GEM

Nuclear Power Corporation Of India Limited Scissor Lift (V2) Tender 2025 in India with IS/ATC Compliance for Department of Atomic Energy

Bid Publish Date

11-Dec-2025, 11:45 am

Bid End Date

22-Dec-2025, 11:00 am

EMD

₹28,031

Progress

Issue11-Dec-2025, 11:45 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • SCISSOR LIFT (V2) with Q3 category and end-to-end scope: supply, installation, testing and commissioning
  • Minimum average annual turnover: ₹5,75,250 for 3 consecutive financial years
  • Past experience: proof of PO and installation/completion certificates for similar scissor-lift projects in last 3 years
  • EMD amount: ₹28,031; security may be offered as Insurance Surety Bond per new government guidelines
  • Delivery clause: 25% quantity variation allowed; extended delivery time formula with minimum 30 days
  • ATC compliance: product must adhere to buyer-uploaded ATC document; ISI/ISO not explicitly stated
  • Documentation: signed and sealed bid documents excluding price schedule; OEM authorizations if required
  • No BOQ items listed; emphasis on supply, installation, testing and commissioning

Categories 6

Tender Overview

Nuclear Power Corporation Of India Limited (Department Of Atomic Energy) invites bids for the Scissor Lift (V2) (Q3), with scope covering Supply, Installation, Testing and Commissioning. The EMD is ₹28,031. The tender requires bidders to demonstrate a minimum average annual turnover of ₹5,75,250 over the last three financial years and proof of PO/installation reports for similar scissor-lift projects. The tender notes an option clause for quantity variation up to 25% and a flexible delivery window tied to original delivery timelines. Bidders must align with the bidder-specific ATC, and the product must comply with the uploaded ATC document. Location details are not specified in the data provided.

Technical Specifications & Requirements

  • Product/Service: Scissor Lift (V2), Q3 category, with supply, installation, testing and commissioning scope.
  • EMD: ₹28,031 (as security for bid).
  • Turnover requirement: ₹5,75,250 per year average over 3 financial years (2022-23 to 2024-25).
  • Experience requirement: At least 3 years in similar work (supply, installation, commissioning of scissor lifts) with PO and completion/installation reports.
  • ATC/Compliance: Product must comply with the buyer-uploaded ATC document; insurance/surety bonds accepted per Department of Expenditure OM amendments.
  • Delivery/Option Clause: 25% quantity variation allowed; delivery period linked to original order timing with calculated extra time formula and minimum 30 days.
  • Documentation: All bid documents (except price schedule) must be signed and sealed by authorized signatory; submission must include required experience proofs and turnover statements.
  • BoQ: No BOQ items listed; scope emphasizes supply, installation and testing/commissioning of scissor lifts.

Terms, Conditions & Eligibility

  • EMD: ₹28,031; payment security can be through insurance bond per new guidelines.
  • Average Turnover: ₹5,75,250/year over the last 3 financial years; documentary proof required.
  • Past Experience: Minimum of 3 years in similar scope (scissor lifts) with PO and installation/completion certificates.
  • Delivery Terms: Option to extend quantity by up to 25% at contracted rates; delivery period calculated as per clause, with minimum 30 days.
  • ATC/Technical Note: Product must meet all specifications in the ATC; non-submission of timely clarifications may affect evaluation.
  • Documentation: Include GST, PAN, experience certificates, financial statements, EMD receipt, OEM authorization if applicable, and technical compliance certificates.

Key Specifications

  • Product: Scissor Lift (V2) - Q3 category

  • Scope: Supply, Installation, Testing and Commissioning

  • EMD: ₹28,031

  • Average turnover: ₹5,75,250/year (last 3 years)

  • Experience: 3 years in similar scissor-lift supply/installation/commissioning

  • ATC compliance: Adhere to Buyer Uploaded ATC Document

  • Delivery: Option to increase quantity by 25%; minimum delivery extension 30 days

Terms & Conditions

  • EMD amount and acceptable security form per amendments

  • Turnover and experience thresholds with supporting documents

  • ATC compliance and submission requirements

  • 25% quantity variation and calculated delivery extension

Important Clauses

Payment Terms

Security deposit via EMD ₹28,031; insurance surety bonds acceptable per DoE guidelines

Delivery Schedule

Delivery period linked to original order; additional time calculated as (additional quantity/original quantity) × original period, minimum 30 days

Penalties/Liquidated Damages

Not specified in data; adherence to ATC and timely delivery implied through contract terms

Bidder Eligibility

  • Average annual turnover ≥ ₹5,75,250 in each of the last 3 financial years

  • Past experience in supply/installation/commissioning of scissor lifts (3 years) with PO and completion reports

  • Submission of EMD ₹28,031 and relevant security documents

Past Similar Tenders (Historical Results)

5 found

Scissor Lift (V2)

South Western Railway

Posted: 13 November 2024
Closed: 23 November 2024
GEM

Scissor Lift (V2)

Indian Space Research Organization

Posted: 11 November 2024
Closed: 21 November 2024
GEM

Scissor Lift (V2)

Indian Space Research Organization

Posted: 11 November 2024
Closed: 21 November 2024
GEM

Scissor Lift (V2)

Indian Navy

Posted: 31 October 2024
Closed: 30 November 2024
GEM

Scissor Lift (V2)

South Western Railway

BANGALORE, KARNATAKA

Posted: 25 August 2025
Closed: 4 September 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Past three years’ turnover proof (audited financial statements or CA-certified statements)

4

PO copies and installation/completion certificates for similar past projects (scissor lifts)

5

EMD submission receipt (₹28,031) and security document (insurance bond acceptable)

6

Technical compliance certificates and OEM authorizations (if applicable)

7

Bidder authorization letter for signatory and company seal

8

Any ATC-specific documents uploaded by the purchaser

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid on the scissor lift tender in India for NPCL 2025?

Bidders must meet the turnover and experience criteria, submit EMD ₹28,031, and provide PO and completion certificates for similar scissor-lift projects. Include OEM authorizations if required and comply with the Buyer Uploaded ATC Document. Ensure all documents are signed and sealed before bid submission.

What documents are required for NPCL scissor lift procurement 2025?

Submit GST, PAN, three-year turnover proofs, PO/installation reports, EMD receipt, financial statements, technical compliance certificates, OEM authorization, and authorized signatory authorization. Include ATC-specific documents uploaded by NPCL in the tender portal.

What are the key eligibility criteria for NPCL scissor lift bid 2025?

Eligibility requires average annual turnover ≥ ₹5,75,250 over 2022-23 to 2024-25 and minimum 3 years of experience in supply, installation, and commissioning of scissor lifts, supported by PO and installation/completion certificates.

What is the EMD for the NPCL scissor lift tender and acceptable security?

EMD is ₹28,031. Acceptable security forms include Insurance Surety Bonds as per Department of Expenditure guidance, along with traditional bank guarantees, DDs, or FDRs where permitted.

What delivery terms apply to the NPCL scissor lift tender?

Quantity may be increased by up to 25% at contracted rates. Delivery time extends from the original delivery date with a minimum extension of 30 days; extended periods are calculated by the formula provided in the clause.

What specifications must the scissor lift meet for NPCL 2025?

Product must comply with the Buyer Uploaded ATC Document; specific ISI/ISO standards are not listed. Ensure all ATC-specified performance, safety and installation criteria are met before submission.