Indian Army RAM DDR4 8GB, 1TB HDD, UPS, Keyboard & Mouse Tender Gwalior Madhya Pradesh 2026

Bid Publish Date

01-Feb-2026, 8:13 pm

Bid End Date

14-Feb-2026, 1:00 pm

Generate Docs

Progress

Issue01-Feb-2026, 8:13 pm
Technical02-Jun-2026, 3:02 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

29

Category

HEAD ASSY L3250

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM obsolescence requirement: items must have at least 1 year residual market life and not be declared end-of-life by OEM
  • Delivery option clause allowing up to 25% quantity variation during contract and currency
  • Mandatory Detailed Design Drawings approval within 5 days of award, with modification turnaround within 5 days
  • Delivery and installation at: 256 Fd Wksp Coy (address specified in terms)
  • GST responsibility on bidder; reimbursement as actuals or applicable rate, whichever is lower
  • Vendor Code creation requires PAN, GSTIN, cancelled cheque, and EFT Mandate
  • Non-liability for LD if drawings approval is delayed by the buyer; delivery period re-fixed accordingly
  • No explicit EMD amount provided; bidders must verify and submit appropriate security/documentation

Categories 9

Tender Overview

Organization: Indian Army (Department Of Military Affairs) – procurement of computer hardware and peripherals in GWALIOR, MADHYA PRADESH. Category items include RAM DDR4 8GB, HARD DISK 1TB, KEYBOARD AND MOUSE, BTY 12V 5AH UPS, BATTERY 12V 7AH FOR UPS, PROCESSOR i5 13th GENERATION, POWER SUPPLY CARD 3359 MF 240, HEAD ASSY L3250, LOGIC CARD M200, SMPS. No explicit quantity or total estimated value available. Destination for delivery is the 256 Fd Wksp Coy location. The tender embeds an option clause permitting up to 25% quantity variation during contract execution, with extended delivery time calculated as (Increase/Original) × Original delivery days, minimum 30 days. A detailed design drawing approval step is required within 5 days of award, with modifications provided within 5 days. GST handling is on bidder responsibility; GST reimbursement as actuals or applicable rates, capped by quoted GST. Submission of vendor-code documents (PAN, GSTIN, cancelled cheque, EFT mandate) is mandatory. Delivery and installation, if scoped, will occur at the named workshop site. This tender emphasizes non-obsolescence with a minimum market-life requirement of 1 year for supplied items.

Technical Specifications & Requirements

  • Product names from the category list: RAM DDR4 8GB, HARD DISK 1TB, KEYBOARD AND MOUSE, BTY 12V 5AH UPS, BATTERY 12V 7AH, PROCESSOR i5 13th GENERATION, POWER SUPPLY CARD 3359 MF 240, HEAD ASSY L3250, LOGIC CARD M200, SMPS.
  • No explicit technical performance specs or model numbers are provided; bidders must rely on the provided component categories.
  • Terms require detailed design drawings within 5 days of award, with buyer confirmation or modification list within 5 days.
  • Delivery address specified as 256 Fd Wksp Coy; installation, if included, to occur there.
  • Bidders must ensure products are not end-of-life and have at least 1 year residual market life; no obsolescence as per OEM declarations.
  • Financial standing caveat requires bidders not to be in liquidation and to upload a supportive undertaking.

Terms, Conditions & Eligibility

  • EMD/financial condition: No explicit amount provided; bidders must show non-liquidation status and submit a supporting undertaking.
  • Delivery: Option clause allows up to 25% quantity variation; additional time formula with minimum 30 days.
  • Documentation: Submit PAN, GSTIN, cancelled cheque, and EFT Mandate certified by bank for Vendor Code creation.
  • GST: Bidder bears GST determination; reimbursement as actuals or applicable rates.
  • Design approvals: Detailed Drawings required within 5 days; delay in approval extends delivery period without LD.
  • Warranty/obsolescence: No explicit warranty terms; product life and OEM authorizations implied by non-obsolescence clause.
  • Delivery location: 256 Fd Wksp Coy as specified in the terms.
  • Obligations: Ensure supply per approved drawings with buyer modifications; non-compliance may affect delivery timelines.

Key Specifications

  • RAM DDR4 8GB

  • HARD DISK 1TB

  • KEYBOARD AND MOUSE set

  • BTY 12V 5AH UPS

  • BATTERY 12V 7AH FOR UPS

  • PROCESSOR i5 13th GENERATION

  • POWER SUPPLY CARD 3359 MF 240

  • HEAD ASSY L3250

  • LOGIC CARD M200

  • SMPS

Terms & Conditions

  • Up to 25% quantity variation with extended delivery time

  • 5-day window for Detailed Design Drawings; modifications within 5 days

  • Delivery/installation at 256 Fd Wksp Coy; GST and vendor docs mandatory

Important Clauses

Payment Terms

GST payable by bidder; reimbursement on actuals or applicable rates; no explicit upfront payment terms stated

Delivery Schedule

Delivery period may be adjusted based on approval of drawings; minimum extension logic applies; 25% quantity variation allowed

Penalties/Liquidated Damages

LD terms not specified; delay consequences primarily tied to drawing approvals and extended delivery calculations

Bidder Eligibility

  • Not under liquidation, court receivership, or similar Proceedings

  • Not bankrupt; provide an undertaking to this effect

  • Products must have at least 1 year residual market life and not be end-of-life

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

RAM DDR 4 8GB , HARD DISK 1TB , KEYBOARD AND MOUSE , BTY 12V 5AH UPS , BATTERY 12V 7AH FOR UPS , PROCESSOR i5 13th GENERATION , POWER SUPPLY CARD 3359 MF 240 , HEAD ASSY L3250 , LOGIC CARD M200 , SMPS

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8915711.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

RAM DDR 4 8GB

RAM DDR 4 8GB

4 nos Delivery: 40 days
#2

HARD DISK 1TB

HARD DISK 1TB

1 nos Delivery: 40 days
#3

KEYBOARD AND MOUSE

KEYBOARD AND MOUSE

3 nos Delivery: 40 days
#4

BTY 12V 5AH UPS

BTY 12V 5AH UPS

4 nos Delivery: 40 days
#5

BATTERY 12V 7AH FOR UPS

BATTERY 12V 7AH FOR UPS

12 nos Delivery: 40 days
#6

PROCESSOR i5 13th GENERATION

PROCESSOR i5 13th GENERATION

1 nos Delivery: 40 days
#7

POWER SUPPLY CARD 3359 MF 240

POWER SUPPLY CARD 3359 MF 240

1 nos Delivery: 40 days
#8

HEAD ASSY L3250

HEAD ASSY L3250

1 nos Delivery: 40 days
#9

LOGIC CARD M200

LOGIC CARD M200

1 nos Delivery: 40 days
#10

SMPS

SMPS

1 nos Delivery: 40 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque

4

EFT Mandate certified by bank

5

Product data sheets

6

Undertaking of non-liquidation status

7

OEM authorizations (if required)

8

Detailed Design Drawings (within 5 days of award)

Corrigendum Updates

1 Update
#1

Update

11-Feb-2026

Extended Deadline

14-Feb-2026, 1:00 pm

Opening Date

14-Feb-2026, 1:30 pm

Technical Results

S.No Seller Item Date Status
1
aditya enterprises   Under PMA
-06-02-2026 15:02:30
2
AP COLLECTION   Under PMA
-10-02-2026 16:51:35
3
VRAM ENTERPRISES   Under PMA
-06-02-2026 15:38:11

Financial Results

Rank Seller Price Item
L1
VRAM ENTERPRISES( MSE Social Category:SC )    Under PMA
Item Categories : RAM DDR 4 8GB,HARD DISK 1TB,KEYBOARD AND MOUSE,BTY 12V 5AH UPS,BATTERY 12V 7AH FOR UPS,PROCESSOR i5
L2
aditya enterprises( MSE Social Category:SC )    Under PMA
Item Categories : RAM DDR 4 8GB,HARD DISK 1TB,KEYBOARD AND MOUSE,BTY 12V 5AH UPS,BATTERY 12V 7AH FOR UPS,PROCESSOR i5
L3
AP COLLECTION( MSE Social Category:OBC )    Under PMA
Item Categories : RAM DDR 4 8GB,HARD DISK 1TB,KEYBOARD AND MOUSE,BTY 12V 5AH UPS,BATTERY 12V 7AH FOR UPS,PROCESSOR i5

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid on RAM DDR4 8GB tender in Gwalior with Army procurement?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate, plus product data sheets. Ensure non-liquidation status and provide an undertaking. Detailed Design Drawings must be approved within 5 days of award or modified per buyer guidance; delivery follows after approvals.

What documents are required for vendor code creation in this Army tender?

Submit PAN, GSTIN, cancelled cheque, and bank-certified EFT Mandate. Include product data sheets and an undertaking confirming non-liquidation status. OEM authorizations are required if specified, along with GST compliance details and company financials.

What are the technical specification categories for the Army RAM bid?

Categories include RAM DDR4 8GB, HARD DISK 1TB, PROCESSOR i5 13th GENERATION, SMPS and related peripheral sets like KEYBOARD AND MOUSE and UPS batteries. Specific models are not listed; bidders must align with these components and ensure non-obsolescence.

How is delivery time determined for quantity increases in this tender?

The option clause allows up to 25% quantity variation. The extended delivery time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; original period may extend during option exercise.

What are the GST responsibilities for bidders in this Army tender?

Bidders must determine applicable GST; reimbursement will be either actuals or the applicable rate, whichever is lower, with a cap on the quoted GST percentage. No GST handling will be borne by the buyer beyond these terms.

Where is the delivery location for the supply under this tender?

Delivery/installation, if included, will be at the designated facility: 256 Fd Wksp Coy. Ensure DRAWING approvals and modifications are incorporated before dispatch to this workshop address.

What is required for Detailed Design Drawings in this procurement?

Submit Detailed Design Drawings within 5 days of award. The buyer will approve or provide a list of modifications within 5 days. Supply must follow approved drawings, and any delay by the buyer in approval will not attract LD; delivery period is re-fixed accordingly.

What is the minimum market life requirement for supplied items?

Bidders must offer items not declared end-of-life by the OEM and with at least 1 year residual market life. This ensures ongoing support and availability of spare parts for the RAM, HDD, UPS, and related components.