Progress
Numaligarh Refinery Limited invites bids for SITC of Inductively Coupled Plasma Mass Spectrometry (ICP-MS) in accordance with ASTM D8110 and ASTM D5673. Exact quantity is adjustable under the option clause with up to 25% increases/decreases at contracted rates. The contract emphasizes delivery timing linked to the original delivery order with a minimum additional time of 30 days. Financial standing requirements are enforced, including a prohibition on liquidation or bankruptcy, supported by an undertaking. GST handling is bidder’s responsibility with reimbursement aligned to actuals or applicable rates. This procurement carries a formal, policy-driven tender process and requires bidders to follow the detailed ATC and tender annexures. The BOQ shows zero items, indicating a procurement of a system or package rather than discrete line items. The absence of BOQ items implies a turnkey SITC contract for ICP-MS equipment and related services, with emphasis on compliance and delivery discipline.
ICP-MS SITC per ASTM D8110 and D5673
Turnkey procurement with no BOQ items
Quantity variation up to 25% during contract
Delivery period aligned to original delivery order with 30-day minimum extension
Bidder to manage GST and provide related documentation
ATC and annexures must be strictly followed
Option to adjust quantity up to 25% with corresponding delivery adjustments
Bidder must demonstrate clean financial standing (no liquidation)
GST obligations fall to bidder with reimbursement mechanics defined
GST handling by bidder; reimbursement based on actuals or lower quoted rate.
Delivery period starts from last date of original order; extended time minimum 30 days.
Penalties governed by detailed ATC and contract terms; not explicitly enumerated in data.
Not under liquidation, court receivership, or bankruptcy
Demonstrable experience in ICP-MS SITC or related equipment procurement
Financial statements demonstrating stability and ability to undertake turnkey SITC
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SITC of Inductively Coupled Plasma Mass Spectrometry (ICP- MS) as per ASTM D8110 and ASTM D5673.
Advisory Bank
AXIS BANK LTD
ePBG Percentage
3%
ePBG Duration (Months)
43
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Golaghat
Delivery Pincodes
785699
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Dibakar Barhoi | 785699,Numaligarh Refinery Limited, Chief General Manager (Commercial) PO-NRP, Numaligarh Warehouse office 03776-265562 | Golaghat | Assam | 785699 | 1 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
31-Aug-2026, 9:30 am
Opening Date
31-Aug-2026, 10:00 am
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates in ICP-MS or similar SITC
Financial statements (audited / latest)
Bid security / EMD documents as per tender
Technical bid documents and compliance sheets
OEM authorizations or certifications (if required by ATC)
Undertaking on bidder financial standing (not under liquidation)
Key insights about ASSAM tender market
Bidders should submit GST registration, PAN, financial statements, experience certificates for ICP-MS or similar SITC, EMD, OEM authorizations if required, and technical compliance sheets. Ensure adherence to ASTM D8110 and D5673, and accept the 25% quantity option with corresponding delivery adjustments.
Required documents include GST certificate, PAN, audited financials, bid security, experience certificates in ICP-MS SITC, technical bid, OEM authorization (if applicable), and undertaking on financial standing. All documents must align with the Buyer ATC and tender annexures.
The procurement references ASTM D8110 and ASTM D5673 for ICP-MS SITC. Bidders must demonstrate compliance with these standards and provide technical documentation proving instrument and method compatibility as per the ASTM scope.
Contract permits ±25% quantity change at contracted rates. Delivery period starts from the last date of the original order; if extended, the new period includes a minimum 30 days, with calculation: (additional quantity/original quantity) × original delivery period.
Bidders must determine their own GST and the purchaser will reimburse at actuals or the lower of the quoted GST rate, ensuring compliance with applicable GST regulations.
Bidders must be free of liquidation, provide an undertaking to this effect, demonstrate prior ICP-MS SITC experience, and present financial stability with audited statements; OEM authorizations may be required per ATC.
Zero BOQ items indicate a turnkey SITC package for ICP-MS equipment and services, with compliance to ASTM standards, rather than discrete line items; bidders should reflect full system supply, installation, and commissioning capabilities.
Key risks include adherence to ASTM D8110/D5673, acceptance of the 25% quantity option, accurate GST handling, and meeting the delivery schedule tied to the original order plus ATC-defined penalties.