TenderDekho Logo
Active GEM

Bharat Heavy Electricals Limited Double Glass Covered Varnish Bonded Rectangular Hollow Copper Conductor Tender 2026

Bid Publish Date

24-Sep-2026, 8:55 am

Bid End Date

19-Oct-2026, 1:00 pm

Generate Docs

Progress

Issue24-Sep-2026, 8:55 am
Corrigendum15-Oct-2026
AwardPending

Tender Overview

Bharat Heavy Electricals Limited (BHEL) seeks procurement related to DOUBLE GLASS COVERED VARNISH BONDED RECT. HOLLOW COPPER CONDUCTOR. The scope references a product category aligned with high-grade conductors, with no BOQ items listed. The tender specifies a flexible quantity clause: up to 25% increase/decrease at award and during currency, at contracted rates. Delivery parameters hinge on the last date of the original delivery order, with minimum additional time of 30 days and computation formula: (increase in quantity ÷ original quantity) × original delivery period. Location details are not provided in the data. This ATC-informed tender emphasizes quantity-adjustment rights and schedule adjustments within defined limits, targeting suppliers capable of meeting BHEL’s copper conductor needs under stipulations of option clauses. The opportunity is positioned within government-aligned procurement channels, with ATC terms viewable in the uploaded document.

Technical Specifications & Requirements

  • Product: DOUBLE GLASS COVERED VARNISH BONDED RECT. HOLLOW COPPER CONDUCTOR
  • Construction: hollow copper conductor with varnish bonding and glass cover
  • Quantity flexibility: ± up to 25% during contract and currency
  • Delivery timing: starts from the last date of the original delivery order; extended time formula applies with minimum 30 days; additional time may extend to original delivery period
  • Documentation: ATC document available for bidder reference
  • BOQ: No items listed; no numerical BOM data provided
  • Standards/Testing: Not specified in the data available
  • Brand/OEM: Not specified
  • Location: Not specified in the tender data; refer to BHEL procurement portal for details
  • Experience: Not specified; rely on ATC guidance for eligibility

Terms, Conditions & Eligibility

  • Quantity flexibility: Purchaser may increase/decrease quantity up to 25% at contract award and during currency
  • Delivery period: Calculated as above with minimum extension of 30 days; extension logic applies if extended delivery period is exercised
  • Delivery start: Commences from the last date of original delivery order
  • Compliance: Bidders must comply with the option clause as part of the bid
  • EMD/Payment specifics: Not provided in the data; check terms in ATC document
  • Documentation: ATC document referenced; additional formalities to be clarified in tender terms
  • Warranty/Support: Not specified
  • Penalties: Not specified

Key Specifications

  • Product/service names: DOUBLE GLASS COVERED VARNISH BONDED RECTANGULAR HOLLOW COPPER CONDUCTOR

  • Quantity/Value: Not specified; BOQ contains 0 items

  • EMD/Value: Not specified

  • Delivery: Begins from last date of original delivery order; extended delivery may be calculated

  • Standards/Certifications: Not specified in provided data

  • Warranty/Support: Not specified

Terms & Conditions

  • Quantity adjustment rights up to 25% during contract

  • Delivery period adjustments with minimum 30 days, based on formula

  • Delivery starts from last date of original delivery order

Important Clauses

Payment Terms

Not specified in available data; refer to ATC document for payment terms

Delivery Schedule

Delivery period starts from last date of original delivery order; additional time calculated as (increase/original) × original period, minimum 30 days

Penalties/Liquidated Damages

Not specified in available data

Bidder Eligibility

  • Must comply with option clause allowing ±25% quantity adjustments

  • Delivery capability for copper conductors with varnish bonding and glass cover

  • Access to ATC document for bid submission guidance

Advertisement

Tender Data

Bid Details

Quantity

35515

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

DOUBLE GLASS COVERED VARNISH BONDED RECT. HOLLOW COPPER CONDUCTOR

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

7103

Delivery Locations

1

Delivery Cities

Haridwar

Delivery Pincodes

249403

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Paras249403,Shipping Section, Central Plant Stores, HEEP, BHEL, Haridwar-249403 UttarakhandHaridwarUttarakhand249403-7103-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9932465.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Corrigendum Updates

2 Updates
#1

Update

15-Oct-2026

Extended Deadline

19-Oct-2026, 7:30 am

Opening Date

20-Oct-2026, 7:30 am

#2

Update

03-Oct-2026

Extended Deadline

15-Oct-2026, 7:30 am

Opening Date

16-Oct-2026, 7:30 am

Advertisement

Categories 8

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Additional Doc 1 (Requested in ATC)

2

Additional Doc 2 (Requested in ATC)

3

Additional Doc 3 (Requested in ATC)

4

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for BHEL copper conductor tender 2026 in India?

Bidders must access the ATC document after registration, confirm eligibility for the 25% quantity option, and submit the required technical and financial bids per the tender terms. Ensure delivery capabilities align with the original delivery order timeline and the extension formula. Refer to the ATC for documentation specifics and submission deadlines.

What documents are required for the BHEL conductor tender 2026?

Submit business credentials, GST registration, PAN, company profile, past experience certificates on similar copper conductors, financial statements showing liquidity, and any OEM authorizations. Include the ATC document reference and confirmation of ability to handle 25% quantity variations as per contract terms.

What are the delivery terms for BHEL hollow conductor tender 2026 in India?

Delivery starts from the last date of the original delivery order. If quantity increases, extended time is calculated by the formula: (Increase ÷ Original) × Original delivery period, with a minimum extension of 30 days. The purchaser may extend delivery as per the option clause.

What standards or certifications are required for this BHEL copper conductor bid?

The tender data does not specify standards; bidders should refer to the ATC document uploaded by the buyer to verify any required certifications or quality assurances applicable to hollow copper conductors with varnish bonding and glass cover.

What is the 25% option clause in the BHEL conductor tender 2026?

The purchaser may increase or decrease the quantity by up to 25% at contract award and during the currency at contracted rates. Bidders must comply with this clause and adjust production to meet revised quantities without renegotiating price.

When will the BHEL procurement process for the conductor begin in 2026?

Start and end dates are not provided in the available data. Bidders should monitor the official BHEL procurement portal for updated timelines, submission deadlines, and access to the ATC document required for bidding.

How to ensure compliance with the ATC terms for this tender?

Download and review the ATC document attached by the buyer to confirm required documents, eligibility, and any special clauses. Ensure technical bids reflect the specified product name, and confirm capability to fulfill quantity variation and delivery terms.

What is the estimated value or EMD for this BHEL copper conductor tender?

The provided data does not include an estimated value or EMD amount. Bidders should check the ATC document and the procurement portal for the exact EMD requirements and estimated contract value before submission.

Advertisement