Uttar Pradesh Cooperative Sugar Factories Federation Limited Pan House Fabrication Work Tender Bijnor 2026

Bid Publish Date

29-Aug-2026, 10:04 am

Bid End Date

08-Sep-2026, 11:00 am

EMD

₹9,000

Value

₹8,50,000

Progress

Issue29-Aug-2026, 10:04 am
AwardPending

Key Highlights

  • Pan house fabrication work includes 48 BOQ items across multiple sub-tarts with 25% quantity variation under option clause.
  • EMD set at ₹9,000; estimated procurement value ₹8,50,000; minimum turnover and past experience criteria referenced in bid conditions.
  • Delivery extension mechanism: Extended time calculated as (increased quantity ÷ original quantity) × original period, minimum 30 days.
  • Turnover proof must be certified audited balances or CA certificate; if firm is <3 years old, use post-incorporation years.

Tender Overview

Organization: Uttar Pradesh Cooperative Sugar Factories Federation Limited; Category: pan house fabrication work (42+ distinct pan house items listed); Location: BIJNOR, UTTAR PRADESH 246701; Estimated Value: ₹8,50,000; EMD: ₹9,000; Bid scope includes fabrication for multiple pan houses across a single procurement event; 25% quantity variation allowed under option clause; delivery period linked to order timelines; turnover and past experience criteria referenced in terms, with documentary proof required. The contract structure permits scope expansion during currency at contracted rates, emphasizing flexible quantity management. Unique aspect: large set of 48 BOQ items with non-disclosed unit details, indicating a broad fabrication envelope under a single tender.

Key Specifications

  • Fabrication scope: pan house fabrication work across 48 BOQ items

  • Estimated value: ₹8,50,000

  • EMD: ₹9,000

  • Quantity variation: up to 25% during contract

  • Delivery extension: minimum 30 days; formula-based extension

  • Proof of turnover: audited balances or CA certificate

  • Past experience: contract copies or client execution certificates

Terms & Conditions

  • EMD of ₹9,000 required with bid submission

  • 25% quantity variation allowed under option clause

  • Turnover and past experience documentation mandatory

  • Delivery timelines extendable with minimum 30 days

Important Clauses

Payment Terms

Not explicitly detailed; standard government procurement terms apply per ATC; ensure EMD is submitted and any interim payments follow contract orders.

Delivery Schedule

Delivery period commences from the last date of original delivery order; extended time proportional to quantity increase with a minimum 30 days.

Penalties/Liquidated Damages

Not specified in provided data; bidder to verify ATC for LD/penalties in case of delays or non-compliance.

Bidder Eligibility

  • Minimum average annual turnover as per bid document over last 3 financial years

  • Evidence of past fabrication project experience

  • GST and PAN valid; required certificates uploaded as per ATC

  • Compliance with delivery extension terms and option quantity clause

Tender Data

Bid Details

Quantity

295

Category

pan house fabrication work 1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

4

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

pan house fabrication work 1 , pan house fabrication work 2 , pan house fabrication work 3 , pan house fabrication work 4 , pan house fabrication work 5 , pan house fabrication work 6 , pan house fabrication work 7 , pan house fabrication work 8 , pan house fabrication work 9 , pan house fabrication work 10 , pan house fabrication work 11 , pan house fabrication work 12 , pan house fabrication work 13 , pan house fabrication work 14 , pan house fabrication work 15 , pan house fabrication work 16 , pan house fabrication work 17 , pan house fabrication work 18 , pan house fabrication work 19 , pan house fabrication work 20 , pan house fabrication work 21 , pan house fabrication work 22 , pan house fabrication work 23 , pan house fabrication work 24 , pan house fabrication work 25 , pan house fabrication work 26 , pan house fabrication work 27 , pan house fabrication work 28 , pan house fabrication work 29 , pan house fabrication work 30 , pan house fabrication work 31 , pan house fabrication work 32 , pan house fabrication work 33 , pan house fabrication work 34 , pan house fabrication work 35 , pan house fabrication work 36 , pan house fabrication work 37 , pan house fabrication work 38 , pan house fabrication work 39 , pan house fabrication work 40 , pan house fabrication work 41 , pan house fabrication work 42 , pan house fabrication work 43 , pan house fabrication work 44 , pan house fabrication work 45 , pan house fabrication work 46 , pan house fabrication work 47 , pan house fabrication work 48

Advisory Bank

PUNJAB NATIONAL BANK

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Bijnor

Delivery Pincodes

246763

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anurag Singh246763,KISAN SAHKARI CHINI MILLS LTD., Sneh Road Najibabad PIN CODE- 246763 GST NO - 09AAAAK1634P1ZD Contact no- 9411427852,6397805612BijnorUttar Pradesh2467631260-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9808902.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 48 Items Sign in for GEM prices

#1

pan house fabrication work 1

Pan house dismantle the damaged pipeline at various locations dispose of it in the scrap yard and install a new pipeline (10inch).

12 pcdm Delivery: 60 days
#2

pan house fabrication work 2

Pan house dismantle the damaged pipeline at various locations dispose of it in the scrap yard and install a new pipeline (8inch).

12 pcdm Delivery: 60 days
#3

pan house fabrication work 3

Pan house dismantle the damaged pipeline at various locations dispose of it in the scrap yard and install a new pipeline (6inch).

52 pcdm Delivery: 60 days
#4

pan house fabrication work 4

Pan house dismantle the damaged pipeline at various locations dispose of it in the scrap yard and install a new pipeline (4inch).

12 pcdm Delivery: 60 days
#5

pan house fabrication work 5

Pan house dismantle the damaged pipeline at various locations dispose of it in the scrap yard and install a new pipeline (3inch).

30 pcdm Delivery: 60 days
#6

pan house fabrication work 6

Pan house dismantle the damaged pipeline at various locations dispose of it in the scrap yard and install a new pipeline (2inch).

30 pcdm Delivery: 60 days
#7

pan house fabrication work 7

Pan house dismantle the bend at various locations. (500 mm)

1 per ton Delivery: 60 days
#8

pan house fabrication work 8

Pan house fabricate and install a bend at various locations. (500 mm)

1 per ton Delivery: 60 days
#9

pan house fabrication work 9

Pan house fabricate and install a bend at various locations. (10inch)

2 pcdn Delivery: 60 days
#10

pan house fabrication work 10

Pan house fabricate and install a bend at various locations. (8inch)

2 pcdn Delivery: 60 days
#11

pan house fabrication work 11

Pan house fabricate and install a bend at various locations. (6inch)

12 pcdn Delivery: 60 days
#12

pan house fabrication work 12

Pan house fabricate and install a bend at various locations. (4inch)

2 pcdn Delivery: 60 days
#13

pan house fabrication work 13

Pan house fabricate and install a flange at various locations. (500 mm)

2 pcdn Delivery: 60 days
#14

pan house fabrication work 14

Pan house fabricate and install a flange at various locations. (10inch)

4 pcdn Delivery: 60 days
#15

pan house fabrication work 15

Pan house fabricate and install a flange at various locations. (8inch)

4 pcdn Delivery: 60 days
#16

pan house fabrication work 16

Pan house fabricate and install a flange at various locations. (6inch)

16 pcdn Delivery: 60 days
#17

pan house fabrication work 17

Pan house fabricate and install a flange at various locations. (4inch)

4 pcdn Delivery: 60 days
#18

pan house fabrication work 18

Pan house fabricate and install a flange at various locations. (3inch)

4 pcdn Delivery: 60 days
#19

pan house fabrication work 19

Pan house fabricate and install a flange at various locations. (2inch)

4 pcdn Delivery: 60 days
#20

pan house fabrication work 20

Pan house dismantle fabricate and install the nipple at various locations. (500 mm)

2 pcdn Delivery: 60 days
#21

pan house fabrication work 21

Pan house fabricate and install a nipple at various locations. (10inch)

2 pcdn Delivery: 60 days
#22

pan house fabrication work 22

Pan house fabricate and install a nipple at various locations. (8inch)

2 pcdn Delivery: 60 days
#23

pan house fabrication work 23

Pan house fabricate and install a nipple at various locations. (6inch)

8 pcdn Delivery: 60 days
#24

pan house fabrication work 24

Pan house fabricate and install a nipple at various locations. (4inch)

2 pcdn Delivery: 60 days
#25

pan house fabrication work 25

Pan house fabricate and install a nipple at various locations. (3inch)

2 pcdn Delivery: 60 days
#26

pan house fabrication work 26

Pan house fabricate and install a nipple at various locations. (2inch)

6 pcdn Delivery: 60 days
#27

pan house fabrication work 27

Pan house open and close the valve at various locations. (10inch)

2 pcdn Delivery: 60 days
#28

pan house fabrication work 28

Pan house open and close the valve at various locations. (8inch)

2 pcdn Delivery: 60 days
#29

pan house fabrication work 29

Pan house open and close the valve at various locations. (6inch)

4 pcdn Delivery: 60 days
#30

pan house fabrication work 30

Pan house open and close the valve at various locations. (4inch)

2 pcdn Delivery: 60 days
#31

pan house fabrication work 31

Pan house open and close the valve at various locations. (3inch)

2 pcdn Delivery: 60 days
#32

pan house fabrication work 32

Cut and remove the pan distributor dispose of it in the scrap yard fabricate a new one by bending an 8/10 mm thick MS plate install it strengthen it and carry out a satisfactory trial.

1 each Delivery: 60 days
#33

pan house fabrication work 33

Cut and remove the B type vacuum crystallizer capacity 45 tons installed on the pan dispose of it in the scrap yard fabricate a new one from the supplied 12 mm thick plate by bending install it at its original location complete all connections replace the damaged shaft channel angle ribbon carry out welding and conduct a leak-proof satisfactory trial. Vacuum crystallizer size 7.30 m length X 2.80 m diameter) L.S.

1 lumpsum Delivery: 60 days
#34

pan house fabrication work 34

For the molasses receiving tank (A-heavy syrup/C-light syrup) cut and remove the damaged shell and partition plate dispose of them in the scrap yard fabricate and install a new tank similar to the original using 8/10 mm thick plate reconnect all related connections and conduct a leak-proof satisfactory trial. Partition plate size diameter 3.0 m length 3.4 m (L.S.). Tank bottom shell size width 2950 mm length 4450 mm.

1 each Delivery: 60 days
#35

pan house fabrication work 35

Remove the damaged catcher from the pan dispose of it in the scrap yard fabricate a new one from an 8/10 mm thick plate install the element and vapor pipe as before and conduct a trial. Size 1.5 m diameter X 2.5 m height.

2 each Delivery: 60 days
#36

pan house fabrication work 36

Dismantle the corroded portion of the Tee installed above dispose of the scrap in the scrap yard ( Size 1120 mm diameter X 3700 mm length.)

1 per ton Delivery: 60 days
#37

pan house fabrication work 37

Fabricate Tee from an 8/10 mm thick plate install it and conduct a satisfactory trial. Size 1120 mm diameter X 3700 mm length.

1 per ton Delivery: 60 days
#38

pan house fabrication work 38

Fabricate and install the corroded platform of the condenser and crystallizer at the pan station using plate material.

20 meter square Delivery: 60 days
#39

pan house fabrication work 39

Cut and remove the corroded dome plate of Pan Nos. 1 and 6 dispose of the scrap in the scrap yard fabricate a new one from an 8/10 mm thick plate and install it. Size 3.10 m diameter X 0.80 m length.

1 each Delivery: 60 days
#40

pan house fabrication work 40

Cut and remove the weak/damaged C-light molasses conditioner (approximate size 2 m length X 2 m diameter) dispose of it in the scrap yard fabricate and install a new one from an 8 TO 10 mm thick plate reinstall the drive shaft arm reduction gearbox etc. as before align them and conduct a satisfactory trial. (Work location height approximately 45 ft.)

1 lumpsum Delivery: 60 days
#41

pan house fabrication work 41

At the pan station cut and remove the damaged rectangular cold water and hot water tank (approximate size length 5.6 m width 2.3 m height 2.8 m) dispose of it in the scrap yard fabricate and install a new one from a 10/12 mm thick plate install all connections valves etc. and conduct a leak-proof satisfactory trial. (Work location height approximately 60 ft.)

1 lumpsum Delivery: 60 days
#42

pan house fabrication work 42

Dismantle the weak vapor pipe of Pan Nos. 1 to 6. (Size 1150 mm diameter length 30 m) (Work location height approximately 60 ft.)

6 per ton Delivery: 60 days
#43

pan house fabrication work 43

Fabricate the weak vapor pipe of Pan Nos. 1 to 6 from 12 mm thick plate. (Size 1150 mm diameter length 30 m) (Work location height approximately 60 ft.)

10 per ton Delivery: 60 days
#44

pan house fabrication work 44

Fabricate and replace the 600 mm diameter manhole of Pan No. 3 using a 10 mm thick plate.

1 each Delivery: 60 days
#45

pan house fabrication work 45

At Pan Nos. 5 and 6 replace and install the corroded 6inch header nipple pipe and flange fit all related nipples valves etc. and conduct a satisfactory trial.

2 each Delivery: 60 days
#46

pan house fabrication work 46

At Pan Nos. 4 and 5 fabricate and install the catcher element using 75 X 75 X 8 mm angle.

2 each Delivery: 60 days
#47

pan house fabrication work 47

Cutting the partition plate of the syrup tank installed on the pan and putting it in the scrap yard and replacing it with a new 10/12 mm plate. Size width 2.72 m. length 3.5 m.

1 each Delivery: 60 days
#48

pan house fabrication work 48

Cut and remove the syrup header and fabricate and install a new header.

1 each Delivery: 60 days

Categories 47

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements or CA certificate showing turnover

4

Past project experience documents (contract copies, client certificates, invoices)

5

EMD submission proof (payment receipt or bank guarantee)

6

Technical bid documents and any OEM authorizations if required

7

Any certificates or compliance documents stipulated in ATC/Corrigendum

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for pan house fabrication tender in BIJNOR UP 2026?

Bidders must submit the bid along with EMD ₹9,000, GST, PAN, and turnover proofs. Include past fabrication experience with contract copies or client certificates. Ensure compliance with 25% quantity variation and delivery extension terms; upload all certificates per ATC and corrigenda.

What documents are required for UP sugar factories fabrication tender

Submit GST certificate, PAN, audited financial statements or CA certificate for turnover, contract/invoice proofs or client certificates for past experience, EMD payment proof, and technical bid documents. OEM authorizations may be needed if applicable; ensure all per ATC.

What are the delivery extension terms for pan house fabrication work

Delivery can extend based on the option clause: additional time = (increased quantity ÷ original quantity) × original period, with a minimum of 30 days. If the initial period is shorter than 30 days, the extension equals the original period.

What is the estimated contract value for this fabrication tender

The tender pegs an estimated value of ₹8,50,000 for the pan house fabrication package. The order may vary up to 25% in quantity during the contract, affecting total material and labor costs accordingly.

What qualifies as past project experience for this UP tender

Acceptable proof includes contract copies with invoices, client execution certificates, or third-party inspection notes indicating successful completion of similar fabrication work. Ensure documents clearly show scope, value, and completion dates.

What are the key eligibility criteria for bidders in this UP procurement

Meet turnover criteria over the last 3 financial years, provide audited statements or CA-certified turnover, and demonstrate past fabrication experience. Also must upload required certificates (GST, PAN) and comply with the ATC and Corrigenda.

How to ensure compliance with delivery and payment terms in this tender

Prepare a schedule aligning with delivery orders, noting the extension math for quantity changes. Ensure EMD payment is completed, and that payment terms in the contract are followed; verify all terms in ATC for payment timelines and milestones.