TenderDekho Logo
Active GEM

Invitation to Bid - RAW Water Tank Open Well Submersible Pump 3 Phase 3 Hp,RAW Water Tank Open Well Submersible Pump 3 in CHENNAI, TAMIL NADU

Bid Publish Date

23-Oct-2026, 5:43 pm

Bid End Date

14-Nov-2026, 6:00 pm

EMD

₹8,200

Progress

Issue23-Oct-2026, 5:43 pm
AwardPending

Chennai Metro Rail Ltd has released a public tender for RAW Water Tank Open Well Submersible Pump 3 Phase 3 Hp, RAW Water Tank Open Well Submersible Pump 3 Phase 1 point 5 Hp, Slug Tank Open Well Vertical Centrifugal Pump 3 Phase 3 Hp, Slug Tank Open Well Vertical Centrifugal Pump 3 Phase 1 point 5 Hp, Gear Box Motor Ratio 1 7 5, Gear Box Motor Ratio 1 40, Solenoid Valve, Pneumatic Cylinder Front and Rear Station, Pneumatic Cylinder Vertical Brush Station, Pneumatic Cylinder Eaves Brush Station, FRL Unit, Pneumatic Fittings, Pressure Operated Angle Seat Valve, Pneumatic Hose 8mm, Pneumatic Hose 12mm in CHENNAI, TAMIL NADU. Quantity: 278. Submission Deadline: 14-11-2026 18: 00: 00. Download documents and apply online.

Advertisement

Tender Data

Bid Details

Quantity

278

Category

RAW Water Tank Open Well Submersible Pump 3 Phase 3 Hp

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

RAW Water Tank Open Well Submersible Pump 3 Phase 3 Hp , RAW Water Tank Open Well Submersible Pump 3 Phase 1 point 5 Hp , Slug Tank Open Well Vertical Centrifugal Pump 3 Phase 3 Hp , Slug Tank Open Well Vertical Centrifugal Pump 3 Phase 1 point 5 Hp , Gear Box Motor Ratio 1 7 5 , Gear Box Motor Ratio 1 40 , Solenoid Valve , Pneumatic Cylinder Front and Rear Station , Pneumatic Cylinder Vertical Brush Station , Pneumatic Cylinder Eaves Brush Station , FRL Unit , Pneumatic Fittings , Pressure Operated Angle Seat Valve , Pneumatic Hose 8mm , Pneumatic Hose 12mm

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Chennai

Delivery Pincodes

600107

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Bharath C600107,Chennai Metro Rail Limited Admin Building, CMRL Depot, Poonamallee High Road, KoyambeduChennaiTamil Nadu6001072120-

Authority Records

MINISTRY OF HOUSING AND URBAN AFFAIRSCHENNAI METRO RAIL LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10006380.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

RAW Water Tank Open Well Submersible Pump 3 Phase 3 Hp

RAW Water Tank Open Well Submersible Pump 3 Phase 3 Hp

2 pieces Delivery: 120 days
#2

RAW Water Tank Open Well Submersible Pump 3 Phase 1 point 5 Hp

RAW Water Tank Open Well Submersible Pump 3 Phase 1 point 5 Hp

1 pieces Delivery: 120 days
#3

Slug Tank Open Well Vertical Centrifugal Pump 3 Phase 3 Hp

Slug Tank Open Well Vertical Centrifugal Pump 3 Phase 3 Hp

1 pieces Delivery: 120 days
#4

Slug Tank Open Well Vertical Centrifugal Pump 3 Phase 1 point 5 Hp

Slug Tank Open Well Vertical Centrifugal Pump 3 Phase 1 point 5 Hp

1 pieces Delivery: 120 days
#5

Gear Box Motor Ratio 1 7 5

Gear Box Motor Ratio 1 7 5

10 pieces Delivery: 120 days
#6

Gear Box Motor Ratio 1 7 5

Gear Box Motor Ratio 1 7 5

12 pieces Delivery: 120 days
#7

Gear Box Motor Ratio 1 40

Gear Box Motor Ratio 1 40

2 pieces Delivery: 120 days
#8

Solenoid Valve

Solenoid Valve

12 pieces Delivery: 120 days
#9

Pneumatic Cylinder Front and Rear Station

Pneumatic Cylinder Front and Rear Station

2 pieces Delivery: 120 days
#10

Pneumatic Cylinder Vertical Brush Station

Pneumatic Cylinder Vertical Brush Station

8 pieces Delivery: 120 days
#11

Pneumatic Cylinder Eaves Brush Station

Pneumatic Cylinder Eaves Brush Station

2 pieces Delivery: 120 days
#12

FRL Unit

FRL Unit

1 pieces Delivery: 120 days
#13

Pneumatic Fittings

Pneumatic Fittings

20 pieces Delivery: 120 days
#14

Pressure Operated Angle Seat Valve

Pressure Operated Angle Seat Valve

4 pieces Delivery: 120 days
#15

Pneumatic Hose 8mm

Pneumatic Hose 8mm

100 meter Delivery: 120 days
#16

Pneumatic Hose 12mm

Pneumatic Hose 12mm

100 meter Delivery: 120 days

Categories 39

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement