Bid Publish Date
18-Sep-2026, 4:31 pm
Bid End Date
28-Sep-2026, 5:00 pm
Location
Progress
Centre For Development Of Advanced Computing (cdac) in Thiruvananthapuram, Kerala 695001 seeks procurement and fabrication of XTBS RevB PCB including PCB fabrication, component procurement and PCB assembly. The tender notes a possible 25% quantity variation during contract placement or currency, with delivery timelines tied to the original order and extended periods. A detailed BOM is referenced in the ATC, but the BoQ lists zero items, indicating a BOM-driven specification rather than discrete line items. No start/end dates, estimated value, or EMD are disclosed in the provided data. The bid’s unique aspect lies in BOM-driven requirements and flexible quantity handling under the option clause, with delivery time calculations anchored to the original delivery period. This procurement targets a highly technical PCB project, likely requiring specialized fabrication and assembly capabilities.
XTBS RevB PCB fabrication and assembly scope
BOM-driven requirements per ATC attachment
No itemized BOQ; rely on BOM for quantities and parts
Potential 25% quantity variation under option clause
Delivery period calculations from last order date with minimum 30 days
Option clause allows ±25% quantity variation during contract
BOM-based scope; BOM attached in ATC
Delivery timelines anchored to original delivery period and extended periods
Delivery periods may extend with the option clause; minimum 30 days for added time; calculated as (increased quantity ÷ original quantity) × original delivery period
Bidders must adhere to BOM specifications attached in ATC; no separate BoQ items
Purchaser may increase/decrease quantity up to 25% at contract placement and during currency
Experience in PCB fabrication, component procurement, and PCB assembly
Capability to follow BOM-driven specifications and ATC terms
Compliance with local procurement rules and ability to supply to Thiruvananthapuram, Kerala
Quantity
4
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PCB Fabrication, Component Procurement and PCB Assembly of the XTBS RevB PCB.
Max Delivery Days
112
Delivery Locations
1
Delivery Cities
Thiruvananthapuram
Delivery Pincodes
695033
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Silpa V S | 695033,Purchase Department, Centre for Development of Advanced Computing, Vellayambalam | Thiruvananthapuram | Kerala | 695033 | 4 | 112 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for PCB fabrication/assembly
Financial statements or balance sheet for last 2-3 years
EMD/Security deposit (as per ATC/BOM terms)
Technical bid documents referencing BOM and ATC
OEM authorizations or commitments (if applicable)
Product/service compliance certificates (if any)
Key insights about KERALA tender market
Bidders must submit BOM-compliant proposals referencing the ATC document. Ensure PCB fabrication, component sourcing and assembly capabilities align with XTBS RevB requirements. Attach OEM authorizations, GST, PAN, financials, and EMD as specified in the ATC. Delivery terms follow the option clause up to 25% quantity variation.
Required documents typically include GST certificate, PAN card, experience certificates for PCB work, financial statements for the last 2-3 years, EMD, technical bid aligned with BOM, OEM authorizations, and any compliance certificates noted in the ATC. Ensure BOM/ATC references are included in the submission.
Key specs are BOM-driven and attached in ATC; no BoQ items are listed. Bidders must follow XTBS RevB PCB fabrication and assembly requirements per BOM, ensuring component procurement matches BOM part numbers and assembly steps outlined in the BOM document.
Delivery impact occurs at contract placement or currency renewal. The formula (increased quantity ÷ original quantity) × original delivery period applies, with a minimum extension of 30 days. If original period is under 30 days, the period remains the same.
Eligibility requires proven PCB fabrication/assembly capability, BOM-compliant processes, GST/PAN, financial stability evidence, and relevant experience certificates. OEM authorizations or commitments may be needed, along with BOM/ATC conformity as stipulated in the ATC documentation.
ATC documents and BOM details are attached within the tender’s ATC link. Access these files to align your technical proposal with XTBS RevB PCB requirements, verify part numbers, and confirm delivery timelines and 25% variation terms before submission.
The procurement is targeted to Thiruvananthapuram, Kerala, under the CDAC electronics initiative. The focus is PCB fabrication, component procurement and PCB assembly of the XTBS RevB PCB, with BOM-driven requirements and an option clause for quantity adjustments.