TenderDekho Logo
Closed GEM

Western Coalfields Limited Pipeline Extension Tender Chandrapur Maharashtra 8inch IS 550-IS 550-based Work 2026

Bid Publish Date

22-Oct-2026, 11:41 am

Bid End Date

02-Nov-2026, 12:00 pm

Value

₹4,84,264

Progress

Issue22-Oct-2026, 11:41 am
AwardPending

Key Highlights

  • • Official organization: Western Coalfields Limited (WCL) Ballarpur Area, Chandrapur, Maharashtra
  • • Project scope: extension of 8-inch pipeline at Sub Quarry II coal face (AGEPEOCM)
  • • Estimated value: ₹484,264; no BOQ items (scope-based tender)
  • • ATC: quantity/duration variation up to 50% permissible

Tender Overview

Organization: Western Coalfields Limited (Coal India Limited) – Ballarpur Area, Chandrapur, Maharashtra. Procurement: Extension of an 8-inch pipeline at coal face of Sub Quarry II of AGEPEOCM. Estimated value: ₹484,264. Location: Chandrapur, Maharashtra 441205. The contract covers on-site continuation/expansion of a pipeline system at the Ballarpur mine area, with ATC permitting up to 50% change in quantity or duration. Unique element: no BOQ items listed, suggesting a scope-driven service task rather than a fixed-price schedule. Bidders must align with bank/payment details provided for security deposits.

Technical Specifications & Requirements

  • Scope includes extension of 8-inch pipeline at the specified coal face in Ballarpur Area.
  • EMD/Performance Security: permitted forms include Demand Draft, FDR, or online RTGS/IS transfers to the account of WCL Ballarpur Area; 15-day delivery of hard copy/security deposit after award.
  • ATC clause permits contractor to accept up to 50% increase in quantity/duration at contract issue or with buyer’s consent for lumpsum services; price bid should reflect the uploaded price document.
  • Bank details: Beneficiary WCL, Ballarpur Area; SBIN0003078; account 10866164051; branch Ballarpur.
  • No technical specifications or performance standards are listed in the BOQ; bidders should prepare to demonstrate capability for pipeline work in a mining setting and adhere to site access and safety norms.

Terms, Conditions & Eligibility

  • 50% variation flexibility on contract quantity/duration; post-award flexibility remains up to 50%.
  • Payment security options: online RTGS, demand draft, or fixed deposit receipt accepted as security; required to upload scanned evidence within 15 days of award.
  • Ensure contract quoting includes total amount for entire period including GST as per uploaded Price Bid document.
  • Bank/payment details must be cited in transaction records for online transfers.
  • No BOQ items; scope-driven engagement requiring precise site execution and compliance with WCL Ballarpur Area terms.

Key Specifications

  • Product/Service: Extension of 8-inch pipeline at coal face

  • Estimated contract value: ₹484,264

  • Location: Sub Quarry II, AGEPEOCM, Ballarpur Area, Chandrapur, Maharashtra

  • EMD/Performance Security: DD/FDR or online RTGS permitted; proof within 15 days

  • ATC variation: up to 50% increase in scope post-award

  • Bank details for security: WCL Ballarpur Area, SBIN0003078, A/c 10866164051

Terms & Conditions

  • 50% scope variation allowed during bidding and after contract issue

  • Security deposits via DD, FDR, or online RTGS with 15-day delivery of originals

  • Quote must include GST-inclusive total contract price for entire period

Important Clauses

Payment Terms

Security deposit can be provided as DD, FDR, or online RTGS; must reference contract and bidder name; original hard copies to be delivered within 15 days of award

Delivery Schedule

Contract allows up to 50% variation in quantity/duration at the time of contract issue and up to 50% post-award with consent; no fixed BOQ schedule provided

Penalties/Liquidated Damages

Not explicitly stated in data; bidders should seek clarity during final ATC read and contract negotiations

Bidder Eligibility

  • Experience in pipeline installation/maintenance in mining or industrial environments

  • Ability to provide security deposit via DD, FDR, or online RTGS as per payment terms

  • Compliance with site safety and operational requirements for Ballarpur Area projects

Advertisement

Authority & Contact

Office Name

Wcl Nagpur Maharashtra

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Similar Category

Manpower Outsourcing Services - Minimum wage

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

No

MII Compliance

Yes

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Custom Bid for Services - Extension of 8inch pipeline at coal face of Sub Quarry II of AGEPEOCM of Ballarpur Area

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

3

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Regional Stores

Delivery Pincodes

442706

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vishal Patha442706,Regional Stores, WCL Ballarpur Area PO Sasti Distt Chandrapur (M.S) Pin 442 706Regional Stores-442706Project / Lumpsum Based--

Authority Records

MINISTRY OF COALCOAL INDIA LIMITEDWESTERN COALFIELDS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 12

GeM-Bidding-10065113.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 2

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates related to pipeline installation/maintenance in mining or industrial settings

4

Financial statements or turnover proof (if requested under auction/contract terms)

5

EMD/Performance Security documents (DD, FDR or RTGS proof)

6

Technical bid documents or conformity declarations

7

OEM authorizations or contractor credentials (if applicable)

8

Any site-specific safety and environment certifications

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for the pipeline extension tender in Chandrapur Maharashtra 2026?

Bidders should prepare GST registration, PAN, experience certificates for mining pipeline work, financial statements, and security deposit documents (DD, FDR, or online RTGS) with proof within 15 days of award. Include total GST-inclusive price as per the uploaded Price Bid document.

What are the eligibility criteria for WCL Ballarpur tender in 2026?

Eligible bidders must demonstrate prior pipeline installation/maintenance experience in mining settings, provide valid GST and PAN, furnish financial statements if required, and supply security deposits via DD, FDR, or online RTGS to WCL Ballarpur Area with contract reference.

What documents are required to submit for this tender in Ballarpur?

Submit GST certificate, PAN card, mining/pipeline experience certificates, financial statements, EMD/security deposit proofs (DD/FDR/RTGS), technical conformity declarations, or OEM authorizations if applicable, and any site safety certifications required by WCL Ballarpur Area.

What is the scope of the 8-inch pipeline extension tender in Ballarpur?

Scope involves extension work at the Sub Quarry II coal face of AGEPEOCM within Ballarpur Area; no BOQ items are listed, so bidders must rely on site-based specifications and the uploaded price bid to define work quantities.

What are the payment terms for WCL Ballarpur pipeline contract 2026?

Security deposits can be paid via DD, FDR, or RTGS; online payment must reference contract name and bidder; delivery of hard copy security documents required within 15 days of award; GST-inclusive total price must be quoted.

How does the 50% variation clause affect the contract in this tender?

The buyer may increase or decrease contract quantity or duration by up to 50% at contract issue or within the contract period, with the provider's consent for lumpsum services; this impacts pricing, delivery planning, and resource allocation.

Where to find the bank details for security deposit in this tender?

Bank details are provided: Beneficiary WCL, Ballarpur Area, Account No 10866164051, IFSC SBIN0003078, Bank State Bank of India, Branch Ballarpur; mention contract number and seller name in transfer notes.

What is the estimated contract value for the Chandrapur pipeline tender 2026?

The estimated value is ₹484,264; bidders should prepare a GST-inclusive quote reflecting the price bid document uploaded with the tender.

Advertisement