TenderDekho Logo
Closed GEM

Contract Bidding Open For Supply of Server along with Storage,Supply of Software based solutions,Supply of Camera connection in RAIPUR, CHHATTISGARH

Bid Publish Date

30-May-2025, 3:30 pm

Bid End Date

02-Jul-2025, 10:00 am

EMD

₹1,04,477

Value

₹52,23,868

Progress

Issue30-May-2025, 3:30 pm
Corrigendum27-Jun-2025
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

12713

Category

Supply of ANPR Camera along with required accessories

Bid Type

Two Packet Bid

Categories 84

Public procurement opportunity for Airports Authority Of India Supply of Server along with Storage, Supply of Software based solutions, Supply of Camera connection license with Failover, Supply of Workstation for Control room, Supply of 24 port POE switch, Supply of 8 port POE switch, Supply of 6 F SM Multi tube, Supply of 12 Port Loaded LIU LC-Type, Supply of 42 U Racks, Supply of 9U Wall Mount Enclosures specially designed for small networking, Supply of ANPR Camera along with required accessories, Supply of Driver Image camera along with required accessories, Supply of Surge Protector RJ-45 For Outdoor Cameras, Supply of Bullet or Dome camera, Supply of 5 Mts FRP Pole, Supply of CAT6 Patch Cords 2 Mtr, Supplying and drawing of UTP 4 pair CAT 6 LAN Cable, Supply of Cat 6 Patch Panel Loaded, Supply of weather proof junction box IO Connectors Back Box, Providing laying and fixing dia G. I. pipe 32 mm dia, Supply of HDPE PLB Duct Pipe of size 32mm OD, SITC of 5KVA capacity Online UPS, SITC of 2KVA capacity Online UPS, Supply of 24U rack, Supply of 3C x 2. 5sqmm size, Supply of MCP Both End UPS, Supply of Single Mode Patch Cord 2 Mtrs, Supply of GPS Network Time Protocol Server. , Supply of Multi Function Laser Printer, Laying of 32 mm outer dia PLB HDPE Pipe, Laying of 32mm size PLB HDPE pipe, Laying of one number PVC insulated and PVC sheathed XLPE power cable a 6F OFC Cable, Laying of one number PVC insulated and PVC sheathed XLPE power cable b Upto 35 Sqmm, Supply and making end termination a 3 X 4 sqmm, Copper Conductor Cable, Laying of one number PVC insulated a Upto 35 Sqmm, Laying of one number PVC insulated b. 6 F SM Multi tube single sheath Armoured OFC Cable, Providing of rectangular type chamber, Installation, testing and commissioning of entire project, Comprehensive Annual Maintenance Contract 1st Year After Warranty Period, Comprehensive Maintenance Contract 2nd Year After Warranty Period, Comprehensive Maintenance Contract 3rd Year After Warranty Period in RAIPUR, CHHATTISGARH. Quantity: 12713 issued by. Submission Deadline: 02-07-2025 10: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Supply of Server along with Storage , Supply of Software based solutions , Supply of Camera connection license with Failover , Supply of Workstation for Control room , Supply of 24 port POE switch , Supply of 8 port POE switch , Supply of 6 F SM Multi tube , Supply of 12 Port Loaded LIU LC-Type , Supply of 42 U Racks , Supply of 9U Wall Mount Enclosures specially designed for small networking , Supply of ANPR Camera along with required accessories , Supply of Driver Image camera along with required accessories , Supply of Surge Protector RJ-45 For Outdoor Cameras , Supply of Bullet or Dome camera , Supply of 5 Mts FRP Pole , Supply of CAT6 Patch Cords 2 Mtr , Supplying and drawing of UTP 4 pair CAT 6 LAN Cable , Supply of Cat 6 Patch Panel Loaded , Supply of weather proof junction box IO Connectors Back Box , Providing laying and fixing dia G.I. pipe 32 mm dia , Supply of HDPE PLB Duct Pipe of size 32mm OD , SITC of 5KVA capacity Online UPS , SITC of 2KVA capacity Online UPS , Supply of 24U rack , Supply of 3C x 2.5sqmm size , Supply of MCP Both End UPS , Supply of Single Mode Patch Cord 2 Mtrs , Supply of GPS Network Time Protocol Server. , Supply of Multi Function Laser Printer , Laying of 32 mm outer dia PLB HDPE Pipe , Laying of 32mm size PLB HDPE pipe , Laying of one number PVC insulated and PVC sheathed XLPE power cable a 6F OFC Cable , Laying of one number PVC insulated and PVC sheathed XLPE power cable b Upto 35 Sqmm , Supply and making end termination a 3 X 4 sqmm, Copper Conductor Cable , Laying of one number PVC insulated a Upto 35 Sqmm , Laying of one number PVC insulated b. 6 F SM Multi tube single sheath Armoured OFC Cable , Providing of rectangular type chamber , Installation ,testing and commissioning of entire project , Comprehensive Annual Maintenance Contract 1st Year After Warranty Period , Comprehensive Maintenance Contract 2nd Year After Warranty Period , Comprehensive Maintenance Contract 3rd Year After Warranty Period

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7905192.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 41 Items Sign in for GEM prices

#1

Supply of Server along with Storage

Supply of Server along with Storage

1 each Delivery: 150 days
#2

Supply of Software based solutions

Supply of Software based solutions

2 each Delivery: 150 days
#3

Supply of Camera connection license with Failover

Supply of Camera connection license with Failover

2 each Delivery: 150 days
#4

Supply of Workstation for Control room

Supply of Workstation for Control room

1 each Delivery: 150 days
#5

Supply of 24 port POE switch

Supply of 24 port POE switch

1 set Delivery: 150 days
#6

Supply of 8 port POE switch

Supply of 8 port POE switch

4 each Delivery: 150 days
#7

Supply of 6 F SM Multi tube

Supply of 6 F SM Multi tube

1,725 meter Delivery: 150 days
#8

Supply of 12 Port Loaded LIU LC-Type

Supply of 12 Port Loaded LIU LC-Type

2 each Delivery: 150 days
#9

Supply of 42 U Racks

Supply of 42 U Racks

1 each Delivery: 150 days
#10

Supply of 9U Wall Mount Enclosures specially designed for small networking

Supply of 9U Wall Mount Enclosures specially designed for small networking

2 each Delivery: 150 days
#11

Supply of ANPR Camera along with required accessories

Supply of ANPR Camera along with required accessories

2 each Delivery: 150 days
#12

Supply of Driver Image camera along with required accessories

Supply of Driver Image camera along with required accessories

2 each Delivery: 150 days
#13

Supply of Surge Protector RJ-45 For Outdoor Cameras

Supply of Surge Protector RJ-45 For Outdoor Cameras

2 each Delivery: 150 days
#14

Supply of Bullet or Dome camera

Supply of Bullet or Dome camera

4 each Delivery: 150 days
#15

Supply of 5 Mts FRP Pole

Supply of 5 Mts FRP Pole

2 each Delivery: 150 days
#16

Supply of CAT6 Patch Cords 2 Mtr

Supply of CAT6 Patch Cords 2 Mtr

5 each Delivery: 150 days
#17

Supplying and drawing of UTP 4 pair CAT 6 LAN Cable

Supplying and drawing of UTP 4 pair CAT 6 LAN Cable

300 meter Delivery: 150 days
#18

Supply of Cat 6 Patch Panel Loaded

Supply of Cat 6 Patch Panel Loaded

9 each Delivery: 150 days
#19

Supply of weather proof junction box IO Connectors Back Box

Supply of weather proof junction box IO Connectors Back Box

4 each Delivery: 150 days
#20

Providing laying and fixing dia G.I. pipe 32 mm dia

Providing laying and fixing dia G.I. pipe 32 mm dia

30 meter Delivery: 150 days
#21

Supply of HDPE PLB Duct Pipe of size 32mm OD

Supply of HDPE PLB Duct Pipe of size 32mm OD

3,150 meter Delivery: 150 days
#22

SITC of 5KVA capacity Online UPS

SITC of 5KVA capacity Online UPS

1 each Delivery: 150 days
#23

SITC of 2KVA capacity Online UPS

SITC of 2KVA capacity Online UPS

1 each Delivery: 150 days
#24

Supply of 24U rack

Supply of 24U rack

1 each Delivery: 150 days
#25

Supply of 3C x 2.5sqmm size

Supply of 3C x 2.5sqmm size

1,725 meter Delivery: 150 days
#26

Supply of MCP Both End UPS

Supply of MCP Both End UPS

1 each Delivery: 150 days
#27

Supply of Single Mode Patch Cord 2 Mtrs

Supply of Single Mode Patch Cord 2 Mtrs

12 each Delivery: 150 days
#28

Supply of GPS Network Time Protocol Server.

Supply of GPS Network Time Protocol Server.

1 each Delivery: 150 days
#29

Supply of Multi Function Laser Printer

Supply of Multi Function Laser Printer

1 each Delivery: 150 days
#30

Laying of 32 mm outer dia PLB HDPE Pipe

Laying of 32 mm outer dia PLB HDPE Pipe

2,205 meter Delivery: 150 days
#31

Laying of 32mm size PLB HDPE pipe

Laying of 32mm size PLB HDPE pipe

315 meter Delivery: 150 days
#32

Laying of one number PVC insulated and PVC sheathed XLPE power cable a 6F OFC Cable

Laying of one number PVC insulated and PVC sheathed XLPE power cable a 6F OFC Cable

315 meter Delivery: 150 days
#33

Laying of one number PVC insulated and PVC sheathed XLPE power cable b Upto 35 Sqmm

Laying of one number PVC insulated and PVC sheathed XLPE power cable b Upto 35 Sqmm

315 meter Delivery: 150 days
#34

Supply and making end termination a 3 X 4 sqmm, Copper Conductor Cable

Supply and making end termination a 3 X 4 sqmm, Copper Conductor Cable

6 each Delivery: 150 days
#35

Laying of one number PVC insulated a Upto 35 Sqmm

Laying of one number PVC insulated a Upto 35 Sqmm

1,260 meter Delivery: 150 days
#36

Laying of one number PVC insulated b. 6 F SM Multi tube single sheath Armoured OFC Cable

Laying of one number PVC insulated b. 6 F SM Multi tube single sheath Armoured OFC Cable

1,260 meter Delivery: 150 days
#37

Providing of rectangular type chamber

Providing of rectangular type chamber

6 job Delivery: 150 days
#38

Installation ,testing and commissioning of entire project

Installation ,testing and commissioning of entire project

1 job Delivery: 150 days
#39

Comprehensive Annual Maintenance Contract 1st Year After Warranty Period

Comprehensive Annual Maintenance Contract 1st Year After Warranty Period

12 month Delivery: 150 days
#40

Comprehensive Maintenance Contract 2nd Year After Warranty Period

Comprehensive Maintenance Contract 2nd Year After Warranty Period

12 month Delivery: 150 days
#41

Comprehensive Maintenance Contract 3rd Year After Warranty Period

Comprehensive Maintenance Contract 3rd Year After Warranty Period

12 month Delivery: 150 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Corrigendum Updates

5 Updates
#1

Update

27-Jun-2025
#2

Update

18-Jun-2025
#3

Update

18-Jun-2025
#4

Update

18-Jun-2025
#5

Update

03-Jun-2025

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

What are the eligibility requirements for participating in the tender?

The eligibility requirements for bidders include being a registered entity, possessing relevant experience in similar projects, and having the necessary certifications for installation and distribution of surveillance systems. Financial stability proof and past performance in similar contracts will be critically evaluated to ensure credibility.

What certificates are necessary for submission?

Bidders must submit valid licenses or certificates confirming their ability to supply and install security surveillance systems. This includes compliance documents that verify adherence to quality standards, safety regulations, and operational compatibilities.

How do I register and submit my tender documents?

The registration process involves signing up on the designated e-procurement platform, creating a bidder profile, and familiarizing with submission protocols. All required documents must be uploaded in the specified formats within the designated submission section of the portal.

What are the required technical specifications for the system?

The technical specifications encompass the supply of various components including servers, different types of cameras (ANPR and Driver Image cameras), network components, and power supply units. Compliance with stipulated operational standards for airport systems is paramount.

What are the evaluation criteria for financial bids?

Evaluation of financial bids will consider the overall pricing, adherence to itemized proposals, and capability to deliver within set timelines. Bidder capacity to fulfill financial terms and conditions, along with competitive pricing compared to market rates, will also be a significant factor in the selection process.