TenderDekho Logo
Closed GEM

Tender Notice for Development Cost,Take off and landing tower including anchor bolts,Driving Mechanism,Intermediate f in HARIDWAR, UTTARAKHAND

Bid Publish Date

24-Feb-2026, 1:44 pm

Bid End Date

17-Mar-2026, 3:00 pm

EMD

₹90,000

Progress

Issue24-Feb-2026, 1:44 pm
Technical17-03-2026 13:42:17
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

15

Category

Take off and landing tower including anchor bolts

Bid Type

Two Packet Bid

Categories 17

Indian Army has released a public tender for Development Cost, Take off and landing tower including anchor bolts, Driving Mechanism, Intermediate flexible connecting link, Load carrying basket with tension control link in HARIDWAR, UTTARAKHAND. Quantity: 15. Submission Deadline: 17-03-2026 15: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Development Cost , Take off and landing tower including anchor bolts , Driving Mechanism , Intermediate flexible connecting link , Load carrying basket with tension control link

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8992167.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Development Cost

As per technical Specifications

3 set Delivery: 180 days
#2

Take off and landing tower including anchor bolts

As per technical Specifications

3 set Delivery: 180 days
#3

Driving Mechanism

As per technical Specifications

3 set Delivery: 180 days
#4

Intermediate flexible connecting link

As per technical Specifications

3 set Delivery: 180 days
#5

Load carrying basket with tension control link

As per technical Specifications

3 set Delivery: 180 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-17-03-2026 13:42:17
2
**********   Under PMA
-16-03-2026 18:12:41
3
**********   Under PMA
-17-03-2026 00:13:25