TenderDekho Logo
Active GEM

Open Tender for Buy back existing unit,New Ductable AC installation,Suction Line,Liquid Line,Acoustic line,Canvass in WEST DELHI, DELHI

Bid Publish Date

14-Aug-2026, 10:49 am

Bid End Date

11-Sep-2026, 3:00 pm

Progress

Issue14-Aug-2026, 10:49 am
AwardPending

Public procurement opportunity for Bhakra Beas Management Board Buy back existing unit, New Ductable AC installation, Suction Line, Liquid Line, Acoustic line, Canvass connection, Drain Pipe, FRLS and control cables, LT copper cable, GI wire, Stand for outdoor unit, Stand for indoor unit, Refrigerant gas, Testing, Electrical distribution panel in WEST DELHI, DELHI. Quantity: 665 issued by. Submission Deadline: 11-09-2026 15: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

665

Category

New Ductable AC installation

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

5 days

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Buy back existing unit , New Ductable AC installation , Suction Line , Liquid Line , Acoustic line , Canvass connection , Drain Pipe , FRLS and control cables , LT copper cable , GI wire , Stand for outdoor unit , Stand for indoor unit , Refrigerant gas , Testing , Electrical distribution panel

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

North West

Delivery Pincodes

110035

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sudhir Datt110035,XEN, O&M Division 220 KV sub station, B.B.M.B , old Rohtak Road Near Punjabi Bagh Metro station Delhi 110035North WestDelhi110035130-

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9752927.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Bhakra Beas Managemet Board

Office Name

Bhakra Beas Management Board, Chandigarh

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Buy back existing unit

Buyback with Dismantling of all existing air cooled package unit with pumps, piping and cooling tower etc

1 job Delivery: 30 days
#2

New Ductable AC installation

Supply and Installation and Testing and commissioning of advanced micro computer based high performance machine air Cooled Packaged Ductable Unit of minimum 8.5 TR capacity having indoor airflow capability of 400CFM per Ton with multiple energy efficient Scroll Compressors inbuilt electric control panel, first charging of R410 A refrigerant DX cooling coil thermostatic expansion valve air filter and blower section blower with motor coils initial charge of compressor oil.Capacity minimum 8.5 TR or Min. 400 CFM TR Make Bluestar or Trane or Carrier or York or Voltas or O General

3 nos Delivery: 30 days
#3

Suction Line

Supply and Installation of hard drawn refrigerant Copper Piping with nitrile insulation on suction line. Make Hariom or Mandev or Maxflow or Indigo or Mrajco Insulation Armacell or Aflex or Supreme. Suction line as per OEM

90 rmt Delivery: 30 days
#4

Liquid Line

Liquid line as per OEM

90 rmt Delivery: 30 days
#5

Acoustic line

Supplying and fixing of acoustic lining with open cell nitrile rubber having thickness of 15mm.Make Supreme or Aerofoam or A-flex or Armacell

70 sqmt Delivery: 30 days
#6

Canvass connection

Supply and Fixing of Canvass Connection.

3 nos Delivery: 30 days
#7

Drain Pipe

Supply and Installation of UPVC Drain Pipe.Make Supreme or Astral or Prince (32 mm to 50mm)

90 rmt Delivery: 30 days
#8

FRLS and control cables

Supply and installation of FRLS control cable PVC insulated PVC sheathed Steel armoured multistrand copper conductor control cable following size. Make Finolexor RR or Havells or KEI or Polycab 6 Core x 2.5 Sqmm

100 rmt Delivery: 30 days
#9

LT copper cable

Supplying laying of XLPE insulated PVC sheathed steel armoured 1.1KV Grade LT Copper Conductor power cable Make Finolex or RR or Havells or KEI or Polycab 4.0 Core x 2.5 Sqmm

90 rmt Delivery: 30 days
#10

GI wire

Providing and fixing 8 SWG dia G.I. wire on surface or in recess for loop earthing as required at site.

80 rmt Delivery: 30 days
#11

Stand for outdoor unit

Supply and installation of MS stand for outdoor units.

3 nos Delivery: 30 days
#12

Stand for indoor unit

Supply and installation of MS stand for indoor units.

3 nos Delivery: 30 days
#13

Refrigerant gas

Supply & charging of extra Refrigerant gas R410 A

40 kg Delivery: 30 days
#14

Testing

Nitrogen testing, vacuumizing and gas charging.

1 job Delivery: 30 days
#15

Electrical distribution panel

Design and fabrication and supply and installation of cubical type dead front Electrical distribution Panel made out of 14G CRCA sheet with suitable MCCBs, TPN and internal wiring etc. and instrumentation for minimum 11 TR X 4 Nos Package units as per standard make. The unit shall have sequential controller for operating 3 units. Note All the switchgears installed in the Electrical distribution panel of air-conditioning units shall be of ABB or SIEMENS or SCHNEIDER or L&T or TEKNIC make

1 no Delivery: 30 days

Categories 97

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Bidder Turnover

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer