Progress
Quantity
31
Category
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5624-00-00- 000-00-1 INCL RAW MATERIALS
Bid Type
Two Packet Bid
Hindustan Aeronautics Limited (hal) invites bids for EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5624-00-00- 000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5739-00-00-000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5739-00-00-000-20-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5679-00-00-000-10- 1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5679-00-00-000-20-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5693-00-00- 000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5693-00-00-000-20-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5691-00-00-000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5692-00-00-000-00- 1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5148-00-00-000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5768-00-00- 000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5768-00-00-000-20-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5769-00-00-000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5769-00-00-000-20- 1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5770-00-00-000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5771-00-00- 000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5772-00-00-000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5853-00-00-000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5853-00-00-000-20- 1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5854-00-00-000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5854-00-00- 000-20-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5715-00-00-000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5715-00-00-000-20-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5855-00-00-000-00- 1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5871-00-00-000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6223-00-00- 000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5872-00-00-000-00-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5075-00-00-000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5075-00-00-000-20- 1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6293-00-00-000-10-1 INCL RAW MATERIALS, EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6293-00-00- 000-20-1 INCL RAW MATERIALS in BANGALORE, KARNATAKA. Quantity: 31. Submission Deadline: 21-02-2025 18: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5624-00-00- 000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5739-00-00-000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5739-00-00-000-20-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5679-00-00-000-10- 1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5679-00-00-000-20-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5693-00-00- 000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5693-00-00-000-20-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5691-00-00-000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5692-00-00-000-00- 1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5148-00-00-000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5768-00-00- 000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5768-00-00-000-20-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5769-00-00-000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5769-00-00-000-20- 1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5770-00-00-000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5771-00-00- 000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5772-00-00-000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5853-00-00-000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5853-00-00-000-20- 1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5854-00-00-000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5854-00-00- 000-20-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5715-00-00-000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5715-00-00-000-20-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5855-00-00-000-00- 1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5871-00-00-000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6223-00-00- 000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5872-00-00-000-00-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L- 5075-00-00-000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5075-00-00-000-20- 1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6293-00-00-000-10-1 INCL RAW MATERIALS , EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6293-00-00- 000-20-1 INCL RAW MATERIALS
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5624-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5739-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5739-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5679-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5679-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5693-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5693-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5691-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5692-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5148-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5768-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5768-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5769-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5769-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5770-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5771-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5772-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5853-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5853-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5854-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5854-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5715-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5715-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5855-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5871-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6223-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5872-00-00-000-00-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5075-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5075-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6293-00-00-000-10-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6293-00-00-000-20-1 INCL RAW MATERIALS
EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5624-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 2 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5739-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 3 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5739-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 4 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5679-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 5 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5679-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 6 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5693-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 7 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5693-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 8 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5691-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 9 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5692-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 10 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5148-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 11 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5768-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 12 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5768-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 13 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5769-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 14 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5769-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 15 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5770-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 16 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5771-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 17 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5772-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 18 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5853-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 19 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5853-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 20 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5854-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 21 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5854-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 22 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5715-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 23 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5715-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 24 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5855-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 25 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5871-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 26 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6223-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 27 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5872-00-00-000-00-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 28 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5075-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 29 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5075-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | set | ardcmanagerstores | 70 | |
| 30 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6293-00-00-000-10-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 | |
| 31 | EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-6293-00-00-000-20-1 INCL RAW MATERIALS | EP25 3 DESIGN FAB CERT AND SUPPLY OF SHEET METAL FORMING TOOLS AND HOLDING BLOCKS INCL RAW MATERIALS | 1 | piece | ardcmanagerstores | 70 |
Extended Deadline
21-Feb-2025, 6:00 pm
Opening Date
21-Feb-2025, 6:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ASHA ENGINEERING WORKS Under PMA | - | 12-02-2025 18:51:05 | |
| 2 | NAGASAI PRECITECH PRIVATE LIMITED Under PMA | - | 21-02-2025 15:00:50 | |
| 3 | SOFTEC SERVICES Under PMA | - | 20-02-2025 10:46:52 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ASHA ENGINEERING WORKS(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5624-00-00-000-00-1 INCL RAW MATERIALS,EP25 3 DESIGN FAB C | |
| L2 | SOFTEC SERVICES (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5624-00-00-000-00-1 INCL RAW MATERIALS,EP25 3 DESIGN FAB C | |
| L3 | NAGASAI PRECITECH PRIVATE LIMITED (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : EP25 3 DESIGN FAB CERT AND SUPPLY OF 12L-5624-00-00-000-00-1 INCL RAW MATERIALS,EP25 3 DESIGN FAB C |
Key insights about KARNATAKA tender market
The eligibility requirements include being a registered entity with a valid GST registration. Bidders must also demonstrate relevant experience in the fabrication and supply of sheet metal tools. Moreover, compliance with local manufacturing initiatives like Make in India is essential for qualification.
Bidders are required to submit their tender applications along with vital documents such as certificates of compliance, financial proposals, and detailed technical specifications. It is crucial that these documents are submitted in accepted formats, including .PDF and .DOCX files, to ensure validity during the review process.
Bidders must comply with the technical specifications outlined in the tender documentation, which entail criteria for material durability, performance standards, and safety measures. Continuous compliance with established quality standards will be evaluated through submitted documentation and product inspection prior to delivery.
Yes, an Earnest Money Deposit (EMD) is mandatory for all bidders. The amount is specified in the tender details. This deposit serves as a financial guarantee that the bidder will adhere to the tender conditions and will be returned post-evaluation or adjusted towards the contract value.
Yes, provisions are made within this tender to support Micro, Small, and Medium Enterprises (MSEs) and startups. Such entities are encouraged to participate actively, benefitting from policies designed to enhance local manufacturing and procurement participation as part of the Make in India initiative, ensuring that MSEs have equitable opportunities in tender assessments.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS