Bid Publish Date
24-Feb-2026, 1:44 pm
Bid End Date
17-Mar-2026, 3:00 pm
EMD
₹90,000
Location
Progress
Quantity
15
Category
Take off and landing tower including anchor bolts
Bid Type
Two Packet Bid
Indian Army has released a public tender for Development Cost, Take off and landing tower including anchor bolts, Driving Mechanism, Intermediate flexible connecting link, Load carrying basket with tension control link in HARIDWAR, UTTARAKHAND. Quantity: 15. Submission Deadline: 17-03-2026 15: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Development Cost , Take off and landing tower including anchor bolts , Driving Mechanism , Intermediate flexible connecting link , Load carrying basket with tension control link
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Development Cost
As per technical Specifications
Take off and landing tower including anchor bolts
As per technical Specifications
Driving Mechanism
As per technical Specifications
Intermediate flexible connecting link
As per technical Specifications
Load carrying basket with tension control link
As per technical Specifications
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Development Cost | As per technical Specifications | 3 | set | juyal | 180 | |
| 2 | Take off and landing tower including anchor bolts | As per technical Specifications | 3 | set | juyal | 180 | |
| 3 | Driving Mechanism | As per technical Specifications | 3 | set | juyal | 180 | |
| 4 | Intermediate flexible connecting link | As per technical Specifications | 3 | set | juyal | 180 | |
| 5 | Load carrying basket with tension control link | As per technical Specifications | 3 | set | juyal | 180 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | - | 17-03-2026 13:42:17 | |
| 2 | ********** Under PMA | - | 16-03-2026 18:12:41 | |
| 3 | ********** Under PMA | - | 17-03-2026 00:13:25 |
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS