1.0 Ton 5 star Split Inverter AC,1.5 Ton 5 star Split Inverter AC
National Institute Of Technology (nit)
DAKSHINA KANNADA, KARNATAKA
Bid Publish Date
23-Feb-2026, 12:14 pm
Bid End Date
13-Mar-2026, 9:00 am
Location
Progress
Quantity
5
Category
1.5 TON 5 STAR INVERTER HIGH-WALL MODEL SPLIT AIR CONDITIONER
Bid Type
Two Packet Bid
The opportunity is with National Aluminium Company Limited (NALCO), Bhubaneswar, for the procurement of 1.5 TON 5 STAR INVERTER HIGH-WALL MODEL SPLIT AIR CONDITIONER and 2 TON 5 STAR INVERTER HIGH-WALL MODEL SPLIT AIR CONDITIONER. The scope is limited to the supply of goods with delivery within 60 days of PO. Distinctive requirements include use of eco-friendly refrigerants (R-410A/R-32 or equivalent), 230V ±10%, 50 Hz, and operation at high ambient temperatures (50-55°C). Each unit must include a wireless LCD remote, auto-restart, copper coils, and specified accessories. The procurement aims to equip facilities under the Materials department in Bhubaneswar with compliant, energy-efficient cooling solutions. Specific delivery terms and certificate upload are mandatory, with emphasis on authorization from OEMs and compliance documentation.
Product: 1.5 TON inverter high-wall split AC
Product: 2 TON inverter high-wall split AC
Refrigerant: R-410A/R-32 or equivalent (zero ODP)
Voltage: 230V ±10%, 50 Hz
Ambient operation: 50-55°C
Accessories per unit: suction & discharge copper pipes, PVC drain, interconnect cable, vinyl tape, ODU bracket
Coils: copper evaporator and condenser; copper interconnecting refrigerant lines
Safety/Capacitors: P2/S2 safety class, 440V AC, -25°C to +85°C
Remote: wireless LCD remote with batteries
Delivery: 60 days from PO
EMD: not explicitly specified; ensure OEM authorization and certificates are submitted
Payment: 100% via e-mode within 10 days of CRAC; GST linked to GSTR-2A
Delivery: within 60 days of PO; installation details not specified
100% payment via electronic mode within 10 days of CRAC; GST payment contingent on seller invoice reflected in GSTR 2A/ANX-2
Material to be delivered within 60 days from receipt of purchase order; no installation clause specified
Penalty details not specified in data; bidders should verify terms in ATC/corrigendum
OEM authorization or authorized distributor with complete contact details
Experience in supplying inverter split AC units of similar tonnage
Ability to deliver within 60 days and provide required accessories per unit
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
National Institute Of Technology (nit)
DAKSHINA KANNADA, KARNATAKA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Gail India Limited
RANCHI, JHARKHAND
State Bank Of India (sbi)
JORHAT, ASSAM
National Fertilizers Limited (nfl)
ROHTAK, HARYANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Manufacturer Authorization OEM certificate with complete contact details
GST registration certificate
PAN card
Experience certificates for similar AC supply
Financial statements or turnover proof (where applicable)
Technical bid documents and product specification sheets
Emergency/after-sales service commitments and warranty terms
Delivery capability and installation support details
Bidders must submit OEM authorization, GST registration, PAN, and experience certificates, along with product specification sheets. Ensure 100% payment terms and GST compliance are understood; delivery within 60 days is required. Include warranty terms and installation support details if applicable.
Submit Manufacturer Authorization, GST certificate, PAN card, experience certificates for similar AC supplies, financial statements, technical bid, and OEM support documents. Upload refrigerant compliance and warranty terms; ensure accessories list matches specified items per unit.
Units must use ECO-FRIENDLY refrigerants (R-410A or R-32 or equivalent) with zero ODP; ensure 230V ±10%, 50 Hz operation and copper coils. Verify compatibility with 5 STAR inverter models and include wireless LCD remote.
Delivery must occur within 60 days of purchase order receipt. Confirm logistics, transport arrangements, and supplier readiness to meet this deadline, along with battery-backed remote and other per-unit accessories.
Payment is 100% via e-mode within 10 days of CRAC; GST payment linked to GSTR 2A/ANX-2. Ensure accurate invoicing and alignment with GST filing timelines to avoid payment delays.
Provide OEM authorization with full name, designation, address, email, and phone; ensure OEM supports warranty and after-sales service; include product specifications and certificate scans to validate compliance with ATC requirements.
Mandatory accessories include suction copper pipe with insulation (10 meters), discharge copper pipe with insulation (10 meters), PVC drain pipe (10 meters), interconnecting cable IDU-ODU (10 meters), vinyl tape (20 meters), and one ODU bracket. Confirm quantities per unit in the bid.
ACs must operate satisfactorily at ambient temperatures of 50-55°C and include an auto-restart feature after power failure, ensuring reliability in extreme heat conditions typical to Bhubaneswar facilities.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS