Progress
Goa Shipyard Limited invites bids for the supply of Tarpaulins Made from High Density Polyethylene (HDPE) Woven Fabrics conforming to IS 7903 (Q3). The tender scope is restricted to the purchase of goods (tarpaulin fabric and finished tarpaulins) for procurement needs in Goa, India. While the BOQ shows zero items, the buyer emphasizes IS 7903 Q3 compliance and HDPE woven fabric construction as the core specification. The tender distinguishes GST handling and emphasizes vendor GST documentation, with purchase preference for MSEs as per policy. A unique clause allows quantity fluctuations up to 50% at contract award and during currency, with pro-rated delivery time. The procurement aims to ensure standard-compliant tarpaulin supplies for defence production-related use and may involve GeM invoice requirements and GST payment verification. The key differentiator is the explicit IS 7903 Q3 standard and the option-based quantity adjustments aligned with government procurement norms.
Product/service: Tarpaulins made from HDPE woven fabrics
Category standard: IS 7903 (Q3) compliant
Mass specification: Type based on mass in g/m²
Delivery: Pure supply of goods; installation/delivery terms governed by contract
GST payable at actual or applicable rate; whichever lower
EMD details not provided; bidders must comply with vendor creation docs
Option to adjust quantity up to 50% during and after contract
GST invoicing via GeM; GST payment proof required; amount payable as per contract terms
Delivery period can be adjusted under option clause; minimum 30 days extra time when applicable
Not explicitly stated; refer to standard vendor agreement and GeM terms
Manufacturer of the offered HDPE tarpaulins (MSE preference applicable)
GST registered with valid GSTIN
Demonstrated experience in supplying IS 7903 compliant tarpaulins
Quantity
87097
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Tarpaulins Made from High Density Polyethylene (HDPE) Woven Fabrics (V3) Conforming to IS 7903 (Q3)
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
730
Delivery Locations
1
Delivery Cities
SOUTH GOA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SOUTH GOA | SOUTH GOA | - | - | 87097 | 730 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate copy certified by bank
GST invoice copy and GST portal payment confirmation (GeM)
| Category | Specification | Requirement |
|---|---|---|
| Generic Requirement | Type, based on the mass, in g/m², | Type I — Having mass of 200 g/m², Min |
Key insights about GOA tender market
Bidders must register via GeM, submit PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure IS 7903 (Q3) compliance for HDPE woven tarpaulins, provide GST invoice proof, and be prepared for 50% quantity variation. Manufacturer status is required for MSE preference eligibility.
Submit PAN card, GSTIN, cancelled cheque, EFT mandate, and GST invoice proof. If claiming MSE preference, provide proof of manufacturing capability and relevant documentary evidence; ensure IS 7903 conformity and HDPE fabric details.
Tarpaulins must conform to IS 7903 (Q3) and be made from HDPE woven fabric. Mass specification will be per g/m², with product type defined in the tender. Ensure the fabric and finished tarpaulins meet the IS 7903 Q3 requirements.
The purchaser may adjust quantities up to 50% at contract placement and during currency. Delivery time is calculated using the extended period formula, with a minimum 30-day extension for added quantity scenarios.
Upload a scanned GST invoice and a GST portal payment confirmation screenshot on GeM. GST handling follows either actuals or the applicable rate, whichever is lower, as per the buyer’s terms.
MSE preference applies only if the bidder is the manufacturer of the offered tarpaulins. If L-1 price is outside MSE margin, the MSE seller may be invited to match L-1 price for up to 25% contract value.
The procurement centers on Tarpaulins made from HDPE woven fabrics, conforming to IS 7903 (Q3) standards, intended for government/defense production use in Goa.
GST-based invoicing via GeM with GST payment proof is required. The tender specifies GST handling by actuals or applicable rates and requires the GST invoice to be uploaded during bid submission and invoicing.