Bid Publish Date
26-Jun-2025, 1:54 pm
Bid End Date
08-Jul-2025, 2:00 pm
EMD
₹1,94,000
Location
Progress
A tender has been published for Nagar Panchayat Agwanpur Moradabad Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3) in MORADABAD, UTTAR PRADESH. Quantity: 64 by. Submission Deadline: 08-07-2025 14: 00: 00. Check eligibility and apply.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | DREAM R SOLUTIONS Under PMA | Make : NA Model : Octagonal Pole With Single Arm Or Double Arm Brack | 07-07-2025 19:03:44 | |
| 2 | RUDRA ENTERPRISES Under PMA | Make : NA Model : Octagonal Pole With Single Arm Or Double Arm Brack | 07-07-2025 19:43:47 | |
| 3 | SHREE CONSTRUCTION Under PMA | Make : NA Model : Octagonal Pole With Single Arm Or Double Arm Brack | 08-07-2025 00:13:53 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SHREE CONSTRUCTION Under PMA | Item Categories : Octagonal Pole with Single Arm or Double Arm Brackets (V2) | |
| L2 | DREAM R SOLUTIONS Under PMA | Item Categories : Octagonal Pole with Single Arm or Double Arm Brackets (V2) | |
| L3 | RUDRA ENTERPRISES Under PMA | Item Categories : Octagonal Pole with Single Arm or Double Arm Brackets (V2) |
Please sign in or create an account to view contract details and download result documents.
Quantity
64
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
17
OEM Avg. Turnover
70
Past Performance
50 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Octagonal Pole with Single Arm or Double Arm Brackets (V2) (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about UTTAR PRADESH tender market
The eligibility requirements include being a registered entity with the legal capacity to fulfill contractual obligations, having the necessary approval and licenses, and demonstrating previous experience in delivering similar projects.
Bidders must provide relevant certification that demonstrates compliance with industry standards. This may include quality assurance certifications, safety certifications, and other documents validating their capabilities and operational standards.
To register for the tender, prospective bidders should visit the appropriate online procurement portal. Registration typically involves creating an account, submitting required information, and verifying credentials as specified by the Urban Development Department.
Documents must be submitted in universally accepted formats such as PDF, Word, or Excel. It is critical to verify specific requirements in the tender notice to ensure compliance and avoid disqualification during the submission process.
MSEs are granted certain advantages during the evaluation process. This support may include preferential pricing considerations or reduced compliance burdens to encourage their participation in public procurement, reflecting government efforts to stimulate local economic growth.
These FAQs address key points of interest for potential bidders and provide valuable insights into the tendering process, enhancing understanding and accessibility for all stakeholders involved.