedule of Quantity , Item No 2a iii at page-224 | 1 | job | goa@electrical | 730 | |
| 6 | Rewinding, of 5 HP pump motor 1st year | As per specification document , Schedule of Quantity , Item No 2a iv at page-224 | 1 | job | goa@electrical | 730 | |
| 7 | Rewinding, of 10 HP pump motor 1st year | As per specification document , Schedule of Quantity , Item No 2a v at page-224 | 1 | job | goa@electrical | 730 | |
| 8 | Rewinding, of 12.5 HP pump motor 1st year | As per specification document , Schedule of Quantity , Item No 2a vi at page-224 | 1 | job | goa@electrical | 730 | |
| 9 | Rewinding, of 1.5 HP Motor 2nd year | As per specification document , Schedule of Quantity , Item No 2b i at page-224 | 1 | job | goa@electrical | 730 | |
| 10 | Rewinding, of 3 HP sewage pump 2nd year | As per specification document , Schedule of Quantity , Item No 2b ii at page-224 | 1 | job | goa@electrical | 730 | |
| 11 | Rewinding, of 3 HP pump 2nd year | As per specification document , Schedule of Quantity , Item No 2b iii at page-224 | 1 | job | goa@electrical | 730 | |
| 12 | Rewinding, of 5 HP pump motor 2nd year | As per specification document , Schedule of Quantity , Item No 2b iv at page-224 | 1 | job | goa@electrical | 730 | |
| 13 | Rewinding, of 10 HP pump motor 2nd year | As per specification document , Schedule of Quantity , Item No 2b v at page-224 | 1 | job | goa@electrical | 730 | |
| 14 | Rewinding, of 12.5 HP pump motor 2nd year | As per specification document , Schedule of Quantity , Item No 2b vi at page-224 | 1 | job | goa@electrical | 730 | |
| 15 | Repairing 1200 mm ceiling fan For 1st Year | As per specification document , Schedule of Quantity , Item No 3a i at page-224 | 10 | each | goa@electrical | 730 | |
| 16 | Repairing 450 mm sweep size, wall mounted type, heavy duty air circulator fan For 1st Year | As per specification document , Schedule of Quantity , Item No 3a ii at page-224 | 10 | each | goa@electrical | 730 | |
| 17 | Repairing 400 millimeter sweep size pedestal fan For 1st Year | As per specification document , Schedule of Quantity , Item No 3a iii at page-224 | 10 | each | goa@electrical | 730 | |
| 18 | Repairing 400 millimeter sweep size wall mounted fan For 1st Year | As per specification document , Schedule of Quantity , Item No 3a iv at page-224 | 10 | each | goa@electrical | 730 | |
| 19 | Repairing 1200 mm ceiling fan For 2nd Year | As per specification document , Schedule of Quantity , Item No 3b i at page-225 | 10 | each | goa@electrical | 730 | |
| 20 | Repairing 450 mm sweep size wall mounted type, heavy duty air circulator fan For 2nd Year | As per specification document , Schedule of Quantity , Item No 3b ii at page-225 | 10 | each | goa@electrical | 730 | |
| 21 | Repairing 400 millimeter sweep size pedestal fan For 2nd Year | As per specification document , Schedule of Quantity , Item No 3b iii at page-225 | 10 | each | goa@electrical | 730 | |
| 22 | Repairing 400 millimeter sweep size wall mounted fan For 2nd Year | As per specification document , Schedule of Quantity , Item No 3b iv at page-225 | 10 | each | goa@electrical | 730 | |
| 23 | Servicing of Nutech make, HVLS Fans For 1st Year | As per specification document , Schedule of Quantity , Item No 4a at page-225 | 5 | job | goa@electrical | 730 | |
| 24 | Servicing of Nutech make, HVLS Fans For2nd Year | As per specification document , Schedule of Quantity , Item No 4b at page-225 | 5 | job | goa@electrical | 730 | |
| 25 | Servicing Testing and checking L and T make ACB of rating 800-1600 A For 1st Year | As per specification document , Schedule of Quantity , Item No 5a at page-225 | 15 | each | goa@electrical | 730 | |
| 26 | Servicing Testing and checking L and T make ACB of rating 800-1600 A For 2nd Year | As per specification document , Schedule of Quantity , Item No 5b at page-225 | 15 | each | goa@electrical | 730 | |
| 27 | Servicing Testing and checking L and T make ACB of rating 2000 A - 2500A For st Year | As per specification document , Schedule of Quantity , Item No 6a at page-225 | 8 | each | goa@electrical | 730 | |
| 28 | Servicing Testing and checking L and T make ACB of rating 2000 A - 2500A For 2nd Year | As per specification document , Schedule of Quantity , Item No 6b at page-225 | 8 | each | goa@electrical | 730 | |
| 29 | Servicing Testing and checking L and T make ACB of rating 3200A - 4000A For 1st Year | As per specification document , Schedule of Quantity , Item No 7a at page-225 | 21 | each | goa@electrical | 730 | |
| 30 | Servicing Testing and checking L and T make ACB of rating 3200A - 4000A For 2nd Year | As per specification document , Schedule of Quantity , Item No 7b at page-225 | 21 | each | goa@electrical | 730 | |
| 31 | Servicing checking and testing of schneider make ACB 1600 A for 1st Year | As per specification document , Schedule of Quantity , Item No 8a i at page-225 | 3 | each | goa@electrical | 730 | |
| 32 | Servicing checking and testing of schneider make ACB 3200 A for 1st Year | As per specification document , Schedule of Quantity , Item No 8a ii at page-225 | 7 | each | goa@electrical | 730 | |
| 33 | Servicing checking and testing of schneider make ACB 1600 A for 2nd Year | As per specification document , Schedule of Quantity , Item No 8b i at page-225 | 3 | each | goa@electrical | 730 | |
| 34 | Servicing checking and testing of schneider make ACB 3200 A for 2nd Year | As per specification document , Schedule of Quantity , Item No 8b ii at page-225 | 7 | each | goa@electrical | 730 | |
| 35 | Servicing, checking and testing of GE make ACB 1250A for the 1st year | As per specification document , Schedule of Quantity , Item No 9a i at page-225 | 4 | each | goa@electrical | 730 | |
| 36 | Servicing, checking and testing of GE make ACB 1600A for the 1st year | As per specification document , Schedule of Quantity , Item No 9a ii at page-225 | 3 | each | goa@electrical | 730 | |
| 37 | Servicing, checking and testing of GE make ACB 1250A for the 2nd year | As per specification document , Schedule of Quantity , Item No 9b i at page-225 | 4 | each | goa@electrical | 730 | |
| 38 | Servicing, checking and testing of GE make ACB 1600A for the 2nd year | As per specification document , Schedule of Quantity , Item No 9b ii at page-225 | 3 | each | goa@electrical | 730 | |
| 39 | servicing checking and testing of 33KV VCB Make Jyoti for the 1st year | As per specification document , Schedule of Quantity , Item No 10a at page-226 | 18 | each | goa@electrical | 730 | |
| 40 | servicing checking and testing of 33KV VCB Make Jyoti for the 2nd year | As per specification document , Schedule of Quantity , Item No 10b at page-226 | 18 | each | goa@electrical | 730 | |
| 41 | Testing of relays ABB Model CV2D2J for 1 st year | As per specification document , Schedule of Quantity , Item No 11a at page-226 | 30 | nos | goa@electrical | 730 | |
| 42 | Testing of relays ABB Model CV2D2J for 2nd year | As per specification document , Schedule of Quantity , Item No 11b at page-226 | 30 | nos | goa@electrical | 730 | |
| 43 | Testing of relays ABB Model PQ8NCH2J for 1 st year | As per specification document , Schedule of Quantity , Item No 12a at page-226 | 18 | nos | goa@electrical | 730 | |
| 44 | Testing of relays ABB Mode lPQ8NCH2J for 2nd year | As per specification document , Schedule of Quantity , Item No 12b at page-226 | 18 | nos | goa@electrical | 730 | |
| 45 | Testing of relays ABB SPAJ140C Siemens 7Sr 1003 for 1 st year | As per specification document , Schedule of Quantity , Item No 13a at page-226 | 13 | nos | goa@electrical | 730 | |
| 46 | Testing of relays ABB- SPAJ140C Siemens 7Sr 1003 for 2nd year | As per specification document , Schedule of Quantity , Item No 13b at page-226 | 13 | nos | goa@electrical | 730 | |
| 47 | Testing of relays ABB Model TCS for 1 st year | As per specification document , Schedule of Quantity , Item No 14a at page-226 | 14 | nos | goa@electrical | 730 | |
| 48 | Testing of relays ABB Model TCS for 2nd year | As per specification document , Schedule of Quantity , Item No 14b at page-226 | 14 | nos | goa@electrical | 730 | |
| 49 | Testing of relays ABB Model VHXM22B VHXM23B for 1 st year | As per specification document , Schedule of Quantity , Item No 15a at page-226 | 8 | nos | goa@electrical | 730 | |
| 50 | Testing of relays ABB Model VHXM22B VHXM23Bfor 2nd year | As per specification document , Schedule of Quantity , Item No 15b at page-226 | 8 | nos | goa@electrical | 730 | |
| 51 | Testing of relays ABB Model REJ601 for 1 st year | As per specification document , Schedule of Quantity , Item No 16a at page-226 | 2 | nos | goa@electrical | 730 | |
| 52 | Testing of relays ABB Model REJ601 for 2nd year | As per specification document , Schedule of Quantity , Item No 16b at page-226 | 2 | nos | goa@electrical | 730 | |
| 53 | Testing of relays L and T Model MG30 for 1 st year | As per specification document , Schedule of Quantity , Item No 17a at page-226 | 4 | nos | goa@electrical | 730 | |
| 54 | Testing of relays L and T Model MG30 for 2nd year | As per specification document , Schedule of Quantity , Item No 17b at page-226 | 4 | nos | goa@electrical | 730 | |
| 55 | Testing of relays L and T Model MD32G for 1 st year | As per specification document , Schedule of Quantity , Item No 18a at page-226 | 4 | nos | goa@electrical | 730 | |
| 56 | Testing of relays L and T Model MD32G for 2nd year | As per specification document , Schedule of Quantity , Item No 18b at page-226 | 4 | nos | goa@electrical | 730 | |
| 57 | Testing of relays ALSTOM Model VAX3 for 1 st year | As per specification document , Schedule of Quantity , Item No 19a at page-226 | 4 | nos | goa@electrical | 730 | |
| 58 | Testing of relays ALSTOM Model VAX3 for 2nd year | As per specification document , Schedule of Quantity , Item No 19b at page-226 | 4 | nos | goa@electrical | 730 | |
| 59 | Testing of relays ALSTOM Model- VAJH for 1 st year | As per specification document , Schedule of Quantity , Item No 20a at page-226 | 4 | nos | goa@electrical | 730 | |
| 60 | Testing of relays ALSTOM Model- VAJH for 2nd year | As per specification document , Schedule of Quantity , Item No 20b at page-226 | 4 | nos | goa@electrical | 730 | |
| 61 | Testing of relays MASIBUS Model 8208 MIX for 1 st year | As per specification document , Schedule of Quantity , Item No 21a at page-226 | 4 | nos | goa@electrical | 730 | |
| 62 | Testing of relays MASIBUS Model 8208 MIX for 2nd year | As per specification document , Schedule of Quantity , Item No 21b at page-226 | 4 | nos | goa@electrical | 730 | |
| 63 | Testing of relays ASHIDA Model ADR241AX for 1 st year | As per specification document , Schedule of Quantity , Item No 22a at page-226 | 2 | nos | goa@electrical | 730 | |
| 64 | Testing of relays ASHIDA Model ADR241AX for 2nd year | As per specification document , Schedule of Quantity , Item No 22b at page-226 | 2 | nos | goa@electrical | 730 | |
| 65 | Servicing of 3x 4kw grundfos make hydropneumatic pumps for 1st Year | As per specification document , Schedule of Quantity , Item No 23a at page-226 | 2 | job | goa@electrical | 730 | |
| 66 | Servicing of 3x 4kw grundfos make hydropneumatic pumps for 2nd Year | As per specification document , Schedule of Quantity , Item No 23b at page-226 | 2 | job | goa@electrical | 730 | |
| 67 | Servicing of 0.55 kW - 5kw grundfos make pumps ffor 1st year | As per specification document , Schedule of Quantity , Item No 24a at page-226 | 8 | job | goa@electrical | 730 | |
| 68 | Servicing of 0.55 kW - 5kw grundfos make pumps for 2nd year | As per specification document , Schedule of Quantity , Item No 24b at page-226 | 8 | job | goa@electrical | 730 | |
| 69 | Dehydration filteration of transformer oil of 1000 KVA transformer for 1st year | As per specification document , Schedule of Quantity , Item No 25a at page-227 | 2 | job | goa@electrical | 730 | |
| 70 | Dehydration filteration of transformer oil of 1000 KVA transformer for 2nd year | As per specification document , Schedule of Quantity , Item No 25b at page-227 | 2 | job | goa@electrical | 730 | |
| 71 | The execution of items mentioned in CPWD Delhi schedule of rates E and M 2025 | As per specification document , Schedule of Quantity , Item No 26 at page-227 | 1 | job | goa@electrical | 730 | |
| 72 | Supply of transformer oil | As per specification document , Schedule of Quantity , Item No 27 at page-227 | 200 | liters | goa@electrical | 730 | |
| 73 | Supply of silica gel | As per specification document , Schedule of Quantity , Item No 28 at page-227 | 20 | kgs | goa@electrical | 730 | |
| 74 | Supply of Insulation rubber mat 1.1KV | As per specification document , Schedule of Quantity , Item No 29 at page-227 | 50 | mtrs | goa@electrical | 730 | |
| 75 | Supply of Discharge Rod | As per specification document , Schedule of Quantity , Item No 30 at page-227 | 4 | nos | goa@electrical | 730 | |
| 76 | Liaisoning with Central Electricity Authority for renewal of CEA certification | As per specification document , Schedule of Quantity , Item No 31 at page-227 | 1 | job | goa@electrical | 730 | |
| 77 | Carrying out stack DG Emission test of 5 nos. 1500KVA DG set for 1st Year | As per specification document , Schedule of Quantity , Item No 32a at page-227 | 1 | job | goa@electrical | 730 | |
| 78 | Carrying out stack DG Emission test of 5 nos. 1500KVA DG set for 2nd Year | As per specification document , Schedule of Quantity , Item No 32b at page-227 | 1 | job | goa@electrical | 730 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for relevant security equipment supply
Financial statements (audited or certified)
EMD payment proof (online RTGS/Internet Banking transfer) with bid reference
Technical bid document or compliance statement
OEM authorization or authorized dealer certificate (if applicable)
EPF/ESI deposits proof for service providers (as applicable to ATC terms)
Any prior project references for similar 78-item security equipment procurement
Key insights about GOA tender market
Bidders should prepare EMD of ₹2,026,426 and submit online via RTGS/Internet Banking to the Airports Authority of India account with the bid reference. Include scanned proof of transfer and all required documents (GST, PAN, financials, experience certificates). Verify the 78-item BOQ scope and comply with ATC terms and penalties.
Required documents include GST registration, PAN card, audited financial statements, experience certificates for security equipment, EMD payment proof, technical bid/compliance, OEM authorizations if applicable, and EPF/ESI compliance proof as per ATC terms.
EMD is ₹2,026,426.00. Payment must be made online via RTGS/Internet Banking to Airports Authority of India; include bid number and bidder name in the transaction details and upload scanned proof with the bid.
The purchaser may adjust quantity by ±25% at bid and during contract. Delivery periods start from the last date of the original order, with extended time calculated using the specified formula and a minimum of 30 days.
ATC terms impose Rs. 100 per day per resource as warning, then Rs. 200 per day per resource, withholding payments until deposits or proofs are submitted. Cancellation charges are 10% of the order value if contract is terminated.
Current data shows 78 BOQ items but no detailed item-wise specs. Bidders should prepare a comprehensive security equipment capability plan and seek item-level requirements during bid submission or pre-bid clarification, ensuring alignment with overall contract value of ₹67,547,521 and EMD.
Rajasthan State Pollution Control Board
📍 ALWAR, RAJASTHAN
📍 KARNATAKA
MD - UPCL
📍 HARIDWAR, UTTARAKHAND
Medical and Health
📍 JHUNJHUNU, RAJASTHAN
Archaeological Survey of India
📍 KANGRA, HIMACHAL PRADESH
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS