TenderDekho Logo
GEM

Invitation to Bid - Rocker arm assy,Valve Exhaust,Valve intake,Seal valve stem oil,Spark plug,Plug cylinder head,Sprock in Fazilka, PUNJAB

Bid Publish Date

18-Dec-2024, 10:04 am

Bid End Date

08-Jan-2025, 11:00 am

Progress

Issue18-Dec-2024, 10:04 am
Technical01-Jun-2025, 10:40 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

452

Category

Rocker arm assy

Bid Type

Two Packet Bid

Categories 141

AGITATORS WORM PUMPS WIND MILL ENERGY PROJECT CABIN MILD STEEL PIPE AXLE ALTERNATOR MARINE ENGINEER MISCELLANEOUS VALVE ADJUSTER SHAFT SUPPLY ANGLE GLOBE VALVES BULB RING SEARCH LIGHT CONING OIL MS PIPE AIR CYLINDERS VEHICLE PERISTALTIC PUMPS AIR COOLED ENGINE DESERT COOLER JCB SENSOR MOBIL OIL SPROCKET AGRICULTURAL MACHINERY BEARINGS BUSHINGS AND GEARS SPRAYER AGRICULTURE EQUIPMENT DIRECT TRANSFORMER LUBRICATING OILS CHANNEL ARC VALVE KAJUKATARI HARDWARE AND FASTENERS PUMP REPAIR KITS GEYSER SPHERICAL BEARING BLADE SUPPLY OF SCHOOL UNIFORM RIVETS VEHICLE ACCESSORIES AND COMPONENT RUBBER GASKET ELBOW RF CABLE ALTERNATOR FLANGE STATIC CONVERTERS SYNCHRONOUS MOTORS ENGINE PARTS MILITARY VEHICLE ENGINE OIL BRUSH HOLDER PRESSURE WASHER NOZZLE ACTUATOR ENGINE SOCKET POWER MOULDED ITEM SEALING RING WINDOW MACHINE OIL BRAKE LINING TAIL LAMP GI PIPE BLASTING MACHINE FLOW REGULATOR HYDRAULIC BRAKE PETROLEUM FUELS FITMENT COMPRESSED AIR SHIELDED CABLE AIRCRAFT WINDOWS MARINE TRANSPORT VEHICLE FALL PROTECTION LANYARD ROTATING PISTON PUMPS MACHINE BELT ALTERNATING CURRENT MOTOR BEAM IRRADIATION PNEUMATIC VALVES ROLLER BEARING PUMP VALVES PNEUMATIC LUBRICANT PRODUCT ROTARY CAM PUMPS VALVES GASKETS AND SEALS PLAIN BEARING WHEEL BEARING AC MOTORS TUBE WATER GENERATOR TRANSPORTATION OF DIESEL VALVE FILTER RETAINERS GEAR PINCH VALVES AIR GENERATOR PIN BUSH COUPLING PISTON VALVES SOLENOID VALVES WORM GEAR TURBINE PUMPS VACUUM CENTRIFUGES BUSHING EXHAUST SYSTEM FLUORESCENT LAMP SLIDER VALVES BRAKE MAGNETIC PROGRESSIVE CAVITY PUMPS BOILER MOUNTING VALVE ROTARY VANE PUMPS DIAPHRAGM PUMPS CABLE BUILDING AUTOMATION AGRICULTURAL EQUIPMENT LUBE OIL STARTER MS PIPE LINE RECTIFIERS GAS PIPELINE FILTERS VALVE PARTS AND ACCESSORIES SOLID ROCKET MOTORS WATER COOLED ENGINE AUTOMOTIVE CABLE FLEXIBLE PIPE PURE ELEMENTAL GASES PULLING MACHINE PHOTOGRAPHIC CAMERAS BOILER VALVE MATERIAL TRANSPORT VEHICLES TEA KETTLE WATER PUMP BAR LUBRICANT BEARING ROLLER BUSH SLEEVE BEARING GALVANIZED IRON PIPE

Border Security Force (bsf) announces a tender for Rocker arm assy, Valve Exhaust, Valve intake, Seal valve stem oil, Spark plug, Plug cylinder head, Sprock in Fazilka, PUNJAB. Quantity: 452. Submission Deadline: 08-01-2025 11: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF HOME AFFAIRSBORDER SECURITY FORCE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7264070.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 155 Items Sign in for GEM prices

#1

Rocker arm assy

tvs apache rtr 160

1 no Delivery: 15 days
#2

Valve Exhaust

tvs apache rtr 160

1 no Delivery: 15 days
#3

Valve intake

tvs apache rtr 160

1 no Delivery: 15 days
#4

Seal valve stem oil

tvs apache rtr 160

2 no Delivery: 15 days
#5

Spark plug

tvs apache rtr 160

1 no Delivery: 15 days
#6

Plug cylinder head

tvs apache rtr 160

1 no Delivery: 15 days
#7

Sprocket cam shaft 32 Teeth

tvs apache rtr 160

1 no Delivery: 15 days
#8

Cam chain camshaft driver

tvs apache rtr 160

1 no Delivery: 15 days
#9

O Ring Inspection hole cap

tvs apache rtr 160

2 nos Delivery: 15 days
#10

Adjuster assembly tensioner

tvs apache rtr 160

1 no Delivery: 15 days
#11

Cylinder block complete RTR 160

tvs apache rtr 160

1 kit Delivery: 15 days
#12

Connecting rod kit RTR160

tvs apache rtr 160

1 kit Delivery: 15 days
#13

Pump assembly oil

tvs apache rtr 160

1 no Delivery: 15 days
#14

O Ring Drain plug plate

tvs apache rtr 160

1 no Delivery: 15 days
#15

Gasket OIL Pipe UNION OIL PIPEP BENJO

tvs apache rtr 160

6 nos Delivery: 15 days
#16

O Ring oil Filter Cap

tvs apache rtr 160

1 nos Delivery: 15 days
#17

Filter complete engine oil

tvs apache rtr 160

1 no Delivery: 15 days
#18

Hub Clutch

tvs apache rtr 160

1 no Delivery: 15 days
#19

Set plate clutch drive

tvs apache rtr 160

5 no Delivery: 15 days
#20

Set plate clutch driven

tvs apache rtr 160

4 nos Delivery: 15 days
#21

Gear assembly primary driven

tvs apache rtr 160

1 no Delivery: 15 days
#22

Clutch starter one way

tvs apache rtr 160

1 set Delivery: 15 days
#23

Rotor Assembly magneto

tvs apache rtr 160

1 no Delivery: 15 days
#24

CRR Pan head screw M6X25

tvs apache rtr 160

2 nos Delivery: 15 days
#25

Hex flange bolt M8X25 silencer bolt 12MM

tvs apache rtr 160

1 no Delivery: 15 days
#26

Filter complete Air Cleaner

tvs apache rtr 160

1 no Delivery: 15 days
#27

Gear complete kick starter idler 26 Teeth

tvs apache rtr 160

1 no Delivery: 15 days
#28

Gear shift linkage assembly

tvs apache rtr 160

1 no Delivery: 15 days
#29

Hose fuel

tvs apache rtr 160

1 no Delivery: 15 days
#30

Clutch cable assembly

tvs apache rtr 160

1 no Delivery: 15 days
#31

Mirror assembly LH Side

tvs apache rtr 160

1 no Delivery: 15 days
#32

Steering cone kit

tvs apache rtr 160

1 kit Delivery: 15 days
#33

Oil Seal front fork

tvs apache rtr 160

2 nos Delivery: 15 days
#34

Fork oil

tvs apache rtr 160

2 bottle Delivery: 15 days
#35

Carburettor assembly RTR160

tvs apache rtr 160

1 no Delivery: 15 days
#36

Hex Socket head cap screw M6

tvs apache rtr 160

3 nos Delivery: 15 days
#37

Chain sprocket kit RTR160

tvs apache rtr 160

1 kit Delivery: 15 days
#38

Electronic flasher unit

tvs apache rtr 160

1 no Delivery: 15 days
#39

Complete gasket set

tvs apache rtr 160

1 set Delivery: 15 days
#40

Complete oil seal set

tvs apache rtr 160

1 set Delivery: 15 days
#41

Starter assembly 08 poles

tvs apache rtr 160

1 no Delivery: 15 days
#42

Fuel sending assembly

tvs apache rtr 160

1 no Delivery: 15 days
#43

Turn signal lamp front RH

tvs apache rtr 160

1 no Delivery: 15 days
#44

Turn signal lamp assembly Rear RH

tvs apache rtr 160

1 no Delivery: 15 days
#45

Turn Signal lamp assembly Rear LH

tvs apache rtr 160

1 no Delivery: 15 days
#46

Spring Stop lamp switch

tvs apache rtr 160

1 no Delivery: 15 days
#47

Oil Seal

tata 1212 tc water tanker

2 nos Delivery: 15 days
#48

Oil Seal front hub inner

tata 1212 tc water tanker

2 nos Delivery: 15 days
#49

Gasket cover to Hub

tata 1212 tc water tanker

2 nos Delivery: 15 days
#50

Set of brake Lining Wheel Set Rear SD

tata 1212 tc water tanker

1 set Delivery: 15 days
#51

Rivets

tata 1212 tc water tanker

80 nos Delivery: 15 days
#52

Brake Actuator 24BY75

tata 1212 tc water tanker

1 no Delivery: 15 days
#53

Assy Nylon Pipe

tata 1212 tc water tanker

2 mtr Delivery: 15 days
#54

Front Hub Check nut locking plate

tata 1212 tc water tanker

2 nos Delivery: 15 days
#55

Kit Brake Lining front STD per Axle 08 Nos Shoe and 80 Nos Rivit

tata 1212 tc water tanker

2 set Delivery: 15 days
#56

Belt V Ribbed

tata 1212 tc water tanker

1 no Delivery: 15 days
#57

Air Filter Element primary

tata 1212 tc water tanker

1 no Delivery: 15 days
#58

Water Filling pipe

tata 1212 tc water tanker

1 no Delivery: 15 days
#59

Oil seal

tata 1212 tc water tanker

1 no Delivery: 15 days
#60

Oil Seal

tata 1212 tc water tanker

2 nos Delivery: 15 days
#61

Assy Universal Joint Long Fork Complete

tata 1212 tc water tanker

1 no Delivery: 15 days
#62

Assy Cross Kit

tata 1212 tc water tanker

1 no Delivery: 15 days
#63

Propeller shaft Dust Boot With Clamp

tata 1212 tc water tanker

2 no Delivery: 15 days
#64

Locking Plate Propeller Shaft Fitment

tata 1212 tc water tanker

10 nos Delivery: 15 days
#65

Bolt Prop. Shaft Fitment

tata 1212 tc water tanker

10 nos Delivery: 15 days
#66

Assy U J Steering

tata 1212 tc water tanker

1 no Delivery: 15 days
#67

Ball Socket Head Assy

tata 1212 tc water tanker

2 nos Delivery: 15 days
#68

Magnetic Drain Plug

tata 1212 tc water tanker

2 nos Delivery: 15 days
#69

Oil Seal Hub Outer

tata 1212 tc water tanker

2 nos Delivery: 15 days
#70

Cover For Accelerator Pedel

tata 1212 tc water tanker

1 no Delivery: 15 days
#71

Taper Roller Bearing Outer

tata 1212 tc water tanker

1 no Delivery: 15 days
#72

Assy Combination Switch 24V

tata 1212 tc water tanker

1 no Delivery: 15 days
#73

Hazard Switch 24V

tata 1212 tc water tanker

1 no Delivery: 15 days
#74

Cabin Upper parking Light Assy

tata 1212 tc water tanker

2 nos Delivery: 15 days
#75

Wiper Wind Shield nozzle

tata 1212 tc water tanker

2 nos Delivery: 15 days
#76

Bulb 67 No 24V

tata 1212 tc water tanker

4 nos Delivery: 15 days
#77

Assy Wiper Blade

tata 1212 tc water tanker

2 nos Delivery: 15 days
#78

Cabin Light assy With bulb 24V

tata 1212 tc water tanker

1 no Delivery: 15 days
#79

MS pipe 1inch

tata 1212 tc water tanker

6 feet Delivery: 15 days
#80

Ball valve 1 inch

tata 1212 tc water tanker

1 no Delivery: 15 days
#81

Ball valve 2 inch

tata 1212 tc water tanker

1 no Delivery: 15 days
#82

GI pipe 1 inch

tata 1212 tc water tanker

4 feet Delivery: 15 days
#83

GI elbow 1 inch

tata 1212 tc water tanker

1 no Delivery: 15 days
#84

Assy Handle Window Winding

tata 1212 tc water tanker

1 no Delivery: 15 days
#85

Gasket cylinder head mis

tata xenon

1 no Delivery: 15 days
#86

Cam Shaft Oil Seal

tata xenon

1 no Delivery: 15 days
#87

Valve Oil seal

tata xenon

16 nos Delivery: 15 days
#88

Assembly REF And HLA

tata xenon

16 nos Delivery: 15 days
#89

Timing Belt

tata xenon

1 no Delivery: 15 days
#90

Spacer Timing belt Idler

tata xenon

1 no Delivery: 15 days
#91

Leak off rail HP PUMP side

tata xenon

1 no Delivery: 15 days
#92

Assembly Oil filter

tata xenon

1 no Delivery: 15 days
#93

Air Filter Element

tata xenon

1 no Delivery: 15 days
#94

Assembly Pivot bush upper wishbone

tata xenon

4 nos Delivery: 15 days
#95

Ball Joint Assy Upper wish bond

tata xenon

2 nos Delivery: 15 days
#96

Assembly Lower ball joint

tata xenon

2 nos Delivery: 15 days
#97

Assembly front shock Absorber

tata xenon

2 nos Delivery: 15 days
#98

Assembly bump Stopper front

tata xenon

1 no Delivery: 15 days
#99

Assembly Link front antiroll bar

tata xenon

2 nos Delivery: 15 days
#100

Seal Oil

tata xenon

2 nos Delivery: 15 days
#101

Bushing synthetic

tata xenon

1 no Delivery: 15 days
#102

Bearing front differ LH side

tata xenon

1 no Delivery: 15 days
#103

Front axle shift fork kit

tata xenon

1 no Delivery: 15 days
#104

Bearing roller front diff RH Side

tata xenon

1 no Delivery: 15 days
#105

Assembly parking brake cable front ACEY

tata xenon

1 no Delivery: 15 days
#106

Assembly parking brake cable RH ACEY

tata xenon

1 no Delivery: 15 days
#107

Assembly parking brake cable LH ACEY

tata xenon

1 no Delivery: 15 days
#108

Tie Rod Assembly

tata xenon

2 nos Delivery: 15 days
#109

Center link Assembly RH Straght type

tata xenon

1 no Delivery: 15 days
#110

Assembly Fuel Tank Complete 70L

tata xenon

1 no Delivery: 15 days
#111

Assembly Rubber Bush Fuel Tank

tata xenon

8 nos Delivery: 15 days
#112

Water Pump Assembly

tata xenon

1 no Delivery: 15 days
#113

Gasket Water Pump

tata xenon

1 no Delivery: 15 days
#114

Gasket thermostat housing

tata xenon

1 no Delivery: 15 days
#115

Thermostat euro v

tata xenon

1 no Delivery: 15 days
#116

Brake flexible pipe rear

tata xenon

2 nos Delivery: 15 days
#117

Wheel Nut

tata xenon

2 nos Delivery: 15 days
#118

Front Axle shaft lock

tata xenon

2 nos Delivery: 15 days
#119

Left Side lock handle complete

tata xenon

1 no Delivery: 15 days
#120

Right side glass channel

tata xenon

1 no Delivery: 15 days
#121

Fuse pal bolt able 80A ISO 8820

tata xenon

1 no Delivery: 15 days
#122

Sensor wheel speed front

tata xenon

2 nos Delivery: 15 days
#123

Controller power window express down

tata xenon

1 no Delivery: 15 days
#124

Dual relay

tata xenon

1 no Delivery: 15 days
#125

Windshield washer kit 1point 5 Lt

tata xenon

1 no Delivery: 15 days
#126

Washer bottle filter neck PMP

tata xenon

1 no Delivery: 15 days
#127

Assembly washer nozzle with adapter

tata xenon

2 nos Delivery: 15 days
#128

T Joint for washer tube PMP

tata xenon

1 no Delivery: 15 days
#129

Lamp W5W 12V 5W 53 No 12V Pin Type

tata xenon

5 nos Delivery: 15 days
#130

Fog lamp bulb 12V

tata xenon

2 nos Delivery: 15 days
#131

Lamp assembly high moulding stop

tata xenon

1 no Delivery: 15 days
#132

Rectifier Assembly

tata xenon

1 no Delivery: 15 days
#133

Reg and connector moulding assembly

tata xenon

1 no Delivery: 15 days
#134

Brush Assembly

tata xenon

2 nos Delivery: 15 days
#135

Alternator lower mounting bolt with nut

tata xenon

1 no Delivery: 15 days
#136

Black paint

paint

3 ltr Delivery: 15 days
#137

White paint

paint

1 ltr Delivery: 15 days
#138

Red paint

paint

1 ltr Delivery: 15 days
#139

Yellow paint

paint

5 ltr Delivery: 15 days
#140

Hub oil seal Bolero

bolero

12 nos Delivery: 15 days
#141

Hub oil seal Maruti Gyspy

maruti gypsy

4 nos Delivery: 15 days
#142

Wheel covers Bolero

bolero

3 set Delivery: 15 days
#143

Wheel covers Maruti Gyspy

maruti gypsy

1 set Delivery: 15 days
#144

Wheel covers Innova

innova

1 set Delivery: 15 days
#145

Fog Lamp set

heavy vehicle

4 set Delivery: 15 days
#146

AC Filter innova

innova

1 no Delivery: 15 days
#147

M Oil Filter Motor Cycle TVS Apache 160 RTR

apache rtr160

10 nos Delivery: 15 days
#148

Air Cleaner Filter Bolero

bolero

3 nos Delivery: 15 days
#149

Air Cleaner Filter Maruti Gypsy

maruti gypsy

1 set Delivery: 15 days
#150

Indicator LH and RH Motor Cycle TVS Apache

apache rtr160

2 set Delivery: 15 days
#151

Seat cover cloth

heavy quality

60 metrs Delivery: 15 days
#152

Chain sprocket

apache rtr160

2 nos Delivery: 15 days
#153

Diesel Filter bolero

bolero

3 nos Delivery: 15 days
#154

Diesel Filter Tractor

sonilaka

1 no Delivery: 15 days
#155

Diesel Filter JCB

jcb

1 no Delivery: 15 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Annual Turnover

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
H D TRADERS   Under PMA
-06-01-2025 22:40:59
2
N C M Enterprises   Under PMA
-08-01-2025 09:57:19
3
SATNAM SPARE CENTER   Under PMA
-08-01-2025 10:00:49

Financial Results

Rank Seller Price Item
L1
SATNAM SPARE CENTER(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Rocker arm assy,Valve Exhaust,Valve intake,Seal valve stem oil,Spark plug,Plug cylinder head,Sprock
L2
H D TRADERS (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Rocker arm assy,Valve Exhaust,Valve intake,Seal valve stem oil,Spark plug,Plug cylinder head,Sprock

Frequently Asked Questions

Key insights about PUNJAB tender market

FAQs

Details are provided in the tender document.

1. What are the eligibility criteria for bidders?

Bidders must have a minimum of 1 year of experience supplying similar mechanical parts and an average annual turnover of at least INR 3 Lakhs for the last three years.

2. What documentation is required to participate in the tender?

Bidders need to submit documents confirming their experience criteria, past performance, turnover, and compliance with BoQ specifications.

3. Are there exemptions available for MSEs or startups?

Currently, there are no exemptions for years of experience or turnover criteria for MSEs or startups in this tender.

4. What are the technical requirements for the spare parts?

Parts must meet specified technical standards and comply with all specifications detailed in the BoQ of the tender document.

5. How is the Earnest Money Deposit (EMD) handled?

Unfortunately, specific details regarding the EMD are not provided in the documentation. Bidders must verify the requirement before submission.

6. What are the payment terms for awarded bidders?

Payments will be made post-delivery and depending upon the acceptance of the supplied goods based on specifications mentioned in the bid.

7. What is the evaluation process for the bids?

Bids will be evaluated based on total value, ensuring compliance with eligibility and technical standards defined in the tender.

8. When is the last date to submit bids?

The last date to submit bids is 08-01-2025, 11:00 AM.

9. What happens after the bid opening?

Once bids are opened on 08-01-2025, 11:30 AM, they will undergo a thorough evaluation based on predefined criteria.

10. Where can I view the main documents for this tender?

Main documents are available through the GeM portal via the provided Main Tender Document.

11. Are there specific standards that the products need to comply with?

Yes, all products must comply with the specifications outlined in the bid documents, ensuring they meet required quality standards.

12. How does the Make in India initiative impact this tender?

Procurement under this tender is reserved for Class 1 local suppliers, providing a preference to products manufactured in India under the Make in India initiative.

13. Can I seek clarification on technical aspects during evaluations?

Yes, bidders have a window of 2 days for technical clarifications during the technical evaluation phase of the bid process.

14. What is the minimum average turnover required?

Bidders must demonstrate a minimum average annual financial turnover of INR 3 Lakhs for the last three completed financial years.

15. Is there an inspection requirement for the procured items?

No, an inspection of the items is not required by pre-registered authorities during this tender process.