Tender Overview

Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow. Product category: Logic Ladder data logger. Procurement scope: Supply of goods only for data logging equipment; no BOQ items listed. Geography: Lucknow, Uttar Pradesh. Delivery/financial terms: 25% quantity option during contract; delivery period linked to last original delivery order; ATC terms apply. Differentiator: ATC clause allows dynamic quantity adjustments within contracted rates. The tender presents a streamlined goods-supply procurement with emphasis on compliance to optioned quantity and delivery calculations.

Technical Specifications & Requirements

  • No explicit product specifications are provided in the tender data.
  • Key contractual terms include:
    • Option Clause: Purchaser may increase/decrease quantity up to 25% of bid quantity at contract placement and during currency at contracted rates.
    • Delivery Calculation: If extended delivery time is exercised, additional time = (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days; original delivery period may be extended up to the original duration.
    • Scope: Scope of supply explicitly states Only supply of Goods.
  • Absence of BOQ items indicates a generic goods-procurement framework without itemized technical specs in the public data.
  • The buyer-provided ATC document is referenced, potentially containing additional compliance requirements.

Terms, Conditions & Eligibility

  • EMD/Financials: No EMD amount is specified in the available data. bidders should consult the ATC for exact bid security requirements.
  • Delivery: Delivery schedule is tied to the last date of the original delivery order with extension rules defined by the option clause.
  • Eligibility: Qualification appears to hinge on compliance with option clause and successful supply of goods; no explicit experience or turnover thresholds provided in the public excerpt.
  • Payment: Payment terms are not detailed in the provided data; bidders should examine the ATC document for terms.
  • Documentation: The tender references an ATC file; bidders must review the file for mandatory submission and OEM authorizations if applicable.
  • Warranty/Support: No warranty or post-sales terms are specified in the available information.
  • Penalties/LD: Not specified in the data; refer to ATC for any LD provisions.
  • Brand/OEM: No brand requirements are explicitly stated in the data.
  • Compliance: Ensure readiness to comply with the ATC and any other attached terms before submission.

Key Specifications

  • Product/service names: Logic Ladder data logger

  • Quantities: 25% quantity flex up/down during contract

  • Estimated value: Not disclosed in data

  • Delivery location: Lucknow, Uttar Pradesh

  • Quality/standards: Not specified in tender data; review ATC for standards

  • Warranty/AMC: Not specified

  • OEM/Brand: Not specified

Terms & Conditions

  • Option clause allows +/-25% quantity adjustments at contract and during currency

  • Delivery period recalculation uses (increased quantity ÷ original quantity) × original period with min 30 days

  • Scope limited to supply of goods only; no installation or services mentioned

  • Review ATC document for payment terms, EMD, and mandatory submission

  • No BOQ items or explicit technical specifications present in provided data

Important Clauses

Payment Terms

Payment terms are defined in the ATC document; bidders must consult the ATC for exact payment schedule and milestones.

Delivery Schedule

Delivery begins from the last date of the original delivery order; option clause may alter timelines with a minimum 30 days extension.

Penalties/Liquidated Damages

LD provisions are not specified in the public data; bidders should verify in ATC and submit proposals accordingly.

Bidder Eligibility

  • Competent to supply goods only (Logic Ladder data logger) as per ATC

  • Compliance with option-quantity adjustment clause up to 25%

  • Ability to deliver to Lucknow, Uttar Pradesh within specified lead times per ATC

  • Submission of required documents: GST, PAN, experience, financials, and OEM authorizations

Advertisement

Tender Data

Bid Details

Quantity

2

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Logic Ladder make Data Logger

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231225

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Jai Narayan231225,Anpara Thermal Power Plant, Anpara, SonebhadraSonbhadraUttar Pradesh231225290-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9961947.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Corrigendum Updates

2 Updates
#1

Update

15-Oct-2026

Extended Deadline

19-Oct-2026, 5:30 am

Opening Date

20-Oct-2026, 5:30 am

#2

Update

12-Oct-2026

Extended Deadline

15-Oct-2026, 5:30 am

Opening Date

16-Oct-2026, 5:30 am

Advertisement

Categories 23

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates relevant to data logger or industrial equipment supply

4

Financial statements or turnover evidence

5

EMD/Security deposit as per ATC (not specified in data)

6

Technical bid documents demonstrating compliance with ATC

7

OEM authorization (if bidding on behalf of OEM)

8

Manufacturer or supplier certifications referenced in ATC (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for the data logger tender in Lucknow?

Bidders must submit GST registration, PAN card, experience certificates, financial statements, EMD as per ATC, technical bid documents proving compliance with the ATC, OEM authorizations if bidding on behalf of the OEM, and any certifications referenced in the ATC. Check the ATC for exact formats.

How does the 25% quantity option affect delivery for the Lucknow bid?

The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during the contract, at contracted rates. If exercised, the delivery period is recalculated using the specified formula and a minimum of 30 days extension applies.

What is the scope of supply for this data logger procurement in UP?

The contract scope specifies Only supply of Goods for the Logic Ladder data logger. There is no installation, commissioning, or service work described in the public data; bidders should confirm detailed scope in the ATC.

When is delivery expected after the original delivery order for this tender?

Delivery starts from the last date of the original delivery order. If an extension is exercised due to quantity changes, the additional time equals (increased quantity ÷ original quantity) × original period, with a minimum 30 days and potential extension up to the original duration.

What standards or certifications are required for the data logger tender in Lucknow?

The public data does not specify standards; bidders must review the ATC for references to ISI, ISO, or OEM-certified requirements and ensure their products comply with those specified in the ATC document.

What are the key eligibility criteria for bidding on the UPRVUNL data logger tender?

Eligibility relies on compliance with the ATC, ability to supply goods to Lucknow, and submission of mandatory documents (GST, PAN, experience, financials, EMD per ATC). Specific turnover or years of experience are defined in the ATC.

How to submit the bid for the Uttar Pradesh data logger procurement?

Prepare a complete bid package with all required documents listed in the ATC, including technical compliance, OEM authorizations, and financials. Ensure quantities align with the 25% option clause and follow the submission format and deadlines outlined in the ATC.

What details will the ATC provide that are not in the public tender data?

The ATC will specify EMD amount, payment terms, detailed delivery schedule, exact technical specifications, brand/OEM requirements (if any), warranty, and LD provisions. Review it carefully to prepare compliant bids and avoid disqualification.

Advertisement