Progress
The opportunity is issued by the Indian Army under the Department Of Military Affairs for an assortment of automotive/electrical components including SPRING BRAKE ACTUATOR, LOW OIL PRESSURE SWITCH, CABIN LOCK ASY, FILL PIPE ASY, COMBINATION SWITCH, SELF HOUSING, CARBON BUSH SET, ISOLATOR SWITCH, and PUSH BUTTON. Estimated value is ₹22,412.00 with a total of 9 items listed in the BOQ, though item-specific quantities are not disclosed. The procurement is framed as a multi-item supply contract with potential quantity variation up to 25% of bid quantity and extended delivery periods as per option clauses. The tender response must align with the attached ATC and the terms embedded in the Buyer Added Terms. The lack of item-specific technical specifications makes the emphasis on supplier capability and compliance critical. The location and start/end dates are not disclosed in the data provided, signaling a need for bidders to review the ATC for delivery-location guidance and timeframes.
Key differentiators include the option to scale quantities and the need to adhere to the ATC’s delivery-extension mechanism. This tender targets suppliers capable of multi-item automotive/industrial parts supply with alignment to military procurement processes. Unique clauses center on option-based quantity increases and period adjustments during contract execution.
Option to increase/decrease quantity up to 25% during contract and currency
Delivery period adjustments based on (Increased quantity ÷ Original quantity) × Original delivery period with min 30 days
Review ATC for all technical and compliance requirements
EMD and specific documents to be confirmed in ATC
Multi-item supply under a single contract with potential quantity variation
Adherence to military procurement terms and warranties/penalties to be specified in ATC
Payment terms to be defined in ATC; ensure alignment with Indian Army procurement practices and delivery milestones.
Delivery period governed by original order date; extended period calculated by option clause formula; minimum 30 days for extra time.
LD/penalties to be specified in ATC; confirm breach consequences and performance bonds in the bid.
Manufacturer or authorized dealer of SPRING BRAKE ACTUATOR and related automotive components
Experience in supplying multi-item military/defense-grade components
Valid GST registration and financial solvency documentation
Quantity
14
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
SPRING BRAKE ACTUATOR , LOW OIL PRESSURE SWITCH , CABIN LOCK ASSY , FILL PIPE ASSY , COMBINATION SWITCH , SELF HOUSING , CARBON BUSH SET , ISOLATOR SWITCH , PUSH BUTTON
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ambala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ambala | Ambala | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
SPRING BRAKE ACTUATOR
LV7/HMV
LOW OIL PRESSURE SWITCH
LV7/STLN
CABIN LOCK ASSY
LV7/STLN
FILL PIPE ASSY
LV7/HMV
COMBINATION SWITCH
LV7/TATA
SELF HOUSING
LV7/STLN
CARBON BUSH SET
LV7/TATA
ISOLATOR SWITCH
LV7/STLN
PUSH BUTTON
LV7/TATA
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SPRING BRAKE ACTUATOR | LV7/HMV | 1 | nos | financeclerk@948 | 15 | |
| 2 | LOW OIL PRESSURE SWITCH | LV7/STLN | 1 | nos | financeclerk@948 | 15 | |
| 3 | CABIN LOCK ASSY | LV7/STLN | 1 | nos | financeclerk@948 | 15 | |
| 4 | FILL PIPE ASSY | LV7/HMV | 2 | nos | financeclerk@948 | 15 | |
| 5 | COMBINATION SWITCH | LV7/TATA | 1 | nos | financeclerk@948 | 15 | |
| 6 | SELF HOUSING | LV7/STLN | 1 | nos | financeclerk@948 | 15 | |
| 7 | CARBON BUSH SET | LV7/TATA | 1 | nos | financeclerk@948 | 15 | |
| 8 | ISOLATOR SWITCH | LV7/STLN | 3 | nos | financeclerk@948 | 15 | |
| 9 | PUSH BUTTON | LV7/TATA | 3 | nos | financeclerk@948 | 15 |
Discover companies most likely to bid on this tender
GST certificate
Permanent Account Number (PAN) card
Experience certificates relevant to automotive/industrial components
Financial statements for last 2-3 years
EMD/Security deposit documentation (as per ATC)
Technical bid documents showing compliance with ATC
OEM authorization / authorized dealer certificates (if required)
Key insights about HARYANA tender market
Bid submission requires GST registration, PAN, and OEM authorizations; review the ATC for item-level quantities, delivery timelines, and EMD requirements. Ensure the technical bid demonstrates multi-item capability and compliance with military procurement standards, including any specific ISO or IS standards cited in the ATC.
Submit GST certificate, PAN, experience certificates for similar auto components, financial statements, EMD/security deposit as per ATC, technical compliance certificates, and OEM authorization(s) if mandated. Ensure a complete technical bid demonstrates capability to supply all nine listed items.
Standards are specified in the ATC; bidders must confirm IS/IS-related or military certification requirements. Where IS standards are indicated, ensure product conformity, testing reports, and traceability for each item, with OEM documentation to support compliance.
Delivery starts from the last date of the original delivery order; quantity adjustments up to 25% are allowed, with extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Review ATC for final timelines.
Estimated value is ₹22,412.00 for a total of 9 items including SPRING BRAKE ACTUATOR and auxiliary components. Exact item-wise quantities and delivery destinations are defined in the ATC; bidders should align with the multi-item supply requirement.
Obtain OEM authorization letters specific to each item (or blanket authorization for multi-item supply), provide manufacturer’s technical datasheets, and confirm conformity with ATC standards. Include warranty terms, service commitments, and post-sale support aligned with defense procurement norms.